Admin Alert: Time Gobbling Tasks for a System Upgrade

Published: February 4, 2009

by Joe Hertvik

Last week, I discussed four critical things to beware of during an i5/OS system upgrade. This week, let's look at a fifth critical item: upgrade time. I'll examine a few necessary and optional procedures that can add extra time to your upgrade process, and I'll explain the benefits that each procedure can bring you.

When planning your i5/OS upgrade window, be sure to take into account the following critical issues that will add extra time to your upgrade process. Some of these issues are optional and provide additional benefits as you move to a new operating systems. Other items are required duties that need to be performed to make your upgrade successful. I recommend that you review all of these items as they apply to your situation, and make sure that you perform whichever functions are necessary as you upgrade.

Prepare for Install PTFs--For many upgrades, IBM supplies a CD containing "Prepare for Install PTFs" that will prep your system to be upgraded. Installing these PTFs is easy, but it will take an additional IPL to apply them to your operating system so be sure to budget time for this before you upgrade your system. If you have some flexibility in taking your target partition down, you can save time on upgrade day by IPLing your system to apply these PTFs several days before the upgrade.

Pre-upgrade full system backup--When you upgrade your box, you are changing a number of things about your configuration that cannot easily be rolled back. I would never think about starting a system upgrade without taking a full system backup of my entire system. With a backup, if something goes wrong with the upgrade you will have a pre-upgrade version of the system for restoration, if necessary.

Post-upgrade backup--If you have the luxury of performing a second full system backup after the upgrade is finished, I encourage you to do so. Depending on how often you take down your machine, it may be a long time before you can backup the new operating system and its converted data. With a post-upgrade backup, you will be able to restore the upgraded system in the event of a catastrophic failure. If you don't have a post-upgrade backup and disaster occurs, you would have to go back and restore the system to its prior release and then perform the upgrade again.

If time prevents you from backing up the entire system, I recommend that you at least perform a partial system backup after the upgrade. A good partial backup will consist of the following two items that you may be able to use to restore your system.

1. A system and user configuration data backup. You can perform this backup by running the Save System (SAVSYS) command. SAVSYS saves three critical sets of data to your backup media: your OS/400 licensed internal code (LIC) and i5/OS objects that are stored in the QSYS library; security data, including your user profiles and private authorities; and your system configuration objects. These are the baseline objects that you would need to restore to get your newly upgraded system running again.

2. Your IBM-supplied libraries. You can save all the IBM libraries by running the following Save Library (SAVLIB) command with the Library (LIB) parameter set to *IBM.

SAVLIB LIB(*IBM) DEV(tape_drive_name)

This will save all the IBM libraries that contain your new operating system code. Be aware, however, that there are certain IBM libraries that are not saved by this command. The following IBM-supplied libraries are not included when you run SAVLIB with the *IBM parameter.

QDOC        QRCYxxxxx   QTEMP       QUSRRDARS 
QDOCxxxx    QRECOVERY   QUSER38     QUSRSYS   
QDSNX       QRPLOBJ     QUSRADSM    QUSRVI    
QGPL        QRPLxxxxx   QUSRBRM     QUSRVxRxMx
QGPL38      QSPL        QUSRDIRCL 
QMGTC       QSPLxxxx    QUSRDIRDB 
QMGTC2      QSRV        QUSRIJS   
QMPGDATA    QSRVAGT     QUSRINFSKR
QMQMDATA    QSYS        QUSRNOTES 
QMQMPROC    QSYSxxxxx   QUSROND   
QPFRDATA    QSYS2       QUSRPOSGS 
QRCL        QSYS2xxxxx  QUSRPOSSA 
QRCLxxxxx   QS36F       QUSRPYMSVR

Even though these libraries start with a 'Q' (the usual specification for IBM-supplied libraries), they are not considered system libraries and will not be saved with this command. If you want to save any of these libraries after your upgrade, you'll need to run a special backup. You may want to save the QGPL library, in particular, because many shops store user-modified versions of IBM objects in that library.

Database File Header Conversion--After upgrading the system, you may temporarily notice that the machine is suffering from slow database access. On i5/OS V5R3-to-V5R4 upgrades, the operating system will convert and rebuild all existing files' database file header information the first time each file is accessed. The operating system does this to eliminate performance degradation that could be introduced when the files start running under the Enhanced Hardware Storage Protection support that was introduced in V5R4. The problem is that if you have a large number of database files, the database header rebuilds can cause your user applications to run slowly until all the rebuild activity is finished.

To minimize any system delays that can occur while i5/OS rebuilds the database headers, you can front-load the rebuilds and have the system convert a large number of your user files before the users ever touch the system. To front-load the rebuilds, run any of these three i5/OS functions before the users get on the system.

1. Run a Display Object Description (DSPOBJD) command over a single file or over a group of files. DSPOBJD opens each object's file headers to display user file information. To run DSPOBJD over all the user-supplied files on your system, use the following Submit Job (SBMJOB) command to rebuild the headers in the batch QSYSWRK subsystem.

SBMJOB CMD(DSPOBJD OBJ(*ALLUSR/*ALL) 
OBJTYPE(*FILE) OUTPUT(*PRINT)) JOB(DSPOBJD)
JOBQ(QSYS/QSYSNOMAX) 

This command may take a while to run but by the time it finishes, all the database file headers will be converted to their new format.

2. Run the Display Library (DSPLIB) command over all your user libraries. Like DSPOBJD, DSPLIB also kicks off the database file header conversion process for any file in its target libraries. To submit DSPLIB to start the conversion on all your user libraries, run the following SBMJOB command:

SBMJOB CMD(DSPLIB LIB(*ALLUSR) OUTPUT(*PRINT))
JOB(DSPLIB)JOBQ(QSYS/QSYSNOMAX)

When this command finishes running, all your database file headers will be converted.

3. Perform a backup on your user libraries. If you add a user library backup to your post-upgrade backups, the operating system will convert each file's header before that file is saved to media. To only save your user libraries, run the following Save Library (SAVLIB) command:

SAVLIB LIB(*ALLUSR) DEV(tape_device_name)

All three commands will convert your database file headers. It's just a matter of which command you feel most comfortable with running. In terms of timing, you should budget extra time for these commands to complete after your upgrade (at least one to two hours, depending on which command you are running and the number and size of your user files).

PTF Application--Don't forget to apply the latest cumulative and group PTFs after the system upgrade is finished. PTF application will bring your system up to its most current level. It will also apply fixes for common problems that IBM has issued since the operating system was originally released.

To find the most recent PTF IDs, descriptions, workgroup levels, and the date each PTF group was released for all active i5/OS operating system, go to IT Jungle's System i PTF Guide. Maintained by DLB Associates, this PTF guide is updated weekly and contains the latest information on all IBM PTFs that are now available.

When you order PTFs, you should first order the latest cumulative PTF package for the new release, which is always shipped with the most recent High Impact/Pervasive (HIPERs) PTF group, as well as the latest Database PTF group. In addition to these PTFs, you also need to order and apply the latest updates for any other PTF groups that are installed on your system. To get the current list of PTF groups, run the Work with Program Temporary Fix Groups (WRKPTFGRP) command. WRKPTFGRP will give you a list of all the current PTF groups on your systems, their PTF IDs, and the current software level of each PTF group. Once you know which PTF groups are installed on your system, you can compare this information against the PTF listings at IT Jungle's System i PTF Guide to determine which group PTFs you need to order.

Enter IBM license keys--Whenever you upgrade your operating system, IBM requires that you enter new license keys for all its licensed products. If you fail to enter the keys, the products will only work for a specified grace period. You may receive the new license keys with your hardware order. If not, be sure to contact IBM or a business partner to retrieve the keys before you perform your upgrade.

IBM license key application is not difficult and it doesn't take too long. Once you have your keys, you can usually enter all the licenses in 15 minutes to a half-hour.

Time Wasted? Not At All!

Although these tasks will take extra time when you upgrade an i5/OS system, they are not a waste of time. Rather, they are important items that need to be done for a successful system upgrade. When performing your upgrade, be sure to factor in additional time to complete each of these important steps.


RELATED STORY AND RESOURCE

Four Things to Beware of During a System Upgrade

System i PTF Guide



                     Post this story to del.icio.us
               Post this story to Digg
    Post this story to Slashdot


Sponsored By
SYSTEM i DEVELOPER

Take it to the Summit!

Come to the RPG & DB2 Summit in Orlando,
April 15-17, for three full days of intense
education focused on RPG IV, SQL, DB2, ILE,
V6R1, RSE/WDSC/RDi, the Web & more.

Learn the latest in practical, usable tips and
techniques from top gurus Susan Gantner,
Skip Marchesani, Jon Paris, Paul Tuohy,
Scott Klement
and others in a highly
interactive, fun, invigorating environment. You'll
leave the Summit re-energized and eager to
use all your new skills and ideas.

Register today and save up to $400!
$995 registration ends February 20.


Senior Technical Editor: Ted Holt
Technical Editor: Joe Hertvik
Contributing Technical Editors: Edwin Earley, Brian Kelly, Michael Sansoterra
Publisher and Advertising Director: Jenny Thomas
Advertising Sales Representative: Kim Reed
Contact the Editors: To contact anyone on the IT Jungle Team
Go to our contacts page and send us a message.

Sponsored Links

PowerTech:  Ensure your IBM i data is secure. Join a complimentary Webinar now!
Vision Solutions:  Journaling for System i resilience. Learn more.
COMMON:  Join us at the 2009 annual meeting and expo, April 26-30, Reno, Nevada


 

IT Jungle Store Top Book Picks

Easy Steps to Internet Programming for AS/400, iSeries, and System i: List Price, $49.95
Getting Started with PHP for i5/OS: List Price, $59.95
The System i RPG & RPG IV Tutorial and Lab Exercises: List Price, $59.95
The System i Pocket RPG & RPG IV Guide: List Price, $69.95
The iSeries Pocket Database Guide: List Price, $59.00
The iSeries Pocket Developers' Guide: List Price, $59.00
The iSeries Pocket SQL Guide: List Price, $59.00
The iSeries Pocket Query Guide: List Price, $49.00
The iSeries Pocket WebFacing Primer: List Price, $39.00
Migrating to WebSphere Express for iSeries: List Price, $49.00
iSeries Express Web Implementer's Guide: List Price, $59.00
Getting Started with WebSphere Development Studio for iSeries: List Price, $79.95
Getting Started With WebSphere Development Studio Client for iSeries: List Price, $89.00
Getting Started with WebSphere Express for iSeries: List Price, $49.00
WebFacing Application Design and Development Guide: List Price, $55.00
Can the AS/400 Survive IBM?: List Price, $49.00
The All-Everything Machine: List Price, $29.95
Chip Wars: List Price, $29.95


 
The Four Hundred
Hogging the Ground Day

IBM Sunsets i5/OS V5R4, Kills Older 595 Iron

MaxAva Gets Inventive With Subscription Model for HA

IBM Rejiggers Power Systems, System i and p Prices

Deconstructing and Rebuilding IBM's Q4 Server Sales

Four Hundred Stuff
i OS Vendors Take Different Approaches to Poor Economy

RPG Gets Mixed Up in EGL Jam

Vault400 Debuts Tiered DR and Managed HA Services

Zend's PHP to be Preloaded Onto IBM i OS

Bring Your IT Ideas to Life, mrc Says

Four Hundred Monitor
Four Hundred Monitor's
Full iSeries Events Calendar

System i PTF Guide
January 31, 2009: Volume 11, Number 5

January 24, 2009: Volume 11, Number 4

January 17, 2009: Volume 11, Number 3

January 10, 2009: Volume 11, Number 2

January 3, 2009: Volume 11, Number 1

December 27, 2008: Volume 10, Number 52

TPM at The Register
Sun taps ex-Merrill, ex-Fannie Mae exec for board

Intel to spill Nehalem secrets

Novell cuts 1000 100 workers

Ex-IntelCrayAkamai startup rejiggers virtualization

T3 girds loins for IBM legal fight

HP gives SMBs zero per cent financing

Citrix ejects 10 per cent of staff

US House OKs Obama's IT stimulus

Exploding core counts: Heading for the buffers

GeoCluster - Windows from here to Timbuktu

Sun will Rock in 2009

Big Sparc crunches Sun's Q2

Sun goes eco-friendly with data center compression

IBM whittles x64 iron prices

THIS ISSUE SPONSORED BY:

WorksRight Software
Help/Systems
System i Developer


Printer Friendly Version


TABLE OF CONTENTS
A Bevy of BIFs: Look Up to %LookUp

Treasury Of New DB2 6.1 Features, Part 1: Query Enhancements

Admin Alert: Time Gobbling Tasks for a System Upgrade

Four Hundred Guru

BACK ISSUES

From the IT Jungle Forums
Insert via Java

iSeries Access for Web

Mimix installation and configuration docs

EDI Inovis Programmer - Heavy Duty Problem Solver - Anytime

Data Queues vs. MQ Series: Performance

Removing blanks from a CL Variable

XML




 
Subscription Information:
You can unsubscribe, change your email address, or sign up for any of IT Jungle's free e-newsletters through our Web site at http://www.itjungle.com/sub/subscribe.html.

Copyright © 1996-2009 Guild Companies, Inc. All Rights Reserved.
Guild Companies, Inc., 50 Park Terrace East, Suite 8F, New York, NY 10034

Privacy Statement