tfh
Volume 19, Number 16 -- April 26, 2010

SAP Tests Prove i 7.1 Performance Boost Over i 6.1

Published: April 26, 2010

by Timothy Prickett Morgan

The new i For Business 7.1 operating system for Power Systems servers is not just about gussying up i 6.1.1 a little and slapping a new label on it, but making some real changes to the operating system to goose performance on a number of workloads. As The Four Hundred reported last week, IBM made a bunch of improvements in the DB2 for i database, and as it turns out IBM has put the new Power 750 server through some benchmark paces to show how the upgraded software can goose even a new machine.

While i 6.1.1 will technically run on Power7-based servers, i 7.1 was designed to more fully exploit its features. Just as i 7.1.1, which is due before the end of 2010 and most likely with entry and high-end machines around the August-September timeframe (as this newsletter revealed in February), will more fully exploit the Power7 iron, the kicker i 7.1.2 and i 7.1.3 will do even more when they come out in early and late 2011, respectively.

I already walked you through the SAP business intelligence benchmark tests IBM has run on Power6, Power6+, and Power7 machines using the Business Intelligence-Mixed Load, or BI-MXL, test. This is the third generation of SAP BI tests IBM has used to gauge the performance of data warehousing on iSeries and Power Systems machines. Those tests were run to show how much more oomph a modestly configured Power 750 had over older Power 520, 550, and 570 servers.

The most recent test was done specifically to show the performance jump for BI work that could come just through upgrading from i 6.1.1 to i 7.1. To demonstrate, IBM took a single-socket Power 750 with eight-cores and 32 threads, one-quarter of the capacity of the machine, and tossed in 128 GB of memory. On the BI-MXL test, that Power 750 was able to process 241,526 query navigation steps per hour against a database of 300 million records running i 6.1.1, its integrated DB2, and SAP's NetWeaver 7.0 middleware. That machine ran at 99 percent CU utilization on the test. Last week, IBM said that it took the same exact machine and slapped on i 7.1 on it, and was able to process 278,462 query navigation steps per hour on the test. That's a 15.3 percent increase in performance at no extra cost--beyond the hassle of upgrading to a new operating system, of course.


RELATED STORIES

i For Business Gets to Lucky Number 7--Dot 1

i/OS Gets Short Sheeted with Power7 Thread Counts

Power 750 Servers Running i Get SAP Benchmarks

The Power7 Systems Sales Pitch

i/OS Gets Short Sheeted with Power7 Thread Counts

The Power7 Rollout Begins In The Middle

Java Performance Is OS Agnostic on Power6 Gear

Power Systems Performance: First Up, SAP BI Data Mart

i5/OS V6R1 and Its Java Enhancements

The System i Still Owns the SAP BI Data Mart Benchmark

Power6-Based System i Performance: Your Mileage Will Vary

Power6-Based System i Performance and Bang for the Buck

The i5 515 and 525 Versus the Unix Competition

The i5 Shows Linear Scalability on SAP Benchmark

The i5 Tests Well on SAP Data Warehousing Benchmarks



                     Post this story to del.icio.us
               Post this story to Digg
    Post this story to Slashdot


Sponsored By
POWERTECH

How does your IBM i security stack up to the rest of the industry?

PowerTech publishes a popular study of the configuration of IBM Power Systems servers each year,
The State of IBM i Security, now in its seventh year.

The report includes a review of six main audit categories: powerful user profiles, user and
password management, data access, network access, system auditing, and system values
.

Download your free copy of the updated 2010 study today!


Editor: Timothy Prickett Morgan
Contributing Editors: Dan Burger, Joe Hertvik, Brian Kelly, Shannon O'Donnell,
Mary Lou Roberts, Victor Rozek, Kevin Vandever, Hesh Wiener, Alex Woodie
Publisher and Advertising Director: Jenny Thomas
Advertising Sales Representative: Kim Reed
Contact the Editors: To contact anyone on the IT Jungle Team
Go to our contacts page and send us a message.

Sponsored Links

RevSoft:  Enterprise solutions for data transfers, messaging and scheduling
American Top Tools:  Can you reach total machine CPW without having to change or upgrade?
COMMON:  Join us at the annual 2010 conference, May 3 - 6, in Orlando, Florida

 

 

IT Jungle Store Top Book Picks

Easy Steps to Internet Programming for AS/400, iSeries, and System i: List Price, $49.95
The iSeries Express Web Implementer's Guide: List Price, $49.95
The System i RPG & RPG IV Tutorial and Lab Exercises: List Price, $59.95
The System i Pocket RPG & RPG IV Guide: List Price, $69.95
The iSeries Pocket Database Guide: List Price, $59.00
The iSeries Pocket SQL Guide: List Price, $59.00
The iSeries Pocket Query Guide: List Price, $49.00
The iSeries Pocket WebFacing Primer: List Price, $39.00
Migrating to WebSphere Express for iSeries: List Price, $49.00
Getting Started With WebSphere Development Studio Client for iSeries: List Price, $89.00
Getting Started with WebSphere Express for iSeries: List Price, $49.00
Can the AS/400 Survive IBM?: List Price, $49.00
Chip Wars: List Price, $29.95


 
Four Hundred Stuff
Profound Delivers First RPG Open Access 'Handler'

RPG Open Access Spurs Development for looksoftware

Safestone Unveils i/OS Compliance Software

End of AnyNet Support is Good News for 10ZiG's e-Twinax Controller

LTO Finds Its Mojo, Extends Roadmap Out to Gen 8

Four Hundred Guru
FAQs for MySQL and the DB2 Storage Engine

Yet Another Super-Easy Way to Copy a Spooled File from One Partition to Another

More on Whether IPLs Help System Performance

Four Hundred Monitor
Four Hundred Monitor's
Full iSeries Events Calendar

System i PTF Guide
April 17, 2010: Volume 12, Number 16

April 10, 2010: Volume 12, Number 15

April 3, 2010: Volume 12, Number 14

March 27, 2010: Volume 12, Number 13

March 20, 2010: Volume 12, Number 12

March 13, 2010: Volume 12, Number 11

TPM at The Register
Windows Server to ride upgrade wave

Citrix profits soar on hodgepodge of desktop virt

Mellanox rides networking upgrade wave

HP preps Tukwila servers for April 27

VMware sales up smartly in Q1

RHEL 6 gets its first beta

Adaptive Computing consolidates cloud control

IBM pares down Power7 blade server

Ubuntu Server primed for the bigtime

IBM profits out-climb sales in Q1

Ethernet borgs RDMA from InfiniBand

Arista goes modular with 10 Gig E switches

THIS ISSUE SPONSORED BY:

looksoftware
PowerTech
BCD
Botz & Associates, Inc.
WorksRight Software


Printer Friendly Version


TABLE OF CONTENTS
Stacking Up New Power7 Against Power6/6+ Blades

RPG Open Access Is No Panacea, Say BCD and LANSA

Power Systems Slammed by Power7 Transitions in Q1

As I See It: Depriving the Senses

UNICOM Loses in Court, Forces SoftLanding Customers to Upgrade

But Wait, There's More:

Looks Like Two Entry Power7 Systems Are On The Way . . . SAP Tests Prove i 7.1 Performance Boost Over i 6.1 . . . Advanced Job Scheduler Prices Go Up Dramatically . . . IBM Chops Power 570 to 770/780 Memory Upgrade Tags . . . Brian Kelly Takes a Run at Congress and for Congress . . .

The Four Hundred

BACK ISSUES




 
Subscription Information:
You can unsubscribe, change your email address, or sign up for any of IT Jungle's free e-newsletters through our Web site at http://www.itjungle.com/sub/subscribe.html.

Copyright © 1996-2010 Guild Companies, Inc. All Rights Reserved.
Guild Companies, Inc., 50 Park Terrace East, Suite 8F, New York, NY 10034

Privacy Statement