tfh
Volume 17, Number 27 -- July 14, 2008

IBM Tweaks Power System 595 Upgrades for System i 570 CBU Shops

Published: July 14, 2008

by Timothy Prickett Morgan

The Capacity BackUp variants of the iSeries and System i kickers to the AS/400, which were initially launched in September 2003 to cut the price of a hot standby server in a high availability cluster, were one of the bright spots in the product line as HA software became gradually more commonplace among OS/400 and i5/OS shops in the past five years. Cutting the price on redundant hardware helped boost HA adoption, which is great. This is all good.

But apparently there are some customers with i570 CBU machines who want to move to real Power 595s, not the Power 595 CBU Editions, and others that want an upgrade path from i570 CBU machines to the new Power Systems 595 CBU variants, too.

The reasons I suspect this is that last week, IBM announced six new conversions between the System i 570 CBU Editions based on Power5 and Power5+ processors to the Power6-based Power 595 with Capacity Upgrade on Demand (CUoD) processors. The move into the Power 595, which is known by its 9119-FHA product number, from the 570, which goes by 9406-570, is so complex that Big Blue has to do a two-step dance to get it done, but thankfully this upgrade goes by a single upgrade product number in its configurators. If customers want to convert from the Power 595 CUoD box (which allows processors to be activated temporarily or permanently, to be used in any fashion customers want) to a Power 595 CBU Edition, they can go all the way and do that. IBM did not explain why these paths were necessary, but I suspect it is as much for economic and accounting reasons as for technical ones. The point is, you start with an i570 CBU using 2.2 GHz Power5+ chips and you end up with a Power 595 CBU using either 4.2 GHz or 5 GHz Power6 chips.

To help smooth out the economics of the above-mention upgrade, IBM is also allowing DDR1 main memory cards used in the i570 CBU to be converted to DDR2 main memory cards for the Power 595, and is converting RIO-2 I/O drawers to 12X I/O drawers (those are the old Fibre Channel and new InfiniBand networking implementations, which IBM has to give funky names because it doesn't want to admit that its secret I/O sauce is just Fibre Channel and InfiniBand for some reason that I cannot fathom) and RIO-2 I/O loop adapters to GX Dual-Port 12X host adapters. A bunch of other I/O drawers can be converted as part of this upgrade path, too.

The system model conversion for this two-step CBU upgrade path will be available on September 9. Feature codes to retain the 7040-61D I/O drawers and expansions racks in the i570 CBU will be available on August 23, and so will the activation of DDR2 main memory on the Power 595 based on DDR1 features on the i570 CBU. Support for the conversion of the Fibre Channel features to InfiniBand features will be available on November 21.

Considering all of this grief, you have to assume it is worth the money to cope with the hassle of moving. Otherwise, you would assume that IBM would just require customers to do a push-pull upgrade. But companies are usually pretty keen on retaining the serial numbers of their systems so they can depreciate that asset more slowly. If you take the box out before its depreciation is done, you have to write the whole thing off--and you have a new and usually more expensive box on the capital budget that will not be written off for many years. Upgrades only make sense because of depreciation rules. If there was no depreciation--or instant depreciation, which is equally absurd--there would be no upgrades at all in IT. All I know for sure is that IBM would not have provided this upgrade path from the i570 to the Power 595 if someone wasn't complaining about the accounting somewhere.


RELATED STORIES

The Power 595 Takes the Top TPC-C Benchmark Ranking

Java Performance Is OS Agnostic on Power6 Gear

Power Systems: The Feeds and Speeds

The 64-Core Power6-Based Power 595 Starts to Roll in May

IBM Delivers Entry Capacity BackUp Machines, As Promised

Bang for the Buck: Big Iron Boxes, Even Bigger Bucks

IBM Rejiggers and Broadens i5 Capacity BackUp Edition

IBM's iSeries for HA, CBU Editions Gain Traction

More on IBM's iSeries Announcements



                     Post this story to del.icio.us
               Post this story to Digg
    Post this story to Slashdot


Sponsored By
WORKSRIGHT SOFTWARE

Do you need area code information?
Do you need ZIP Code information?
Do you need ZIP+4 information?
Do you need city name information?
Do you need county information?
Do you need a nearest dealer locator system?

We can HELP! We have affordable AS/400 software and data to do all of the above. Whether you need a simple city name retrieval system or a sophisticated CASS postal coding system, we have it for you!

The ZIP/CITY system is based on 5-digit ZIP Codes. You can retrieve city names, state names, county names, area codes, time zones, latitude, longitude, and more just by knowing the ZIP Code. We supply information on all the latest area code changes. A nearest dealer locator function is also included. ZIP/CITY includes software, data, monthly updates, and unlimited support. The cost is $495 per year.

PER/ZIP4 is a sophisticated CASS certified postal coding system for assigning ZIP Codes, ZIP+4, carrier route, and delivery point codes. PER/ZIP4 also provides county names and FIPS codes. PER/ZIP4 can be used interactively, in batch, and with callable programs. PER/ZIP4 includes software, data, monthly updates, and unlimited support. The cost is $3,900 for the first year, and $1,950 for renewal.

Just call us and we'll arrange for 30 days FREE use of either
ZIP/CITY or PER/ZIP4.

WorksRight Software, Inc.
Phone: 601-856-8337
Fax: 601-856-9432
E-mail: software@worksright.com
Web site: www.worksright.com


Editor: Timothy Prickett Morgan
Contributing Editors: Dan Burger, Joe Hertvik, Brian Kelly, Shannon O'Donnell,
Mary Lou Roberts, Victor Rozek, Kevin Vandever, Hesh Wiener, Alex Woodie
Publisher and Advertising Director: Jenny Thomas
Advertising Sales Representative: Kim Reed
Contact the Editors: To contact anyone on the IT Jungle Team
Go to our contacts page and send us a message.

Sponsored Links

Vision Solutions:  System i Management Tips Blog - Free i5/OS Tips Each Week!
Aldon:  Get ITIL compliant with Aldon's Application Lifecycle Management solutions
COMMON:  Join us at the Focus 2008 workshop conference, October 5 - 8, in San Francisco, California

 

 

IT Jungle Store Top Book Picks

Easy Steps to Internet Programming for AS/400, iSeries, and System i: List Price, $49.95
Getting Started with PHP for i5/OS: List Price, $59.95
The System i RPG & RPG IV Tutorial and Lab Exercises: List Price, $59.95
The System i Pocket RPG & RPG IV Guide: List Price, $69.95
The iSeries Pocket Database Guide: List Price, $59.00
The iSeries Pocket Developers' Guide: List Price, $59.00
The iSeries Pocket SQL Guide: List Price, $59.00
The iSeries Pocket Query Guide: List Price, $49.00
The iSeries Pocket WebFacing Primer: List Price, $39.00
Migrating to WebSphere Express for iSeries: List Price, $49.00
iSeries Express Web Implementer's Guide: List Price, $59.00
Getting Started with WebSphere Development Studio for iSeries: List Price, $79.95
Getting Started With WebSphere Development Studio Client for iSeries: List Price, $89.00
Getting Started with WebSphere Express for iSeries: List Price, $49.00
WebFacing Application Design and Development Guide: List Price, $55.00
Can the AS/400 Survive IBM?: List Price, $49.00
The All-Everything Machine: List Price, $29.95
Chip Wars: List Price, $29.95


 
The Linux Beacon
Xandros Continues Linux Buildout with Linspire Buy

Red Hat's Profit Growth Stalls in Fiscal Q1, RHEL MRG Launched

Gartner Revises HP's Server Sales Downward for Q1

As I See It: The Digital Leader

The Relational Database Market Grows Decently in 2007

Four Hundred Stuff
Vision Solutions Continues HA Evolution with ORION 6.0

CCSS Addresses MQSeries Monitoring Pain on i OS

NGS Launches Another BI Product for i OS

AMB Hooks Data Quality Tool into IBM DataStage

Varsity's i OS Shipping Software Certified by UPS

Big Iron
IBM v PSI: The Operation Was a Success, But the Patient Died

Top Mainframe Stories From Around the Web

Chats, Webinars, Seminars, Shows, and Other Happenings

Four Hundred Guru
PHP and the Zend Framework

A Handy SQL Timestamp Function

Reader Feedback: More on Preventing System Startup, Attention Lights, and Adding Drives

System i PTF Guide
July 5, 2008: Volume 10, Number 27

June 28, 2008: Volume 10, Number 26

June 21, 2008: Volume 10, Number 25

June 14, 2008: Volume 10, Number 24

June 7, 2008: Volume 10, Number 23

May 31, 2008: Volume 10, Number 22

The Windows Observer
Micro-Hoo Now Undead

Microsoft Patches Security Flaws in Windows, SQL Server, and Exchange

Hyper-V Goes RTM as VMware Hiccups

Microsoft Unveils New 'Select Plus' Volume Licensing Program

VMware Replaces Co-Founder Greene with Microsoft Hotshot

The Unix Guardian
HP-UX 11i v3 Update 2 Pricing Revealed--Sort Of

Gartner Revises HP's Server Sales Downward for Q1

Sun Upgrades and Extends Thumper Array Lineup

As I See It: The Digital Leader

The Relational Database Market Grows Decently in 2007

Four Hundred Monitor
Four Hundred Monitor's
Full iSeries Events Calendar

THIS ISSUE SPONSORED BY:

LANSA
MKS
COMMON
Bytware
WorksRight Software


Printer Friendly Version


TABLE OF CONTENTS
The i Upgrade Cycle Seems Par for the Course

The Power Systems JS12 and JS22 Blades Versus Other i Boxes

Gartner Revises HP's Server Sales Downward for Q1

Mad Dog 21/21: Mission Possible

IBM Tweaks Power System 595 Upgrades for System i 570 CBU Shops

But Wait, There's More:

Lawson's Q4 Profits Slammed by Investment Writeoffs, Sales Up Though . . . Micro Focus Acquires Liant for COBOL and PL/I Tools . . . IBM Adds New Power Systems to AS/400 and iSeries Removal Program . . . IBM Lowers and Then Raises Ultrium Media Prices . . . Agilysys Appoints New Board Member, Selects Special Committee to Weigh Options . . .

The Four Hundred

BACK ISSUES





 
Subscription Information:
You can unsubscribe, change your email address, or sign up for any of IT Jungle's free e-newsletters through our Web site at http://www.itjungle.com/sub/subscribe.html.

Copyright © 1996-2008 Guild Companies, Inc. All Rights Reserved.
Guild Companies, Inc., 50 Park Terrace East, Suite 8F, New York, NY 10034

Privacy Statement