tug
Volume 4, Number 25 -- July 12, 2007

AMD Sets 'Barcelona' Quad-Core Opteron Launch for August

Published: July 12, 2007

by Timothy Prickett Morgan

Well, the wait is almost over for Advanced Micro Devices and the partners and customers who have been waiting to get servers and workstations that use AMD's quad-core "Barcelona" Opteron processors.

After we went to press with the last issue of this newsletter, which took a hiatus for the July 4th holiday in America last week, AMD put out a statement saying that it would get the quad-core Barcelona processors out of its chip fabs in August and that it expected platform partners to begin shipping machines using the processors beginning in September. The company also said in its statement that the initial Barcelona chips would clock in at a maximum of 2 GHz in standard parts and that Special Edition (SE) parts with higher clock speeds and Highly Efficient (HE) parts running at lower voltages as a slightly lower clock speed would also come out. The word on the street is that the Barcelona Opteron HE parts will have a 1.9 GHz clock speed; no word yet on how far AMD can push the Barcelona SE parts.

The Barcelona chips are designed to operate in the same thermal envelopes as the current dual-core "Santa Rosa" Opteron Rev F processors, which means a thermal design point (TDP) of 68 watts for an HE part, 95 watts for the standard parts, and 120 watts for the SE parts. As has been the case since the Opterons and their related siblings (the Athlons for desktops and the Turions for laptops), these TDP ratings are based on maximum energy usage and heat dissipation stressing all of the transistors on the chip and include the on-chip memory controller, which can burn as much as 20 watts. Intel's Pentium and Xeon chips from days gone by as well as the new Core laptop and desktop chips and the related Xeon chips do not have integrated main memory controllers, so you have to be careful comparing TDPs.

That said, Intel is rumored to be readying a quad-core "Clovertown" Xeon 5300 for delivery in August, timed to cause AMD grief. This future Clovertown chip runs at a lower voltage than regular Clovertowns, delivers a 2 GHz clock speed, and has a 50-watt TDP. If you toss in a memory controller's heat, then this chip will more or less match the TDP of the forthcoming Barcelona HE chip--and will very likely deliver almost the same performance. The Clovertown chips are actually two dual-core "Woodcrest" Xeon 5100 series processors integrated into a single chip package; the Barcelona Opterons actually put four Opteron cores on a single chip die. Both are implemented in 65 nanometer chip technologies. AMD will be bragging that it has the first "native" quad-core X64 chip, but the quasi-quad nature of the Clovertowns has not stopped sales one tiny bit. It is a difference that may not make much of a difference for a lot of workloads.

AMD says that it will scale the frequencies of the Barcelona chips in the standard and SE flavors in the fourth quarter, which it will have to do to compete against Intel. The company was a bit vague about Barcelona's performance, saying that on certain database applications (which like multiple threads), customers could see a 70 percent performance increase compared to dual-core Rev F chips and up to 40 percent on floating point applications.


RELATED STORIES

AMD Gets Whacked by Intel in Workstation Market

AMD Shows Off Barcelona Boxes in Taiwan

AMD Dashes Hopes on Revenue Projections for Q1

AMD Pushes Opteron Clocks to 3 GHz, Boasts of Benchmarks

AMD: Native Quad Core Opteron Will Best Intel Quasi Quads

Chip Makers Strut Their Stuff at ISSCC



                     Post this story to del.icio.us
               Post this story to Digg
    Post this story to Slashdot


Sponsored By
VIBRANT TECHNOLOGIES

HP, IBM and Sun Server Deals via RSS

                                                  · Subscribe to our Specials via RSS
                                                  · Up to 80% off manufacturer's list price
                                                  · Multi-million dollar inventory

We Buy & Sell new and remarketed servers,
upgrades, peripherals and parts.

HP Proliant, IBM xSeries, IBM pSeries, RS6000,
HP Integrity, Sun Microsystems, Cisco, more…
888-443-8606

View or Subscribe to:
Special Offers on Servers and Upgrades


Editor: Timothy Prickett Morgan
Contributing Editors: Dan Burger, Joe Hertvik,
Shannon O'Donnell, Timothy Prickett Morgan
Publisher and Advertising Director: Jenny Thomas
Advertising Sales Representative: Kim Reed
Contact the Editors: To contact anyone on the IT Jungle Team
Go to our contacts page and send us a message.

Sponsored Links

Vibrant Technologies:  Quality Used Servers, Storage & Networking Hardware at up to 80% off new
World Data Products:  FREE 84-page Unix/Midrange Server Spec Book
COMMON:  Join us at the Annual 2008 conference, March 30 - April 3, in Nashville, Tennessee


The Four Hundred
Small Form Factor Disks Go Mainstream, the System i Has Gone Fishin'

Project Costs Tell the VoIP Story

IBM to Break Petaflops Barrier with Blue Gene/P

As I See It: The All-American Exhausting Vacation

The Linux Beacon
Red Hat Starts Fiscal 2008 with Modest Profit, Big Revenue Growth

Top 500 Supers: Moore's Law Is Alive and Well

IBM to Break Petaflops Barrier with Blue Gene/P

As I See It: The All-American Exhausting Vacation

Four Hundred Stuff
InfoManager Provides Another Option for System i OLAP

Robot/LPAR Streamlines Tape Backups of Partitioned i5/OS Servers

ROBObak Delivers Online Backups for Remote Offices

Lotus Quickr Now Available from IBM

Big Iron
The IBM Mainframe Base: Alive and Kicking

Top Mainframe Stories From Around the Web

Chats, Webinars, Seminars, Shows, and Other Happenings

Four Hundred Guru
Comment Your Binder Language

Load a Spreadsheet from a DB2/400 Database: Part 2

Admin Alert: More Info on SAVSYSINF, Green-Screen Printing, Performance PTFs, and Batteries

System i PTF Guide
July 7, 2007: Volume 9, Number 27

June 30, 2007: Volume 9, Number 26

June 23, 2007: Volume 9, Number 25

June 16, 2007: Volume 9, Number 24

June 9, 2007: Volume 9, Number 23

June 2, 2007: Volume 9, Number 22

The Windows Observer
Microsoft's Software Assurance Customers On the Fence, Forrester Says

Microsoft's GPL v3 Stance Puts Future of Novell Pact in Doubt

A Potpourri of Fixes Marks A Slow Patch Tuesday

Hype Machine Prepped for Windows Server 2008 Launch

Four Hundred Monitor
Four Hundred Monitor's
Full iSeries Events Calendar

THIS ISSUE SPONSORED BY:

Lakeview Technology
MKS
Canvas Systems
OpenSolaris
Vibrant Technologies



TABLE OF CONTENTS
IBM Says AIX 6 Beta Program Off to a Good Start

Oracle Says 11g Database Is Better, Cheaper, and Faster

IBM Charges 20 Percent Premium for Software Running on Power6 Cores

As I See It: The All-American Exhausting Vacation

But Wait, There's More:


AMD Sets 'Barcelona' Quad-Core Opteron Launch for August . . . The Final GNU GPL v3 License Is Released . . . InfiniBand Gear Maker Voltaire to Go Public . . . Small Form Factor Disks Go Mainstream . . . Shhhhh: Vendors Team to Share Gov't Secrets with SISA . . . Oracle-SAP Suit: TomorrowNow Acted Improperly, Admits SAP . . .

The Unix Guardian

BACK ISSUES





 
Subscription Information:
You can unsubscribe, change your email address, or sign up for any of IT Jungle's free e-newsletters through our Web site at http://www.itjungle.com/sub/subscribe.html.

Copyright © 1996-2008 Guild Companies, Inc. All Rights Reserved.
Guild Companies, Inc., 50 Park Terrace East, Suite 8F, New York, NY 10034

Privacy Statement