• The Four Hundred
  • Subscribe
  • Media Kit
  • Contributors
  • About Us
  • Contact
Menu
  • The Four Hundred
  • Subscribe
  • Media Kit
  • Contributors
  • About Us
  • Contact
  • Study Weighs Building Data Centers Against Colocation for SMBs

    January 22, 2007 Timothy Prickett Morgan

    It isn’t often that companies talk about the costs of setting up data centers, and small and medium companies generally do not talk very much about their data center costs. It might be simply because no one asks them. So what does a data center cost SMBs, and how does that compare to outsourcing the data center through the use of colocation services–putting your data center in someone else’s facility and paying rent?

    In an effort to try to win some customers for data center colocation services it provides, Baltimore Technology Park, which has an outsourcing services data center located in the Maryland town of that name, has just spent $3.5 million to do an 11,000 square foot expansion of its 30,000 square foot data center, put together a report last week and put some numbers on the build-versus-rent issue for data centers.

    To make a comparison for an SMB customer, BTP did the math for what it would cost to build a data center in the Washington metro area that had 1,120 square feet of space, which is enough to hold 20 racks of servers and storage; such a setup would require 43 watts of power per square foot, or about 48 kilowatts. (This means BTP was looking at standard rack servers, not ultradense blade server racks that can pack 15 to 20 kilowatts into a single rack these days without too much effort.) Building a data center of this size–including the cost of the electrical systems, air conditioning, fire suppression, and security systems–would cost $562,000, and adding in architect fees, engineering fees, project manager costs, and contingency planning would boost the price to $707,000. Recurring costs for electricity, telecom, maintenance, physical security, insurance, and property taxes would add another $270,000 each year. So over a five-year term, such a data center would cost over $2 million.

    Compare this to the cost of colocating in the BTP data center. For the same 20 racks of servers and storage, there is an initial $39,000 setup fee and annual rental, bandwidth, electricity, and cooling fees of around $206,000. Over a five-year period, that comes to just over $1 million.



                         Post this story to del.icio.us
                   Post this story to Digg
        Post this story to Slashdot

    Share this:

    • Reddit
    • Facebook
    • LinkedIn
    • Twitter
    • Email

    Tags: Tags: mtfh_rc, Volume 16, Number 3 -- January 22, 2007

    Sponsored by
    Computer Keyes

    Fax Directly from your IBM i

    KeyesFax is a full function automated IBM i fax system. Spooled files are burst by fax number and auto transmitted with overlays.  It combines both a send and receive facsimile processing system with a complete image package.

    The fax software will edit, send, receive, display, print, and track fax documents or images using any standard IBM i without additional expensive hardware, software or subscriptions.

    Computer Keyes has been developing Software Solutions since 1978!

    www.computerkeyes.com

    Share this:

    • Reddit
    • Facebook
    • LinkedIn
    • Twitter
    • Email

    Admin Alert: Ending Subsystems Properly IBM Lotus Adds Handles to Information Overload

    Leave a Reply Cancel reply

TFH Volume: 16 Issue: 3

This Issue Sponsored By

    Table of Contents

    • USPTO Elaborates on 2006’s Issued Patents and Backlog
    • Sun Patches Security Holes in Java Runtime Environment
    • Study Weighs Building Data Centers Against Colocation for SMBs
    • Security Experts Say Botnets, Web Extortion Threats on the Rise
    • New Congress, AT&T Revive the Net Neutrality Issue
    • USPTO Elaborates on 2006’s Issued Patents and Backlog
    • Ask TPM: The Economics of Open Source Software
    • Zend Describes Multiple Instances on i5/OS, Previews RPG Wrapper
    • IBM Closes Out 2006 With a Strong Fourth Quarter
    • Big Blue Readies Revamped Storage for the System i

    Content archive

    • The Four Hundred
    • Four Hundred Stuff
    • Four Hundred Guru

    Recent Posts

    • IBM Unveils Manzan, A New Open Source Event Monitor For IBM i
    • Say Goodbye To Downtime: Update Your Database Without Taking Your Business Offline
    • i-Rays Brings Observability To IBM i Performance Problems
    • Another Non-TR “Technology Refresh” Happens With IBM i TR6
    • IBM i PTF Guide, Volume 27, Number 18
    • Will The Turbulent Economy Downdraft IBM Systems Or Lift It?
    • How IBM Improved The Database With IBM i 7.6
    • Rocket Celebrates 35th Anniversary As Private Equity Owner Ponders Sale
    • 50 Acres And A Humanoid Robot With An AI Avatar
    • IBM i PTF Guide, Volume 27, Number 17

    Subscribe

    To get news from IT Jungle sent to your inbox every week, subscribe to our newsletter.

    Pages

    • About Us
    • Contact
    • Contributors
    • Four Hundred Monitor
    • IBM i PTF Guide
    • Media Kit
    • Subscribe

    Search

    Copyright © 2025 IT Jungle