• The Four Hundred
  • Subscribe
  • Media Kit
  • Contributors
  • About Us
  • Contact
Menu
  • The Four Hundred
  • Subscribe
  • Media Kit
  • Contributors
  • About Us
  • Contact
  • A Slew Of Power Systems Features Are Being Sunsetted

    July 17, 2023 Timothy Prickett Morgan

    Big Blue has long since stopped selling Power8 machinery and has been winding down sales of Power9-based systems as its Power10 machines, which made their debut in late 2021 and early 2022, are ascending. So, it is natural that features for Power8 and Power9 machinery are being withdrawn. But even some features with the newer Power10 machines are also being withdrawn, in some cases because supplies are running out and in other cases because better features have been introduced.

    You have to keep up with these things so you can get what you need before IBM stops selling whatever that …

    Read more

Content archive

  • The Four Hundred
  • Four Hundred Stuff
  • Four Hundred Guru

Recent Posts

  • ARCAD’s Deal with IBM for DevOps In Merlin Is Exclusive
  • In The IBM i Trenches With: Maxava
  • Is The Cloud On Your IBM i Horizon?
  • Four Hundred Monitor, September 20
  • IBM i PTF Guide, Volume 25, Number 38
  • The Subscription Pricing For The IBM i Stack So Far
  • Facing The Challenges Of Upgrading Old Systems With The Cloud
  • Guru: Generating XML Using SQL – The Easy Way
  • Rocket Buys Data Integration Provider B.O.S.
  • IBM i PTF Guide, Volume 25, Number 37

Subscribe

To get news from IT Jungle sent to your inbox every week, subscribe to our newsletter.

Pages

  • About Us
  • Contact
  • Contributors
  • Four Hundred Monitor
  • IBM i PTF Guide
  • Media Kit
  • Subscribe

Search

Copyright © 2023 IT Jungle