• The Four Hundred
  • Subscribe
  • Media Kit
  • Contributors
  • About Us
  • Contact
Menu
  • The Four Hundred
  • Subscribe
  • Media Kit
  • Contributors
  • About Us
  • Contact
  • Power Systems Down A Bit, But Holding Steady In Q2

    July 24, 2023 Timothy Prickett Morgan

    Considering that we are over a year into the Power10 entry and midrange server upgrade cycle, and almost two years into the Power10 high-end cycle, the fact that the Power Systems server business is only down a few points in the second quarter is, well, normal. As in the old normal where things have a natural ebb and flow and the business is not just in a kind of 45 degree decline like we saw a decade ago.

    This is what happens when Big Blue sticks to its enterprise computing knitting and is not distracted by the money-losing proposition of …

    Read more
  • A Slew Of Power Systems Features Are Being Sunsetted

    July 17, 2023 Timothy Prickett Morgan

    Big Blue has long since stopped selling Power8 machinery and has been winding down sales of Power9-based systems as its Power10 machines, which made their debut in late 2021 and early 2022, are ascending. So, it is natural that features for Power8 and Power9 machinery are being withdrawn. But even some features with the newer Power10 machines are also being withdrawn, in some cases because supplies are running out and in other cases because better features have been introduced.

    You have to keep up with these things so you can get what you need before IBM stops selling whatever that …

    Read more
  • IBM i Delivers Sizable Benefits, Forrester Consulting Reports

    June 7, 2023 Alex Woodie

    IBM i shops have firsthand knowledge of the positive characteristics of the platform relative to industry-standard X86 servers. We often hear anecdotes about the platform and share them with you through these pages. But IBM would like to get beyond mere anecdotes and get to some hard numbers on the IBM i advantage. That’s when it turns to Forrester Consulting.

    According to Forrester Consulting’s latest Total Economic Impact (TEI) report, a typical IBM i customer can expect to save about $2.6 million over three years as a result of the IBM i platform’s uptime, productivity, and efficiency. The report, …

    Read more
  • Power10 Boosts NVM-Express Flash Performance

    June 5, 2023 Timothy Prickett Morgan

    We are always on the lookout for any performance tests that show the benefits of adding flash storage to Power Systems iron, and we found some recently in an NVM-Express flash drive deep drive given by Douglas Gibb’s the I/O product manager for the Power Systems line at IBM during the POWERUp 2023 conference in Denver.

    The presentation that Gibbs gave went through all of the ins and outs of flash storage on Power Systems, including those that use the NVM-Express protocol over the PCI-Express peripheral bus, which offers a direct link between the operating system and the flash storage …

    Read more
  • Update On Critical Security Vulnerability In PowerVM

    May 24, 2023 Timothy Prickett Morgan

    Earlier this week, we told you about a very serious security vulnerability in the PowerVM hypervisor when running on Power9 and Power10 systems. IBM found the vulnerability itself and immediately set about to patch the vulnerability, which it revealed on May 17 along with patches to firmware in systems that are managed by the Hardware Management Console, or HMC.

    What was not necessarily apparent was that there are plenty of Power Systems customers who do not have HMCs managing their systems and the logical partitions upon them, and this is particularly true of the IBM i installed base, which …

    Read more
  • Critical Security Vulnerability In PowerVM Hypervisor

    May 22, 2023 Timothy Prickett Morgan

    IBM’s Product Security Incident Response Team (PSIRT) put out a notice on Wednesday, May 17, to inform the Power Systems installed base that there is a very serious security vulnerability in the PowerVM hypervisor. You can see the PSIRT notice at this link and the Security Bulletin: This Power System firmware update is being released to address CVE 2023-30438 at this link. This has a CVSS base score of 9.3, which means it is critical.

    We very rarely see any security vulnerabilities being reported for the PowerVM hypervisor or for the IBM i operating system itself, for that matter, …

    Read more
  • IBM i PTF Guide, Volume 25, Number 21

    May 22, 2023 Doug Bidwell

    As we report elsewhere in this week’s edition of The Four Hundred, there is a critical security vulnerability in the PowerVM hypervisor when it is running on Power9 and Power10 systems.

    This HIPER/Pervasive patch is described as fixing this: An internally discovered vulnerability in PowerVM on Power9 and Power10 systems could allow an attacker with privileged user access to a logical partition to perform an undetected violation of the isolation between logical partitions which could lead to data leakage or the execution of arbitrary code in other logical partitions on the same physical server.

    The Common Vulnerability and Exposure …

    Read more
  • Inside IBM’s Efforts To Modernize The ISV Army

    May 15, 2023 Alex Woodie

    “You go to war with the army you have, not the army you might want or wish to have at a later time.” IBM executives must feel a bit like the eminently quotable Don Rumsfeld, former Secretary of the Department of Defense, as they marshal their assets in the battle for application supremacy. While some of Big Blue’s partners have honed their IBM i applications into modern weapons, others are fielding old equipment more suitable for a previous war.

    It’s no state secret that Big Blue has a legacy problem on its hands in the IBM i world. When the …

    Read more
  • The Inevitable Power9 Hardware Withdrawals Begin

    May 15, 2023 Timothy Prickett Morgan

    The high end Power10 machine, the Power E1080, has been out since September 2021 and the rest of the Power10 line was announced in July 2022, so the writing was on the wall for any Power9-based machines the minute that happened.

    The ability for IBM to get, much less sell, Power9 chips even if it wanted to is also somewhat dubious, too. In October 2014, IBM sold off its Microelectronics division to Globalfoundries, itself a spinout of AMD’s foundry business five years earlier mashed up with Chartered Semiconductor and backed by the government of Abu Dhabi. Here’s the complication: …

    Read more
  • IBM Updates Performance Guide For Latest Power10 Iron

    May 1, 2023 Timothy Prickett Morgan

    No matter what system you are talking about, no matter what kind of applications you are running, there are always ways to squeeze more performance out of the system. The IBM i platform running atop Power10 and earlier processors is no exception, and to that end, for several years now Big Blue has provided some guidance on pushing performance with each new CPU family and as new features are added to the OS/400 and IBM i software stack.

    The latest such update, according to Steve Will, chief architect of the IBM i platform, has just been published, and you can …

    Read more

Previous Articles Next Articles

Content archive

  • The Four Hundred
  • Four Hundred Stuff
  • Four Hundred Guru

Recent Posts

  • IBM Pulls The Curtain Back A Smidge On Project Bob
  • IBM Just Killed Merlin. Here’s Why
  • Guru: Playing Sounds From An RPG Program
  • A Bit More Insight Into IBM’s “Spyre” AI Accelerator For Power
  • IBM i PTF Guide, Volume 27, Number 42
  • What You Will Find In IBM i 7.6 TR1 and IBM i 7.5 TR7
  • Three Things For IBM i Shops To Consider About DevSecOps
  • Big Blue Converges IBM i RPG And System Z COBOL Code Assistants Into “Project Bob”
  • As I See It: Retirement Challenges
  • IBM i PTF Guide, Volume 27, Number 41

Subscribe

To get news from IT Jungle sent to your inbox every week, subscribe to our newsletter.

Pages

  • About Us
  • Contact
  • Contributors
  • Four Hundred Monitor
  • IBM i PTF Guide
  • Media Kit
  • Subscribe

Search

Copyright © 2025 IT Jungle