• The Four Hundred
  • Subscribe
  • Media Kit
  • Contributors
  • About Us
  • Contact
Menu
  • The Four Hundred
  • Subscribe
  • Media Kit
  • Contributors
  • About Us
  • Contact
  • Some Power Systems Hardware Tweaks

    October 17, 2022 Timothy Prickett Morgan

    Whenever there is a software update on the Power Systems line, IBM usually has a few hardware announcements to toss into the mix. And last week was no exception, although there were not any new systems announced. Just tweaks to existing ones.

    In announcement letter 122-084, we see that IBM is reselling Nvidia’s two port, 100 Gb/sec ConnectX-6 DX network interface card on the Power10 lineup. This is a very popular NIC out there in Server Land, and in fact, it has been in short enough supply in the past year and change to actually have an impact on …

    Read more
  • How Good Are Your Backups? Wait, Don’t Answer Too Quickly

    April 18, 2022 Pete Massiello

    It’s probably a good day to review your backup strategy and your backup itself. If you haven’t done a backup in a while, set some time for either later today or this weekend to get a good backup. Remember, your recovery is only as good as your backup. If you have never tested your recovery, it’s probably a good time to look at that as well.

    Over two months ago, Russia invaded Ukraine, and then the United States and its allies put some crippling sanctions on Russia. For every action, there is usually a corresponding reaction. The news is abuzz …

    Read more
  • Supply Chain Problems Cause Power Systems SAS Controller Shortage

    December 8, 2021 Timothy Prickett Morgan

    The coronavirus pandemic has been doing strange things to the world’s supply chains for nearly two years now, and all things considered, the Power Systems platform has been largely spared from any serious issues. Until now.

    We have just caught wind of a notice that Tech Data has sent out to all of its Power Systems business partners that IBM has plenty of SAS disk drives and SAS flash drives, but that “demand currently exceeds supply availability” for SAS controllers and SAS backplanes. The shortage just hit hard in the past week or so, and now orders that have SAS …

    Read more
  • IBM Unveils New FlashSystem Storage Arrays

    February 17, 2021 Alex Woodie

    IBM last week took the wraps off three new FlashSystem storage devices, including the enterprise-oriented FlashSystem 5200 as well as two entry-level offerings, the FlashSystem 5015 and 5035. All three devices make use of speedy NVMe flash drives in the primary enclosure, but can be outfitted with traditional spinning and less-speedy solid state drives (SSDs) in the expansion enclosures.

    Since early 2020, IBM has been phasing out its Storwize disk array line and emphasizing the FlashSystem line that replaces it. As part of that exercise, IBM renamed existing arrays, including the Storwize V5100, which became the FlashSystem 5100. It also …

    Read more
  • Four Things That IBM i Shops Get Wrong About HA, DR, And Data

    July 22, 2020 Timothy Prickett Morgan

    It’s always a little hard to generalize, but IBM i shops tend to be conservative, thoughtful, and thorough when it comes to running IT. But no IT organization is perfect, and there are still issues when it comes to disaster recovery (DR) and high availability (HA).

    We think this is more often a reflection of the situation than it is of the people running IBM i systems. And to get a sense of the HA and DR missteps that people are making, we had a chat with Lilac Schoenbeck, Vice President of go-to-market strategy in the Power Systems division at …

    Read more
  • Melding System Monitoring And Capacity Planning

    April 24, 2019 Timothy Prickett Morgan

    Installing a modern system to run enterprise applications is a pretty tough task, but the job is not done once the iron is in and the databases and applications are up and running. Sophisticated organizations, whether they are large or small, do sophisticated application and system monitoring to keep an eye on how things are running, they have job schedulers that synchronize work to optimize for performance as well as drive up system utilization, and they use all of the information gathered to better plan for the kinds of systems they will need in the future.

    There are many …

    Read more

Content archive

  • The Four Hundred
  • Four Hundred Stuff
  • Four Hundred Guru

Recent Posts

  • POWERUp 2025 –Your Source For IBM i 7.6 Information
  • Maxava Consulting Services Does More Than HA/DR Project Management – A Lot More
  • Guru: Creating An SQL Stored Procedure That Returns A Result Set
  • As I See It: At Any Cost
  • IBM i PTF Guide, Volume 27, Number 19
  • IBM Unveils Manzan, A New Open Source Event Monitor For IBM i
  • Say Goodbye To Downtime: Update Your Database Without Taking Your Business Offline
  • i-Rays Brings Observability To IBM i Performance Problems
  • Another Non-TR “Technology Refresh” Happens With IBM i TR6
  • IBM i PTF Guide, Volume 27, Number 18

Subscribe

To get news from IT Jungle sent to your inbox every week, subscribe to our newsletter.

Pages

  • About Us
  • Contact
  • Contributors
  • Four Hundred Monitor
  • IBM i PTF Guide
  • Media Kit
  • Subscribe

Search

Copyright © 2025 IT Jungle