• The Four Hundred
  • Subscribe
  • Media Kit
  • Contributors
  • About Us
  • Contact
Menu
  • The Four Hundred
  • Subscribe
  • Media Kit
  • Contributors
  • About Us
  • Contact
  • IBM i PTF Guide, Volume 27, Numbers 3 And 4

    January 27, 2025 Doug Bidwell

    We are finally getting back into synch between The Four Hundred and the IBM i PTF Guide, and with this week’s issue numbers 3 and 4, you will be all caught up.

    In Number 3, dated January 18, we note that IBM has put out the latest service pack 950.D0 for system firmware levels VL950, VM950, and VH950, which you can read all about here. The updates are available for the following Power9 machines:

    • Power System S914 (9009-41G)
    • Power System E950 (9040-MR9)
    • Power System E980 (9080-M9S)
    • Power System H922 (9223-22H)
    • Power System H922 (9223-22S)
    • Power System H924 (9223-42H)
    …

    Read more

Content archive

  • The Four Hundred
  • Four Hundred Stuff
  • Four Hundred Guru

Recent Posts

  • What You Will Find In IBM i 7.6 TR1 and IBM i 7.5 TR7
  • Three Things For IBM i Shops To Consider About DevSecOps
  • Big Blue Converges IBM i RPG And System Z COBOL Code Assistants Into “Project Bob”
  • As I See It: Retirement Challenges
  • IBM i PTF Guide, Volume 27, Number 41
  • Stacking Up Power11 Entry Server Performance To Older Iron
  • Big Blue Boosts IBM i Support In Instana, Adds Tracing
  • It Is Time To Tell Us What You Are Thinking And Doing
  • IBM i PTF Guide, Volume 27, Number 40
  • The GenAI Boom Is Only Slightly Louder Than The Dot Com Boom

Subscribe

To get news from IT Jungle sent to your inbox every week, subscribe to our newsletter.

Pages

  • About Us
  • Contact
  • Contributors
  • Four Hundred Monitor
  • IBM i PTF Guide
  • Media Kit
  • Subscribe

Search

Copyright © 2025 IT Jungle