• The Four Hundred
  • Subscribe
  • Media Kit
  • Contributors
  • About Us
  • Contact
Menu
  • The Four Hundred
  • Subscribe
  • Media Kit
  • Contributors
  • About Us
  • Contact
  • Layoffs–Possibly Including Frank Soltis–at IBM Rochester

    November 17, 2008 Timothy Prickett Morgan

    According to a posting on the Midrange-L mailing list, where a lot of the AS/400 intelligentsia hang out to talk and gripe, IBM apparently had some layoffs at the Rochester, Minnesota, home of the AS/400 and its successors. And, if what long-time and staunch AS/400 enthusiast Neil Palmer said in the post is true, the chief architect of what used to be called the System i until last year is getting ready to leave the building.

    I have tried repeatedly this week to get some kind details on the layoffs that Palmer refers to in one post, but thus far IBM has neither confirmed or denied the layoffs. Palmer says that employees at the Rochester facility were given pink slips on November 10, and that they have 30 days to find another job within Big Blue or they will be shown the door. He did not know numbers, but given the state of the economy, I would not be surprised to see a fairly large number let go. Particularly if IBM is going to start moving more and more server manufacturing to China, as I have suspected it would for quite some time.

    More ominously, in a second posting at Midrange-L, Palmer says that one of the people who IBM will let go is none other than Frank Soltis, the architect of the System/38 and AS/400 and the man who was given the title of chief architect of its successor platforms but with not much more than a mandate to move to converged hardware, middleware, and now virtualization layers. IBM spokespeople were unable to confirm this as we went to press on Friday, but the departure of Soltis would not be much of a surprise. Money is power in this world, and in a decade the AS/400 has shrunk from a $4 billion or so systems business to maybe a little over $1 billion, not including tools and services. And while a lot of that $1 billion is still profit, and there are lots of services and other products that go into i shops, with the economy in the tank, IBM may very quickly have a lot of layoffs, not just in Rochester.

    When the AS/400 celebrated its 20th birthday in June, Soltis was trotted out in a Webcast to fire up the troops, but as he reminded everyone, it is 30 years since the launch of the System/38, and that is a long time to do anything–even if you like doing it. And let’s face it. Neither Soltis nor a slew of experts from Rochester have had much of a say in the architecture of the Power platform for the past several years, even if the resulting machinery is made in Rochester. And a lot of the bigwigs in the former AS/400, iSeries, and System i division now work for different parts of IBM (either Business Systems, Enterprise Systems, or Power Systems) and they are usually in cross-platform roles. There is not much of a place for an AS/400 advocate inside IBM. There is, however, lots of room outside of IBM for such a role. To what effect, it is hard to say. We all do our part in this AS/400 ecosystem. That’s all I know for sure.

    If there were layoffs on November 10, this is not the first ones IBM has had in Rochester this year. It would make it the fourth round of layoffs, if my reading of the Rochester Post-Bulletin is correct. Back on October 31, according to the paper, IBM let 10 full-time employees in Rochester and 35 contractors go, and an earlier report in the paper during the summer said that IBM had two earlier layoffs, which it called “micro-layoffs,” back in July and June. IBM never did say how many full-time jobs were cut, but did say the June one involved a “handful” and the July one involved “less than a handful” according to the Post-Bulletin.

    The Alliance IBM union-building effort at Big Blue based up in the Endicott, New York, factory where IBM was founded nine decades ago, hasn’t heard of any layoffs yet, but did note that IBM cut 100 temporary employees from its Burlington, Vermont, chip plant in early November.

    As 2008 started, IBM had approximately 4,400 full-time employees in the Rochester facility, more than 120,000 people across the United States, and well over 400,000 people globally.

    These rumors don’t always pan out, of course. In the late summer of 2007, I heard rumors that anywhere from 1,000 to 1,500 people had been let go in Rochester, something that IBM eventually and adamantly denied once it became clear that a lot of people were talking about it. The story I did last year went through the history of employment at IBM Rochester, as best as I could piece it together, so hit that link above if you want to see that. Suffice it to say that Rochester used to do a lot more and used to have a lot more employees, too. Then again, so did all of the server makers, most of whom contract out a lot of design, metal bending, and such these days.

    No matter who wins the senate race in Minnesota, be it the upstart Democrat, Al Franken, or the incumbent Republican, Norm Coleman, you can bet there is going to be tremendous political pressure on Big Blue to keep jobs in the land of a thousand lakes. But IBM is under pressures that are far larger, and more global, and perhaps more significantly, is less interested in being known as a great employer than in making its profit targets by 2010. Targets that I think are utterly stupid it if means losing talent and markets. But what do I know? I’ve just been watching the computer biz for a mere 19 years–a punk by System/38 standards.

    RELATED STORIES

    The AS/400’s Grandfather Talks Past, Present, and Future

    Happy 20th Birthday, AS/400!

    There’s No i in Future, But Is There a Future in i?

    Reader Feedback on There’s No i in Future, But Is There a Future in i?

    Rumored Layoffs at IBM Rochester Not True

    Dr. Frank Soltis at COMMON: A Show Worth Watching



                         Post this story to del.icio.us
                   Post this story to Digg
        Post this story to Slashdot

    Share this:

    • Reddit
    • Facebook
    • LinkedIn
    • Twitter
    • Email

    Tags: Tags: mtfh_rc, Volume 17, Number 44 -- November 17, 2008

    Sponsored by
    DRV Tech

    Get More Out of Your IBM i

    With soaring costs, operational data is more critical than ever. IBM shops need faster, easier ways to distribute IBM applications-based data to users more efficiently, no matter where they are.

    The Problem:

    For Users, IBM Data Can Be Difficult to Get To

    IBM Applications generate reports as spooled files, originally designed to be printed. Often those reports are packed together with so much data it makes them difficult to read. Add to that hardcopy is a pain to distribute. User-friendly formats like Excel and PDF are better, offering sorting, searching, and easy portability but getting IBM reports into these formats can be tricky without the right tools.

    The Solution:

    IBM i Reports can easily be converted to easy to read and share formats like Excel and PDF and Delivered by Email

    Converting IBM i, iSeries, and AS400 reports into Excel and PDF is now a lot easier with SpoolFlex software by DRV Tech.  If you or your users are still doing this manually, think how much time is wasted dragging and reformatting to make a report readable. How much time would be saved if they were automatically formatted correctly and delivered to one or multiple recipients.

    SpoolFlex converts spooled files to Excel and PDF, automatically emailing them, and saving copies to network shared folders. SpoolFlex converts complex reports to Excel, removing unwanted headers, splitting large reports out for individual recipients, and delivering to users whether they are at the office or working from home.

    Watch our 2-minute video and see DRV’s powerful SpoolFlex software can solve your file conversion challenges.

    Watch Video

    DRV Tech

    www.drvtech.com

    866.378.3366

    Share this:

    • Reddit
    • Facebook
    • LinkedIn
    • Twitter
    • Email

    Jinfonet Boosts Performance of Reporting Tool SkyView Goes GUI with i OS Security Tool

    Leave a Reply Cancel reply

TFH Volume: 17 Issue: 44

This Issue Sponsored By

    Table of Contents

    • Lotus Foundations and Smart Cube i: Brothers or Clones?
    • IBM Starts Cutting Deals on Power Systems i for Q4
    • Layoffs–Possibly Including Frank Soltis–at IBM Rochester
    • Mad Dog 21/21: Souls of Old Machines
    • Power Systems GM Discusses Upcoming i Announcements in Chat
    • IDC Patches Punctured IT Spending Forecasts
    • IBM Updates Active Power Management Plug-In for Servers
    • Aberdeen and IBM Team Up for Midmarket Security Assessments
    • Foreign Exchange, Biz Slowdown Hit BluePhoenix in Q3
    • Big Sam Speaks–And That Doesn’t Happen Every Day

    Content archive

    • The Four Hundred
    • Four Hundred Stuff
    • Four Hundred Guru

    Recent Posts

    • Meet The Next Gen Of IBMers Helping To Build IBM i
    • Looks Like IBM Is Building A Linux-Like PASE For IBM i After All
    • Will Independent IBM i Clouds Survive PowerVS?
    • Now, IBM Is Jacking Up Hardware Maintenance Prices
    • IBM i PTF Guide, Volume 27, Number 24
    • Big Blue Raises IBM i License Transfer Fees, Other Prices
    • Keep The IBM i Youth Movement Going With More Training, Better Tools
    • Remain Begins Migrating DevOps Tools To VS Code
    • IBM Readies LTO-10 Tape Drives And Libraries
    • IBM i PTF Guide, Volume 27, Number 23

    Subscribe

    To get news from IT Jungle sent to your inbox every week, subscribe to our newsletter.

    Pages

    • About Us
    • Contact
    • Contributors
    • Four Hundred Monitor
    • IBM i PTF Guide
    • Media Kit
    • Subscribe

    Search

    Copyright © 2025 IT Jungle