tfh
Volume 19, Number 16 -- April 26, 2010

Looks Like Two Entry Power7 Systems Are On The Way

Published: April 26, 2010

by Timothy Prickett Morgan

I had been hoping, like many of you, that IBM had kept some of its Power7 server powder dry for the COMMON user group meeting in Orlando, Florida, next week. Perhaps divulging its plans for an entry Power Systems machine to succeed the current Power 520--I have been calling it the Power 720--and to maybe get back into the fight against entry X64 iron machines with a truly entry server--what I am calling the Power 710.

Well, it doesn't look like this is going to happen. As far as I know, there are no additional Power Systems announcements coming at COMMON, and IBM has already let the cat out of the bag about the i For Business 7.1 operating system stack. If I had to guess, and you often do when talking about IBM, I think the bulk of the Power7 announcements were supposed to be timed with i 7.1, and they were all expected some time in May, during the show. But IBM shifted things earlier for competitive reasons, with Intel and Advanced Micro Devices making a slew of server chip announcements in March. IBM pulled in the relatively low volume Power 750, 770, and 780 machines to February, and the similarly relatively low volume PS700, PS701, and PS702 blades were moved to an April launch. But, alas, notice how they don't ship until June 4?

The question everyone has now is: What is Big Blue up to as it rounds out the Power Systems lineup? IBM's Redbook Residency programs, oddly enough, gives a clue. Check this page out. You will see that IBM is trying to be clever here.

That page lists three residencies where IBM is looking for volunteers to help write up technical overviews of three servers that it says are planned for 2010. These machines include residencies for the Power 595, the Power 520, and the Power 510.

Now, we all know that those machines have existed for years. The 595 and 520 machines came in iSeries and pSeries versions, then System i and System p versions, and then in merged Power System versions. And the AS/400 510 series dates from the mid-1990s when the first Power-based midrange boxes were created by Big Blue, and the 510 name was resurrected with the Power5 and Power5+ machines a decade later as entry 2U rack servers. If you believe that IBM wants people to hang out in Austin, Texas, for three weeks to write technical docs about machines that have already long-since shipped, then I got a bridge right down the street from me linking Brooklyn to Manhattan I want to sell to you. And the fact that IBM is asking that those wanting to participate in the residencies for these three machines need to speak "English, American, or Texan" is not only an accurate way to delineate accents, vocabulary, and idiom, but also another clue that you have to read between the lines as to what IBM is really looking for.

I think that those 595, 520, and 510 names are placeholders for the future Power Systems 795, 720, and 710 servers.

We already have a pretty good idea what the Power 795 will look like: 256 cores, 1,024 threads, and probably something on the order of 8 TB of main memory and maybe 800,000 CPWs of aggregate OS/400 OLTP computing power. The Power 720 should be something on the order of a half of a Power 750, which means a machine with two processor cards per machine, each equipped with one Power7 chip with maybe four and six cores per chip activated; such a machine might have a maximum main memory of 256 GB, and clock speeds on the Power7 cores as low as 2.5 GHz, delivering something around 4,400 CPWs per core. And I think a Power 710 would be half that: one processor socket and 128 GB of memory.

The Redbook Residencies may be loosely or tightly coupled to the actual launched schedule and to each other. What I can tell you is all three of the residencies end on the same day, August 6. IBM doesn't like to announce servers in July, and early June is usually the latest it will go in the second quarter. (The June 21, 1988, launch of the AS/400 was very unusual, being too close to the summer silly season.) I can also tell you that Mark Loughridge, IBM's chief financial officer, confirmed in going over the company's first quarter financial results (which you can see elsewhere in this issue of The Four Hundred) that the high-end Power7-based server, whatever it is called, was not coming until the second half of 2010. So that rules out a June or July announcement. So, if I had to guess, I would not jump to conclusions and guess August, since IBM doesn’t like to do an August announcement because all of Europe goes on holiday that month.

Based on these Redbook Residencies and what Loughridge said, I would guess the Power 710, 720, and 795 are coming all together in late August or September for deliveries maybe in September or October. Of course, all schedules are subject to change because of competitive pressures and with the availability of low-end Power7 chips.


RELATED STORIES

IBM's Power7 Blades Pack a CPW Punch

IBM Peddles Baby BladeCenter PS700 Express Blade Box

IBM Officially Announces i/OS 7.1

IBM Holds i 6.1 Prices Steady, Slashes Application Server Fees

i 7.1 Due April 14, with Open Access for RPG, Other Goodies

The Power7 Systems Sales Pitch

i/OS Gets Short Sheeted with Power7 Thread Counts

The System iWant, 2010 Edition: Clustered Boxes

IBM Fired Up About Power7-Based Smarter Systems

A Little Insight Into the Rest of the Power7 Lineup

Power7: Yields Are Good, Midrange Systems A Go

The Power7 Rollout Begins In The Middle

The System iWant, 2010 Edition: Blade and Cookie Sheet Boxes

The System iWant, 2010 Edition: Entry Boxes

The System iWant, 2010 Edition: Midrange Boxes

IBM Preps Power7 Launch For February

Looks Like i 7.1 Is Coming In April

The System iWant, 2010 Edition: Big Boxes

Power Systems i: The Word From On High

Power Systems i: The Windows Conundrum

Power Systems i: Serve's Up

Power Systems i: Thinking Inside the Box

Rolling Thunder Rollout for Power7 Processors Next Year

IBM Rolls Up an i 6.1.1 Dot Release

The Curtain Rises a Bit on the Next i OS, Due in 2010

Start Planning for Power7 Iron Now

IBM to Reveal Power7 Secrets at Hot Chips

Power 7: Lots of Cores, Lots of Threads



                     Post this story to del.icio.us
               Post this story to Digg
    Post this story to Slashdot


Sponsored By
LOOKSOFTWARE

MOBILIZE YOUR I APPLICATIONS!

Access your i applications anywhere, anytime.

View the on-demand webinar to learn how you can mobilize your i applications. Find out how the latest generation of mobile devices has improved the User Experience to justify their use for core application access.

View this on-demand webinar to learn how you can mobilize your i applications. It includes:

          · A live demonstration of the latest new front-end smartphones connecting to i OS applications
          · A pragmatic assessment of the strengths and weaknesses of the iPhone, BlackBerry & other
              popular smartphones
          · Considerations for deployment such as Wi-Fi, 3G and offline access
          · Is the iPhone ready to take on BlackBerry for enterprise scale, core application access?
          · Tips to help you get ready for tomorrow's multi-channel world

"By year-end 2008, more than 75% of knowledge workers will access enterprise portals
by more than two types of clients."

Gartner, June 2008

View the On-Demand Webinar & get a Free White Paper

www.looksoftware.com


Editor: Timothy Prickett Morgan
Contributing Editors: Dan Burger, Joe Hertvik, Brian Kelly, Shannon O'Donnell,
Mary Lou Roberts, Victor Rozek, Kevin Vandever, Hesh Wiener, Alex Woodie
Publisher and Advertising Director: Jenny Thomas
Advertising Sales Representative: Kim Reed
Contact the Editors: To contact anyone on the IT Jungle Team
Go to our contacts page and send us a message.

Sponsored Links

RevSoft:  Enterprise solutions for data transfers, messaging and scheduling
American Top Tools:  Can you reach total machine CPW without having to change or upgrade?
COMMON:  Join us at the annual 2010 conference, May 3 - 6, in Orlando, Florida

 

 

IT Jungle Store Top Book Picks

Easy Steps to Internet Programming for AS/400, iSeries, and System i: List Price, $49.95
The iSeries Express Web Implementer's Guide: List Price, $49.95
The System i RPG & RPG IV Tutorial and Lab Exercises: List Price, $59.95
The System i Pocket RPG & RPG IV Guide: List Price, $69.95
The iSeries Pocket Database Guide: List Price, $59.00
The iSeries Pocket SQL Guide: List Price, $59.00
The iSeries Pocket Query Guide: List Price, $49.00
The iSeries Pocket WebFacing Primer: List Price, $39.00
Migrating to WebSphere Express for iSeries: List Price, $49.00
Getting Started With WebSphere Development Studio Client for iSeries: List Price, $89.00
Getting Started with WebSphere Express for iSeries: List Price, $49.00
Can the AS/400 Survive IBM?: List Price, $49.00
Chip Wars: List Price, $29.95


 
Four Hundred Stuff
Profound Delivers First RPG Open Access 'Handler'

RPG Open Access Spurs Development for looksoftware

Safestone Unveils i/OS Compliance Software

End of AnyNet Support is Good News for 10ZiG's e-Twinax Controller

LTO Finds Its Mojo, Extends Roadmap Out to Gen 8

Four Hundred Guru
FAQs for MySQL and the DB2 Storage Engine

Yet Another Super-Easy Way to Copy a Spooled File from One Partition to Another

More on Whether IPLs Help System Performance

Four Hundred Monitor
Four Hundred Monitor's
Full iSeries Events Calendar

System i PTF Guide
April 17, 2010: Volume 12, Number 16

April 10, 2010: Volume 12, Number 15

April 3, 2010: Volume 12, Number 14

March 27, 2010: Volume 12, Number 13

March 20, 2010: Volume 12, Number 12

March 13, 2010: Volume 12, Number 11

TPM at The Register
Windows Server to ride upgrade wave

Citrix profits soar on hodgepodge of desktop virt

Mellanox rides networking upgrade wave

HP preps Tukwila servers for April 27

VMware sales up smartly in Q1

RHEL 6 gets its first beta

Adaptive Computing consolidates cloud control

IBM pares down Power7 blade server

Ubuntu Server primed for the bigtime

IBM profits out-climb sales in Q1

Ethernet borgs RDMA from InfiniBand

Arista goes modular with 10 Gig E switches

THIS ISSUE SPONSORED BY:

looksoftware
PowerTech
BCD
Botz & Associates, Inc.
WorksRight Software


Printer Friendly Version


TABLE OF CONTENTS
Stacking Up New Power7 Against Power6/6+ Blades

RPG Open Access Is No Panacea, Say BCD and LANSA

Power Systems Slammed by Power7 Transitions in Q1

As I See It: Depriving the Senses

UNICOM Loses in Court, Forces SoftLanding Customers to Upgrade

But Wait, There's More:

Looks Like Two Entry Power7 Systems Are On The Way . . . SAP Tests Prove i 7.1 Performance Boost Over i 6.1 . . . Advanced Job Scheduler Prices Go Up Dramatically . . . IBM Chops Power 570 to 770/780 Memory Upgrade Tags . . . Brian Kelly Takes a Run at Congress and for Congress . . .

The Four Hundred

BACK ISSUES




 
Subscription Information:
You can unsubscribe, change your email address, or sign up for any of IT Jungle's free e-newsletters through our Web site at http://www.itjungle.com/sub/subscribe.html.

Copyright © 1996-2010 Guild Companies, Inc. All Rights Reserved.
Guild Companies, Inc., 50 Park Terrace East, Suite 8F, New York, NY 10034

Privacy Statement