• The Four Hundred
  • Subscribe
  • Media Kit
  • Contributors
  • About Us
  • Contact
Menu
  • The Four Hundred
  • Subscribe
  • Media Kit
  • Contributors
  • About Us
  • Contact
  • Time For Tapeless? LaserVault Tempts The SMB

    August 29, 2016 Dan Burger

    IBM midrange shops with dedicated system operators that manage backup media and drives are few and far between these days. The common staffing arrangement has programmers or maybe network admins juggling backup duties along with their other responsibilities. Of course, lean staffing invites human error into IT operations. Automating backup procedures can provide welcome relief. Data at risk is a problem that Electronic Storage Corporation is addressing with a new appliance it calls Backup SAVSmart for i.

    Electronic Storage Corporation is the maker of LaserVault backup and recovery solutions.

    SAVSmart uses the newest version of the LaserVault Backup software, which is pre-installed on the appliance and connects to the IBM i platform using an Ethernet connection. Users can access the SAVSmart control panel with a Windows tablet (provided with the appliance) or with their existing laptops.

    LaserVault Backup software uses IBM i commands similar to tape backup commands.

    The SAVSmart package includes a software module called SAVSYSLV, which enables full system saves without tape. The solution comes with a DVD writer and two external drives–each with 2 TB capacity–for data backup and a second copy that can be taken offsite. The system is shipped complete and configured remotely with the assistance of LaserVault’s engineers.

    In terms of performance, SAVSmart can store up to 8 TB of compressed backups and runs up to 277 GB/hour.

    As is the case with other LaserVault Backup software, SAVSmart uses commands that are similar to IBM i tape backup commands, which makes it easier to use for personnel familiar with the IBM i commands.

    Brad Jensen, CEO of ESC/LaserVault, says the new product was specifically designed for IBM i shops with daily backups between 10 GB and 400 GB. The company’s Universal Backup Device (UBD) for IBM i was designed for shops with backup loads exceeding 400 GB.

    In the world of IBM i storage, tape remains the key ingredient in most companies’ storage strategies. Even when you look beyond the IBM i community, you find around 75 percent of all data is stored on tape.

    Keeping things inexpensive and simple is a popular strategy, but are companies contented or complacent?

    Jensen refers to the decision to go tapeless as a “no brainer” because SAVSmart automates the backup process without interrupting day-to-day business. “When [IBM i shops] receive the appliance, it is ready to go. They plug SAVSmart into their IBM i and we work with them via remote access to do the initial software setup. That same day they can be backing up their data to SAVSmart. No longer do they need to deal with the hassle of using tape,” he says in a statement announcing the product.

    A quick return on investment is predicated on the savings in overtime wages paid to employees that otherwise would be putting in extra hours to perform manual backups.

    LaserVault SAVSmart will be available September 1. Pricing starts at $2,875.

    RELATED STORIES

    LaserVault Debuts New Backup Option for IBM i

    Tectrade to Sell LaserVault UBD in Europe

    LaserVault Launches Hybrid Cloud Backup Appliance for IBM i

    Share this:

    • Reddit
    • Facebook
    • LinkedIn
    • Twitter
    • Email

    Tags:

    Sponsored by
    ARCAD Software

    Embrace VS Code for IBM i Development

    The IBM i development landscape is evolving with modern tools that enhance efficiency and collaboration. Ready to make the move to VS Code for IBM i?

    Join us for this webinar where we’ll showcase how VS Code can serve as a powerful editor for native IBM i code and explore the essential extensions that make it possible.

    In this session, you’ll discover:

    • How ARCAD’s integration with VS Code provides deep metadata insights, allowing developers to assess the impact of their changes upfront.
    • The role of Git in enabling seamless collaboration between developers using tools like SEU, RDi, and VS Code.
    • Powerful extensions for code quality, security, impact analysis, smart build, and automated RPG conversion to Free Form.
    • How non-IBM i developers can now contribute to IBM i projects without prior knowledge of its specifics, while ensuring full control over their changes.

    The future of IBM i development is here. Let ARCAD be your guide!

    Register now!

    Share this:

    • Reddit
    • Facebook
    • LinkedIn
    • Twitter
    • Email

    Sponsored Links

    System i Developer:  RPG & DB2 Summit - October 4-6 2016 in Chicago. Register now!
    Four Hundred Monitor Calendar:  Latest info on national conferences, local events, & Webinars.
    Fresche:  WEBINAR - Strategies to address IBM i skills and staff shortages - August 30

    Knocking On The Old Database Door Easy Printing from CL, Take Two

    Leave a Reply Cancel reply

Volume 26, Number 37 -- August 29, 2016
THIS ISSUE SPONSORED BY:

New Generation Software
Fresche Legacy
HiT Software
Baseline Data Services
Manta Technologies

Table of Contents

  • Power9 Gets Ready To Roll In Systems In 2017
  • We’re All IBM i Storytellers
  • Tape: It Ain’t Dead Yet
  • Time For Tapeless? LaserVault Tempts The SMB
  • Clouds Grow, But Can IBM i Follow?

Content archive

  • The Four Hundred
  • Four Hundred Stuff
  • Four Hundred Guru

Recent Posts

  • IBM Unveils Manzan, A New Open Source Event Monitor For IBM i
  • Say Goodbye To Downtime: Update Your Database Without Taking Your Business Offline
  • i-Rays Brings Observability To IBM i Performance Problems
  • Another Non-TR “Technology Refresh” Happens With IBM i TR6
  • IBM i PTF Guide, Volume 27, Number 18
  • Will The Turbulent Economy Downdraft IBM Systems Or Lift It?
  • How IBM Improved The Database With IBM i 7.6
  • Rocket Celebrates 35th Anniversary As Private Equity Owner Ponders Sale
  • 50 Acres And A Humanoid Robot With An AI Avatar
  • IBM i PTF Guide, Volume 27, Number 17

Subscribe

To get news from IT Jungle sent to your inbox every week, subscribe to our newsletter.

Pages

  • About Us
  • Contact
  • Contributors
  • Four Hundred Monitor
  • IBM i PTF Guide
  • Media Kit
  • Subscribe

Search

Copyright © 2025 IT Jungle