• The Four Hundred
  • Subscribe
  • Media Kit
  • Contributors
  • About Us
  • Contact
Menu
  • The Four Hundred
  • Subscribe
  • Media Kit
  • Contributors
  • About Us
  • Contact
  • Entry IBM i Server Deals Greased With License Discounts

    September 7, 2010 Timothy Prickett Morgan

    As this newsletter reported a month ago, IBM has been cutting deals with customers moving from older Power 550 and larger machines based on Power 5, Power5+, and Power6 processors to Power 550/750 machines based on Power6+ and Power7 processors. The deal allows IBM i software licenses bought above and beyond the base OS that is configured with the server to slide from the old to the new box for a modest fee. Now, Big Blue is cutting smaller IBM i shops a break, too.

    The deal, called the IBM i License By User offering, is detailed in announcement letter 310-241, which the company slipped out in the wake of the August 17 Power Systems announcements. (That was when the four entry servers, the Power 710, 720, 730, and 740 servers as well as the new big bad box, the Power 795, were launched.) Under that deal, IBM is giving customers that have user-based pricing for the IBM i operating system–meaning Power 520-class systems, Power-based blade servers (old and new), and the new Power 710 and 720 machines–a 40 percent discount off the price of software licenses.

    The 40 percent discount can be taken by customers who are buying whole new boxes or upgrading to newer machines from older boxes. Presumably the discount also applies to incremental licenses added to new or upgraded iron. The discounts apply to both per-user fees sold in five- or 10-user blocks for specific machines, or the unlimited user licenses that IBM offers for these machines. (Effectively converting per-user licenses to tiered licenses as are sold on larger Power Systems.) The only upgrade supported under this deal is the move from the Power6+ Power 520 (product number 9203-E4A) to the Power 720 (product number 8202-E4B).

    On the Power 520 Express server, for instance, it costs $250 per user to fire up i 6.1, i 6.1.1, and i 7.1 licenses on the single-core Power6 machine. Buying unlimited users on this box costs $18,750, which works out to 75 users. If you are adding 75 users to a machine, it makes sense to just buy the unlimited license. With the 40 percent discount announced on August 18, that cross-over point is now 45 users–$11,250, which is $18,750 times 0.6, divided by $250 per user in the pre-deal pricing. On two-core Power Systems rack and tower machines, an unlimited IBM i license on user-based machines is $50,000, and on four-core machines it is $75,000. On the JS12 and PS700 Power blade servers, unlimited IBM i licenses cost $18,750. On the other Power blades–the single-socket PS701 and the two-socket JS22, JS23/JS43, and PS702–an unlimited license for the machine costs $50,000.

    None of the charges mentioned above include the IBM i per core activation fees, which are $2,245 on the entry Power 520 (single-core), Power 710, Power 720, JS12, and PS700 machines. On all of the other machines in the entry Power Systems lineup, the per-core activation fee for the three relevant IBM i releases is $14,995 per core. On Express configurations, IBM cuts the price in half on the base processor hardware activations and tosses in a set number of core activations for IBM i. (It varies depending on the machine.)

    The point is, you need to do your capacity planning for IBM i carefully. For a lot of customers, particularly those on P20-class machines, it may be so much cheaper to get down to a P05 or P10 machine using Power7 processors. The extra hardware cost (at street, not list, price) could be more than covered by the reduction in IBM i license costs even before the 40 percent discount on user activation fees for the operating system and integrated database.

    RELATED STORIES

    IBM Ducks i Pricing on Most Entry Power7 Servers

    IBM Allows i and 5250 Licenses to Jump Hardware

    Reader Feedback on Allowing IBM i and 5250 Licenses to Jump Hardware

    IBM Slashes 5250 Enablement Prices, Other Power Systems Tweaks

    IBM Officially Announces i/OS 7.1

    IBM Holds i 6.1 Prices Steady, Slashes Application Server Fees

    i/OS Gets Short Sheeted with Power7 Thread Counts



                         Post this story to del.icio.us
                   Post this story to Digg
        Post this story to Slashdot

    Share this:

    • Reddit
    • Facebook
    • LinkedIn
    • Twitter
    • Email

    Tags: Tags: mtfh_rc, Volume 19, Number 31 -- September 7, 2010

    Sponsored by
    ARCAD Software

    DevSecOps & Peer Review – The Power of Automation

    In today’s fast-paced development environments, security can no longer be an afterthought. This session will explore how DevSecOps brings security into every phase of the DevOps lifecycle—early, consistently, and effectively.

    In this session, you’ll discover:

    • What DevSecOps is and why it matters?
    • Learn how to formalize your security concerns into a repeatable process
    • Discover the power of automation through pull requests, approval workflows, segregation of duties, peer review, and more—ensuring your data and production environments are protected without slowing down delivery.

    Whether you’re just getting started or looking to enhance your practices, this session will provide actionable insights to strengthen your security posture through automation and team alignment to bring consistency to the process.

    Watch Now!

    Share this:

    • Reddit
    • Facebook
    • LinkedIn
    • Twitter
    • Email

    Admin Alert: One Year Out–Preparing for Your Next Power IBM i Upgrade Get Thee to the Web, Part 1

    Leave a Reply Cancel reply

TFH Volume: 19 Issue: 31

This Issue Sponsored By

    Table of Contents

    • Entry IBM i Server Deals Greased With License Discounts
    • Prices Jacked on Power Systems Tape Drives and Expansion Drawers
    • The Server Racket Strengthens in Q2, But Will It Hold?
    • Mad Dog 21/21: Craft Nouveau
    • IDC Raises Global IT Spending Projections for 2010
    • IBM Pushes Power Envelope Down with Power7 Chips
    • Drunk and Disgruntled Employee Unloads Hot Lead into Server
    • Agilysys Narrows Losses on Uptick in Sales in Fiscal Q1
    • Jack Henry Ends Fiscal 2010 on High Notes
    • Magic Builds Out Partner Network in Europe

    Content archive

    • The Four Hundred
    • Four Hundred Stuff
    • Four Hundred Guru

    Recent Posts

    • Power Systems Grows Nicely In Q3, Looks To Grow For All 2025, Too
    • Beta Of MCP Server Opens Up IBM i For Agentic AI
    • Sundry IBM i And Power Stack Announcements For Your Consideration
    • Please Take The IBM i Marketplace Survey
    • IBM i PTF Guide, Volume 27, Number 43
    • IBM Pulls The Curtain Back A Smidge On Project Bob
    • IBM Just Killed Merlin. Here’s Why
    • Guru: Playing Sounds From An RPG Program
    • A Bit More Insight Into IBM’s “Spyre” AI Accelerator For Power
    • IBM i PTF Guide, Volume 27, Number 42

    Subscribe

    To get news from IT Jungle sent to your inbox every week, subscribe to our newsletter.

    Pages

    • About Us
    • Contact
    • Contributors
    • Four Hundred Monitor
    • IBM i PTF Guide
    • Media Kit
    • Subscribe

    Search

    Copyright © 2025 IT Jungle