tfh
Volume 17, Number 35 -- September 15, 2008

Look for an Interim i Release Next Year, and i 6.2 in Early 2010

Published: September 15, 2008

by Timothy Prickett Morgan

As some of you know, IBM hosted two Power Systems Technical Universities in Chicago last week--one for i nerds and the other for AIX and Linux techies. As we went to press with this issue of the newsletter, some news was beginning to filter back into the cosmic ether--OK, really my email and my telephone, nothing cosmic about it--about what IBM is telling the i crowd. There's nothing earth shattering so far, but some interesting points.

First, the Virtual I/O Server that, as the name suggests, virtualizes disk, tape, and networking I/O for JS12 and JS22 blade servers running the i 6.1 operating system apparently has some performance issues. The exact nature of the issues are not clear to me, but I have been warning you since IBM put out a spec sheet earlier this year that the I/O bandwidth on these blades might be lower than you expect--and a lot lower than equivalently powered rack and tower versions of the Power6 lineup. And this might have a lot to do with the way VIOS is doing its virtualization of I/O and how i 6.1 is interacting with this layer. The OS/400 and follow-on operating systems already had its own way of virtualizing I/O, so adding another virtualization layer underneath that could be the culprit. I dunno. The thing is, the Power blades require VIOS to run i 6.1. You can't get around it.

And do, be warned, once again, to benchmark your workloads on the JS12 and JS22 blades before you spend big money, or at least get the real skinny from IBM on the performance of these blades running real workloads. The price and price/performance of the JS12 and JS22 blade servers in the BladeCenter S chassis are very good, even compared to Windows boxes--but that is only if the Power blades are not somehow more I/O constrained than I already think they are.

This leads me to my second point. There is some mumbling from Big Blue at the Power Systems Technical University for i nerds that there could be an interim release of the i operating system, tentatively called i 6.1.5, to correct these VIOS issues as well as any other matters that need to be cleared up. The suspicion among the people I have talked to is that i 6.1.5 might see the light of day in the second quarter of 2009, perhaps in May, if it does indeed happen instead of a massive dose of PTF updates to the existing i 6.1 operating system. I will be poking around to see if there are other issues lurking in i 6.1 that might be fixed in this interim release and other features that IBM might want to weave in ahead of the expected i 6.2 release.

And that leads onward like a straight road in the farm country of Minnesota to the expected launch date of i 6.2, which I am now hearing could be in the January 2010 time frame.

The last time I saw some I platform roadmaps, which were created earlier this year and which I told you about in May (see The i Platform Roadmap Is a Work in Progress), it looked like IBM would be putting an i 6.2 release into the field in mid-to-late 2009, followed by Power7-based systems coming in early 2010 and, presumably, i 7.1 along with it.

As I explained at the time, IBM's i platform roadmap was not drawn to scale, so determining exact timing for i 6.X and i 7.X releases was not possible. But the roadmap I saw in the wake of the Power Systems convergence showed the i5/OS V6R1 preview in early 2007 and the i 6.1 launch in late 2007, which obviously did not happen, since the V6R1 preview (previously known as i5/OS V5R5) did not start until the end of July 2007 and i 6.1 was announced at the end of January 2008 for shipments in March on all but the Power 595 systems, which gets it this month. Clearly there has been some push outward for the i 6.2 release, and hence the need for an interim release--particularly if there are issues with VIOS.

As I explained in January ahead of the Power Systems convergence, i 6.2 will run on the Power6-based JS12 and JS22 blade servers and the Power 520, 550, 570, and 595 servers as well as on the Power5+ based and user-priced i5 515 and 525 servers and the Power5 and Power5+ machines with the 520, 550, 570, and 595 model numbers. The i 6.2 operating system will not run on the second-generation iSeries 800, 810, 825, 870, and 890 servers, which were built using Power4 or earlier PowerPC chips, or the first-generation iSeries 270, 820, 830, or 840 machines, which used even older Star-class PowerPC processors. It seems likely that i 6.2 will also run on Power6+ servers, and very likely the first generation of Power7 machinery.

One last thing: It is entirely unclear how the Blue for Business platform, which IBM considers the next successor to the AS/400 line of midrange computers, will fit into the i roadmap. IBM is expected to start piloting this line of machines, which is a mix of i and Linux with SaaS-style applications and remote support as well as locally run applications on the Power-based machines, at the end of the year for delivery in early 2009. Heaven only knows if these boxes will ship with i 6.1 or i 6.1.5.


RELATED STORIES

The i Platform Roadmap Is a Work in Progress

There's No i in Future, But Is There a Future in i?

IBM Previews "Blue Business" SMB System Sales Approach

It's Official: Now We're Power Systems and i for Business

Progress Is Our Most Important Product

Some Info on i5/OS V6R1 and V6R2 Support

IBM Aims for Server Expansion in 2008, Including System i Reincarnation

A New Year, A New IBM Systems and Technology Group



                     Post this story to del.icio.us
               Post this story to Digg
    Post this story to Slashdot


Sponsored By
BCD

Planning on making the all-important move to
the web with your RPG applications?

Attend this Bob Cozzi webinar on Flexible
Modernization Options for 5250 Apps

                                              Bob Cozzi explains:
                                                  · The choices for modernizing RPG apps
                                                  · How to secure System i Web-based apps

                                              Duncan Kenzie presents:
                                                  · Presto for instant web enablement of 5250
                                                    applications with no code changes  and
                                                  · Nexus Portal, the framework for controlled &
                                                    Secured access to all enterprise web apps

REGISTER for this Sept. 24 WEBINAR !


Editor: Timothy Prickett Morgan
Contributing Editors: Dan Burger, Joe Hertvik, Brian Kelly, Shannon O'Donnell,
Mary Lou Roberts, Victor Rozek, Kevin Vandever, Hesh Wiener, Alex Woodie
Publisher and Advertising Director: Jenny Thomas
Advertising Sales Representative: Kim Reed
Contact the Editors: To contact anyone on the IT Jungle Team
Go to our contacts page and send us a message.

Sponsored Links

Aldon:  Modernize Don't Replace IBM i Applications. Download the white paper.
COMMON:  Join us at the Focus 2008 workshop conference, October 5 - 8, in San Francisco, California
Vision Solutions:  A $20 gas card for completing a short i5/OS DR survey

 

 

IT Jungle Store Top Book Picks

Easy Steps to Internet Programming for AS/400, iSeries, and System i: List Price, $49.95
Getting Started with PHP for i5/OS: List Price, $59.95
The System i RPG & RPG IV Tutorial and Lab Exercises: List Price, $59.95
The System i Pocket RPG & RPG IV Guide: List Price, $69.95
The iSeries Pocket Database Guide: List Price, $59.00
The iSeries Pocket Developers' Guide: List Price, $59.00
The iSeries Pocket SQL Guide: List Price, $59.00
The iSeries Pocket Query Guide: List Price, $49.00
The iSeries Pocket WebFacing Primer: List Price, $39.00
Migrating to WebSphere Express for iSeries: List Price, $49.00
iSeries Express Web Implementer's Guide: List Price, $59.00
Getting Started with WebSphere Development Studio for iSeries: List Price, $79.95
Getting Started With WebSphere Development Studio Client for iSeries: List Price, $89.00
Getting Started with WebSphere Express for iSeries: List Price, $49.00
WebFacing Application Design and Development Guide: List Price, $55.00
Can the AS/400 Survive IBM?: List Price, $49.00
The All-Everything Machine: List Price, $29.95
Chip Wars: List Price, $29.95


 
The Linux Beacon
Why Blade Servers Still Don't Cut It, and How They Might

Intel Keeps Both Arms Swinging with Xeons, Jabs with Itanium

Microsoft Ponies Up Another $100 Million for Novell Linux

Mad Dog 21/21: Newtonian Economics

Two More Xeon-Based Galaxy Servers from Sun

Four Hundred Stuff
SafeData Launches First Fully Managed Service for i5/OS HA

Aldon Brings PHP Closer Into Change Management Fold

HiT's DBMoto Gains Enterprise Replication Features

AmeriVault Debuts DR Service for i OS Servers

BMC Aims to Bring Virtual Servers Under Control

Big Iron
For Some Customers, the Mainframe Is Green

Top Mainframe Stories From Around the Web

Chats, Webinars, Seminars, Shows, and Other Happenings

Four Hundred Guru
The Efficiency of Varying Length Character Variables

SQL Assist: Powerful Interactive SQL

Admin Alert: Getting into a i5/OS Restricted State

System i PTF Guide
August 23, 2008: Volume 10, Number 34

August 16, 2008: Volume 10, Number 33

August 9, 2008: Volume 10, Number 32

August 2, 2008: Volume 10, Number 31

July 26, 2008: Volume 10, Number 30

July 19, 2008: Volume 10, Number 29

The Windows Observer
Citrix Addresses Performance with XenApp 5

Server Buyers Shop Like It's 1999 in the Second Quarter

Intel Keeps Both Arms Swinging with Xeons, Jabs with Itanium

Mad Dog 21/21: Newtonian Economics

Microsoft Does Something About Those SQL Injection Attacks

The Unix Guardian
What the Heck Is the Midrange, Anyway?

Overseas and Notebook Sales Offset Printer Declines for HP in Q3

Two More Xeon-Based Galaxy Servers from Sun

Mad Dog 21/21: Newtonian Economics

Intel's Nehalems to Star at IDF, AMD Pitches Shanghai

Four Hundred Monitor
Four Hundred Monitor's
Full iSeries Events Calendar

THIS ISSUE SPONSORED BY:

BCD
Seagull Software
Maximum Availability
Essex Technology Group
Bug Busters Software Engineering


Printer Friendly Version


TABLE OF CONTENTS
Look for an Interim i Release Next Year, and i 6.2 in Early 2010

Power 550 i Edition Versus Windows: Get Big Discounts on i Software

Forrester Says IT Spending Is Choppy Across Industries and Geographies

As I See It: Get Ready to ROWE

IBM Rolls Out WebSphere and Web Enablement for i V7.0

But Wait, There's More:

Survive, Adapt, Repeat: IT Jungle Shutting Down Non-AS/400 Newsletters . . . Arrow and IBM to Chase Deals Together in Poland . . . Disk Array and Storage Software Sales Up Smartly in the Second Quarter . . . Volvo IT Partners to Operate ERP Apps for IBS Customers . . . The BladeCenter S Gets a New SAS RAID Disk Module . . .

The Four Hundred

BACK ISSUES





 
Subscription Information:
You can unsubscribe, change your email address, or sign up for any of IT Jungle's free e-newsletters through our Web site at http://www.itjungle.com/sub/subscribe.html.

Copyright © 1996-2008 Guild Companies, Inc. All Rights Reserved.
Guild Companies, Inc., 50 Park Terrace East, Suite 8F, New York, NY 10034

Privacy Statement