• The Four Hundred
  • Subscribe
  • Media Kit
  • Contributors
  • About Us
  • Contact
Menu
  • The Four Hundred
  • Subscribe
  • Media Kit
  • Contributors
  • About Us
  • Contact
  • IBM Cuts Power 595 CPU Prices, Offers Remote Server Migration

    March 1, 2010 Timothy Prickett Morgan

    While I was off on Winter Break with my wife and kids in the mountains of Vermont two weeks ago, IBM snuck out some price cuts on processor features in the current generation of Power 595 boxes.

    In announcement letter 310-127, IBM cut the prices on the four-socket processor books used in the Power 595s as well as on the activation fees it charges for turning on Power6 cores within the boxes using its Capacity On Demand (COD) feature. The features that had their prices chopped are all on the 9119 series of machines, which only have Power6 chips, not the earlier System i 595 and System p 590 and 595 boxes, which were based on Power5 and Power5+ processors.

    • Feature 4694, 4.2 GHz processor book with eight cores and none activated, now costs $33,456, down 32 percent.
    • Feature 4754, which activates a 4.2 GHz core on the above-mentioned processor book, now costs $16,796, a 32 percent price cut to the list price before February 17.
    • Feature 4695, a 5 GHz processor book with eight cores (again none activated), now costs $47,390, down 30 percent. Feature 4754, a similar 5 GHz processor book with eight cores (with zero active) and 64 GB of memory activated on the book, costs the same $47,390 after 30 percent cut in price. (Why IBM isn’t charging for the 64 GB of memory is a mystery to me.)
    • Feature 4755, which activates the 5 GHz cores on the two cards above, now costs 30 percent less, too, at $23,730 per core.

    The price cuts on the processor books and core activations are designed to do two things: help IBM sell upgrades to customers using Power 595s who don’t want to move to Power 770 or 780 boxes based on Power7 processors yet, and to get the pricing on the Power 595s more in line with the Power 795, if that is indeed the name of the high-end machine that will come out later this year based on the Power7 chip.

    The processor price cut mirrors a memory price cut for Power 595s that IBM did back in August 2009 and similar memory cuts for smaller Power6 and Power6+ machines back in November 2009. Back in August, the Power 595 memory activation prices were cut by 19 percent, but through a rebate promotion, not an actual price cut as was done for the Power 595 CPUs above and for memory used in Power 520, 550, 560, and 570 machines in November. Those memory cuts, which ranged from 28 to 70 percent off, were made permanent and were designed to help move gear in the fourth quarter of 2009 and first quarter of 2010 as IBM made ready to launch the midrange of the Power7-based Power Systems line.

    Last week, IBM also announced a remote implementation and migration service for IBM servers and storage arrays. The details in announcement letter 610-008 are a bit thin in terms of being specific about the products covered. And it being IBM Global Services, there is no such thing as a list price for the service. But the remote implementation service is designed to help you plan, implement, configure, and test the upgrading of servers and storage by having an IBM expert hooked to your data center and your new and old gear virtually rather than physically show up.

    RELATED STORIES

    The Power Systems Catalog Gets Skinnier

    IBM to Mothball a Whole Bunch of Stuff with Power7

    IBM Chops Memory Prices on Power 595s

    IBM Tweaks Power 570, 595 Deals Yet Again

    IBM Does More Deals to Move Power Systems Iron

    IBM Sunsets More Power Systems Features

    IBM Indeed Relaunches Tweaked Power Systems Deal

    More Power Systems Price Changes and Tweaks

    Clarification on IBM’s Power Systems Withdrawals

    Older Power Iron Starts Heading for the Dustbin

    IBM Wheels and Deals on Power 570s and 595s in Q2

    Sundry Spring Power Systems Storage Enhancements

    Power Systems Finally Get Solid State Disks

    New Power6+ Iron: The Feeds and Speeds

    IBM Launches Power6+ Servers–Again

    IBM Tweaks Some i Deals, Nukes Some Old i Tools

    IBM Adds New SAS, SSD Disks to Servers

    IBM Adds i Shops to Expanded p Shop Trade-In Deal



                         Post this story to del.icio.us
                   Post this story to Digg
        Post this story to Slashdot

    Share this:

    • Share on Reddit (Opens in new window) Reddit
    • Share on Facebook (Opens in new window) Facebook
    • Share on LinkedIn (Opens in new window) LinkedIn
    • Share on X (Opens in new window) X
    • Email a link to a friend (Opens in new window) Email

    Tags: Tags: mtfh_rc, Volume 19, Number 9 -- March 1, 2010

    Sponsored by
    ARCAD Software

    [IBM i Auditing Tool] Discover the Health of Your IBM i Applications in Minutes with ARCAD iCheck-up

    How well do you really know the health of your IBM i applications? Hidden complexity, unused code, and synchronization issues can make maintenance more challenging and slow down modernization efforts.

    What if you could identify these issues in just a few clicks, without installing anything on your IBM i system?

    Meet ARCAD iCheck-up, an auditing tool designed to give IBM i teams a clear, actionable overview of their applications in minutes.

    With iCheck-up, you can:

    • Assess code complexity: Identify complex source files and prioritize refactoring efforts.
    • Detect dead code: Uncover unused code that may be cluttering your applications.
    • Spot synchronization issues: Identify inconsistencies between source files and compiled objects.
    • Track code changes: Explore modification history and better understand your application’s evolution.
    • Generate a shareable report: Get a comprehensive, easy-to-read HTML report with key metrics and insights.

    Fast, simple, and secure. iCheck-up runs from Windows, requires no installation on your IBM i system, and leaves no files or code behind. Your generated report contains metrics only, keeping your source code confidential.

    Whether you’re maintaining existing applications, planning modernization, or looking to improve code quality, iCheck-up helps you make more informed decisions.

    Ready to gain deeper insights into your IBM i applications? Discover ARCAD iCheck-up and take the first step toward better code quality today!

    Share this:

    • Share on Reddit (Opens in new window) Reddit
    • Share on Facebook (Opens in new window) Facebook
    • Share on LinkedIn (Opens in new window) LinkedIn
    • Share on X (Opens in new window) X
    • Email a link to a friend (Opens in new window) Email

    Hackers Escalate Web Site Attacks, Despite Decline in Security Vulnerabilities No Power 750, 770, and 780 Prices for i Configs? What Gives?

    Leave a ReplyCancel reply

TFH Volume: 19 Issue: 9

This Issue Sponsored By

    Table of Contents

    • X64 and Blade Servers Lead the Server Recovery
    • Custom Baby Data Centers Coming from Big Blue
    • System Automation, VTL, and Security Linked in Help/Systems, Crossroads Deal
    • Mad Dog 21/21: It’s i or Die for Power in the Midrange
    • Hackers Escalate Web Site Attacks, Despite Decline in Security Vulnerabilities
    • IBM Cuts Power 595 CPU Prices, Offers Remote Server Migration
    • No Power 750, 770, and 780 Prices for i Configs? What Gives?
    • MKS Recovering Nicely From the Economic Storm
    • IBM Assigns Per-Core Pricing Metrics to Power7 Chips
    • Intelliden Snapped Up by IBM for Network Management

    Content archive

    • The Four Hundred
    • Four Hundred Stuff
    • Four Hundred Guru

    Recent Posts

    • Bob Code Assistant Gets Better Understanding Of IBM i Applications
    • IBM i In The Cloud And The Case For Reversing Replication
    • Guru: From Hiking Boots To Long-Term Memory
    • Inside IBM’s New PowerHA Cloud Offering, Full System Manager
    • IBM i PTF Guide, Volume 28, Number 39
    • Power Systems Turns In Another Great Quarter
    • Big Blue Is Right On Schedule With Fall 2026 IBM i Tech Refreshes
    • Guru: Environment Variables – Global Variables Wearing Hiking Boots
    • A New IBM i Entity Takes Shape: Power By Fortra
    • IBM i PTF Guide, Volume 28, Number 38

    Subscribe

    To get news from IT Jungle sent to your inbox every week, subscribe to our newsletter.

    Pages

    • About Us
    • Contact
    • Contributors
    • Four Hundred Monitor
    • IBM i PTF Guide
    • Media Kit
    • Subscribe

    Search

    Copyright © 2025 IT Jungle