• The Four Hundred
  • Subscribe
  • Media Kit
  • Contributors
  • About Us
  • Contact
Menu
  • The Four Hundred
  • Subscribe
  • Media Kit
  • Contributors
  • About Us
  • Contact
  • IBM Delivers Yet Another Hardware Management Console

    September 13, 2010 Timothy Prickett Morgan

    How many different types of Linux-based PCs does it take to screw in a PowerVM hypervisor? Apparently more than one. And apparently IBM still thinks it is fine to charge an outrageous price for the Hardware Management Console (HMC), which is little more than a low-end X64-based server running a control console for PowerVM as it runs on Power5 and higher systems.

    This week, IBM will roll out another in a long line of HMCs that I cannot see as anything other than a profit center for Big Blue. In announcement letter 110-146, the details of the 7402-CR6 iteration of the rack-mounted HMCs debuts. The new HMC is based on a single quad-core Intel Xeon processor spinning at 2.53 GHz with 12 MB of L2 cache memory; the machine has 4 GB of main memory, one 2.5-inch SATA disk, one SATA CD/DVD drive, four Gigabit Ethernet ports, and two peripheral slots (one PCI-Express and one PCI-X). The machine can be equipped with a modem for remote electronic support, but IBM recommends a broadband link. The HMC uses the V7R720 version of the HMC licensed internal code, which allows for memory mirroring for the system firmware and allows command-line support for IBM i network installation.

    In this announcement you will learn that if you are moving to Power7 iron, you will need to have an HMC at the CR3 or higher level for rack-mounted HMCs and at the C05 level or higher for deskside HMCs. Multiple System i, System p, and Power Systems servers can have their PowerVM hypervisors managed from a single console, which is a good thing. But for shops that have a relatively small Power Systems machine, shelling out $5,800 for this new HMC, plus anywhere from $875 to $1,290 for an LCD screen, $107 for a keyboard, $39 for a mouse, $18for a power cord, $200 for a modem, and $277 for a redundant power supply will seem a bit much for a machine that does nothing except manage PowerVM logical partitions.

    I said it before and I will say it again: IBM should be selling HMCs for $1,000 or less–including a monitor. And better still, the HMC should be implemented like the service processor itself on the Power Systems boxes, including redundancy and mirroring of the hypervisors. It should be part of the box and included in the price, not a gotcha that customers get zinged by after the fact. Especially at the prices that IBM i customers are paying for hardware and systems software.

    RELATED STORIES

    IBM Delivers Deskside HMC Console for PowerVM Management

    Internet Explorer 8 Doesn’t Support HMC V7. . . or Does It?

    IBM Launches Upgraded, Rack-Mounted HMC for Partition Control

    Trouble-Shooting WebSM to HMC Connectivity Problems

    Admin Alert: Remotely Accessing an HMC System Console, Part 2

    Admin Alert: Remotely Accessing an HMC System Console, Part 1

    IBM Announces New HMCs for System p and System i Servers

    IBM Launches New HMC for Power 5 Servers

    Sundry Summer Announcements for the System i5

    IBM Offers HMC-Less iSeries Linux Partitioning

    Problems with Early i5 Plague Customers, Partners



                         Post this story to del.icio.us
                   Post this story to Digg
        Post this story to Slashdot

    Share this:

    • Share on Reddit (Opens in new window) Reddit
    • Share on Facebook (Opens in new window) Facebook
    • Share on LinkedIn (Opens in new window) LinkedIn
    • Share on X (Opens in new window) X
    • Email a link to a friend (Opens in new window) Email

    Tags: Tags: mtfh_rc, Volume 19, Number 32 -- September 13, 2010

    Sponsored by
    ARCAD Software

    [Webinar] Git on IBM i: A True Look at What It Takes

    Ready to bring your IBM i development into the modern DevOps era? Join Jeff Tickner, CTO North America, and Alan Ashley, Sr. Solutions Architect, for a practical look at what it really takes to migrate to Git on IBM i and how to do it right.

    What you’ll discover:

    • Modern DevOps approaches to bring teams together and boost efficiency with flexible Git options
    • Bi-directional push/pull operations and pipeline automation
    • Best practices based on years of real-world experience
    • ARCAD’s seamless and highly optimized Git integration in action

    Whether you’re evaluating Git for the first time or planning your migration strategy, this session will provide a clear, actionable path forward.

    Register Now!

    Share this:

    • Share on Reddit (Opens in new window) Reddit
    • Share on Facebook (Opens in new window) Facebook
    • Share on LinkedIn (Opens in new window) LinkedIn
    • Share on X (Opens in new window) X
    • Email a link to a friend (Opens in new window) Email

    Asseco Group Buys Formula Systems, and Therefore Magic Software VAI Positions ERP Suite for Business Recovery

    Leave a ReplyCancel reply

TFH Volume: 19 Issue: 32

This Issue Sponsored By

    Table of Contents

    • IBM Adds New SSD and Fat SFF Disk to Power Systems
    • Power7 Planning Beyond the Bells and Whistles
    • Companies Buy Lots of Disk Storage–At Cheap Prices–in Q2
    • As I See It: Introducing the New Quarterlife Crisis (with Cheese)
    • CIOs Are a Little More Optimistic About IT Hiring–But Not Much
    • Maxava Officially Becomes Maxava
    • COMMON Fall Conference Offers 112 Sessions in San Antonio
    • IBM i 7.1 Gets Support for PCI Express Crypto Co-Processor, LTO-5 Tapes
    • Asseco Group Buys Formula Systems, and Therefore Magic Software
    • IBM Delivers Yet Another Hardware Management Console

    Content archive

    • The Four Hundred
    • Four Hundred Stuff
    • Four Hundred Guru

    Recent Posts

    • More Power Systems Price Hikes, This Time They Are “Directional”
    • AI Is Not Just For Developers, It Is For Everyone At Your Company
    • Guru: Finding Data In The Forest – Exploring Three-Part Naming In SQL
    • Former IBMer’s New Book Puts The Midrange In The Spotlight
    • Have You Tried To Buy A Server Lately?
    • GenAI Is The Death Of Deterministic Project Budgeting
    • PTC Adds Support For VS Code With Implementer 12.7
    • Guru: Single Threading A Program Execution
    • As I See It: Push Back
    • IBM i PTF Guide, Volume 28, Number 21

    Subscribe

    To get news from IT Jungle sent to your inbox every week, subscribe to our newsletter.

    Pages

    • About Us
    • Contact
    • Contributors
    • Four Hundred Monitor
    • IBM i PTF Guide
    • Media Kit
    • Subscribe

    Search

    Copyright © 2025 IT Jungle