• The Four Hundred
  • Subscribe
  • Media Kit
  • Contributors
  • About Us
  • Contact
Menu
  • The Four Hundred
  • Subscribe
  • Media Kit
  • Contributors
  • About Us
  • Contact
  • Tape Areal Density Growth To Outpace Disks and Flash?

    November 28, 2011 Timothy Prickett Morgan

    A lot of people want tapes and disks to die and flash to take over, but it looks like tape technology is not about to go gently into that night. And it is not just a matter of cost per gigabyte, but the density of the three different types of storage devices.

    Roger Luethy, a storage specialist at IBM Switzerland, posted a paper that storage techies Robert Fontana, Steven Hetzler, and Gary Decad of the Almaden Research Center in San Jose, California, published some time earlier this year that shows that maybe the 40 percent annual growth rate in areal density (in terms of gigabytes per square inch) will be maintained or even doubled up for tape technology, and that the growth rate in disk drive and flash storage density could be cut in half.

    According to the IBM research paper, which you can read here, this is what the trend lines would look like if current trends in storage media density would persist into the future:

    Everything looks hunky dory, right? Tape has nowhere the density of disk or flash. I would remind you that back in 2000, Intel was projecting with absolute confidence that we would be breaking the 10 GHz speed barrier on chips. Right up until the point where we ran up against the thermal limits of Moore’s Law, which said that you could shrink the size of transistors every 18 months or so. Those same limits of physics that plague processors in one way make it tough on increasing areal density and therefore storage capacity on various magnetic media. So here is what IBM is now projecting as a more likely scenario:

    The cut and dry of it is that the bit cell size on tape is anywhere from 300 to 500 times larger than those used in disks and flash, and therefore has more room to shrink. What this means from a practical standpoint is that by 2014, tape technology with maybe 12 Gbit per square inch of areal density could cram as much as 15 TB of capacity into a cartridge, while a disk drive might only come in at 6 TB instead of the 12 TB extrapolation might expect based on historical 40 percent annual growth rate in density. And a flash-based solid state drives might only top out at 1.2 TB by 2014 instead of 2 TB.

    Obviously, flash, with an access time of microsecond, and disk, with an access time of milliseconds, beats out tape, which takes seconds to find a file (and that is under the best of circumstances). But in 2010, IBM’s researchers remind us, flash cost $3 per GB compared to 3 cents per GB for tape. Everything has its place, and even if you don’t store you data on tape somewhere, you very likely will offload the job to some third party–and one that calls themselves a “cloud” just to be cool.



                         Post this story to del.icio.us
                   Post this story to Digg
        Post this story to Slashdot

    Share this:

    • Reddit
    • Facebook
    • LinkedIn
    • Twitter
    • Email

    Tags:

    Sponsored by
    iTech Solutions

    Choose Your Own IBM i OS Upgrade Adventure

    Choice 1:

    • Plan for 3 months
    • Check hardware & software compatibility
    • Check Lan Console, MQ, Domino, SMB, Ciphers, WebSphere, Java
    • Test, test, and test again
    • Prepare for potential downtime
    • Hope the OS Upgrade goes smoothly
     

    Choice 2:

    • Strategically plan alongside a team of IBM i experts
    • Work with experienced system admins to ensure hardware & software compatibility
    • Receive full analysis of Lan Console, MQ, Domino, SMB, Ciphers, WebSphere, Java
    • Know which PTFs are required for the upgrade
    • Relax, and let iTech handle the rest

    Not every OS Upgrade has to be an adventure. We make the process easy for you.

    Having completed thousands of upgrades, we have the experience, know-how, and expertise to get the job done seamlessly. We know what can go wrong, what to plan for, and can act quickly if problems arise.

    No matter where you are in your journey, we’re here to help. Take a look at the video below to ensure you’re on the right path when it comes to your next IBM i OS Upgrade.

    [Video] What You Need to Know to Successfully Upgrade to IBM i 7.4 and 7.5

    An IBM i OS upgrade isn’t complete until all the boxes are checked. Is your list up to date?

    In this video, Pete Massiello covers what’s new on IBM i 7.5, planning tips, pre-requisites, and post-installation requirements for a successful OS Upgrade.

    [ Watch Now ]

    Share this:

    • Reddit
    • Facebook
    • LinkedIn
    • Twitter
    • Email

    Putting Your i System in Semi-Restricted State Profound Announces Another RPG:OA First, Unveils RDi Plug-In

    Leave a Reply Cancel reply

Volume 20, Number 40 -- November 28, 2011
THIS ISSUE SPONSORED BY:

PowerTech
looksoftware
Maxava
Cosyn
Shield Advanced Solutions

Table of Contents

  • Feeling Like A Heel
  • More On That Dreamy And Flashy Power 720 P05 Machine
  • Business Strategy Bumps Into Database Deficiency
  • As I See It: Privacy Pirates
  • Where Are Those eXFlash SSDs For Power Systems-IBM i?
  • Warren Buffett Amasses a $10.7 Billion Stake in Big Blue
  • Tape Areal Density Growth To Outpace Disks and Flash?
  • Help/Systems Leads New Entries Into IBM i Solution Edition Program
  • Mainline Buys KgW For IBM, VMware Expertise
  • IBM Fights Performance Anxiety on Power Systems

Content archive

  • The Four Hundred
  • Four Hundred Stuff
  • Four Hundred Guru

Recent Posts

  • IBM i 7.3 TR12: The Non-TR Tech Refresh
  • IBM i Integration Elevates Operational Query and Analytics
  • Simplified IBM i Stack Bundling Ahead Of Subscription Pricing
  • More Price Hikes From IBM, Now For High End Storage
  • Big Blue Readies Power10 And IBM i 7.5 Training for Partners
  • IBM Delivers More Out-of-the-Box Security with IBM i 7.5
  • Groundhog Day For Malware
  • IBM i Community Reacts to IBM i 7.5
  • Four Hundred Monitor, May 11
  • IBM i PTF Guide, Volume 24, Number 19

Subscribe

To get news from IT Jungle sent to your inbox every week, subscribe to our newsletter.

Pages

  • About Us
  • Contact
  • Contributors
  • Four Hundred Monitor
  • IBM i PTF Guide
  • Media Kit
  • Subscribe

Search

Copyright © 2022 IT Jungle

loading Cancel
Post was not sent - check your email addresses!
Email check failed, please try again
Sorry, your blog cannot share posts by email.