• The Four Hundred
  • Subscribe
  • Media Kit
  • Contributors
  • About Us
  • Contact
Menu
  • The Four Hundred
  • Subscribe
  • Media Kit
  • Contributors
  • About Us
  • Contact
  • IBM Cuts Deals To Get IBM i, AIX Shops Back On Maintenance

    April 16, 2012 Timothy Prickett Morgan

    If you let you the Software Maintenance, or SWMA (pronounced “swamma” in IBMese), lapse on your IBM i or AIX operating system licenses, you have to pay a big fee to get them back under support at IBM. IBM wants to cut customers a little slack, and recently modified a long-running deal from November 2008 that now allows them to finance the maintenance after-license fees.

    If you extract the Software Maintenance fees from an IBM i license, then the software itself costs from $1,945 per core on a P05 machine to $53,000 per core on a P50 machine. The Software Maintenance fee costs from $1,200 to $6,000 per core per year on those machines, which entitles you to tech support calls and software patches. The maintenance after license fee (or MAL, as it is abbreviated, and very appropriately if you speak French or Spanish) runs from $2,600 to $14,000 per core to get it back on maintenance. Obviously with that charge to get current, IBM is assuming that customers lapse for more than a year and is trying to recoup the money it would have otherwise gotten had they stayed on maintenance, which no doubt will help cover the increased service costs related to getting a customer current on iron.

    In any event, in announcement letter 312-046 for IBM and in announcement letter 312-045, IBM wanted to remind everyone that it does have a heart of sorts, and if customers slip out from under the Software Maintenance umbrella with IBM i or AIX, it does have a deal that cushions the maintenance after license blow a little in the first year. Here’s how the discount works:

    • Less than 1 month, 100%
    • At least 1 month, but less than 2 months, 86%
    • At least 2 months, but less than 3 months, 74%
    • At least 3 months, but less than 4 months, 65%
    • At least 4 months, but less than 5 months, 56%
    • At least 5 months, but less than 6 months, 48%
    • At least 6 months, but less than 7 months, 39%
    • At least 7 months, but less than 8 months, 30%
    • At least 8 months, but less than 9 months, 22%
    • At least 9 months, but less than 10 months, 14%
    • At least 10 months, but less than 12 months, 8%

    Obviously, the sooner you get back to cutting IBM checks for Software Maintenance, the better in terms of reducing the MAL fees, and if you go out beyond a year, there’s no break for you at all. But at least now, if you are hard up for cash, IBM will let you finance the MAL charges and spread the costs out over a 12-, 24-, or 36-month term if that suits your budget better.



                         Post this story to del.icio.us
                   Post this story to Digg
        Post this story to Slashdot

    Share this:

    • Reddit
    • Facebook
    • LinkedIn
    • Twitter
    • Email

    Tags:

    Sponsored by
    Midrange Dynamics North America

    Git up to speed with MDChange!

    Whether you are managing large Git repositories for IBM i applications or you’re orchestrating smaller repositories, Midrange Dynamics has solutions to boost Git performance for IBM i.

    Git workflow in MDChange is specifically designed for IBM i, optimizing repository management, testing, and deployments for greater productivity, flexibility, and scalability. MDChange supercharges performance for GitHub, GitLab, Bitbucket, and Azure Repos.

    Learn More.

    Share this:

    • Reddit
    • Facebook
    • LinkedIn
    • Twitter
    • Email

    What Happened to My QFileSvr.400 Connection? Velocity Sees Positive Trajectory in ERP Cloud Biz

    Leave a Reply Cancel reply

Volume 21, Number 15 -- April 16, 2012
THIS ISSUE SPONSORED BY:

Infinite Corporation
ASNA
BCD
Linoma Software
American Top Tools

Table of Contents

  • As I See It: Pocket Litter
  • IBM Launches Hybrid, Flexible Systems Into The Data Center
  • A Closer Look At The Flex System Iron
  • IBM Rolls Out iTunes-Like Store For Enterprise Apps
  • Some Carrots To Get i5/OS V5 Shops To Move Forward
  • Businesses Optimistic About Second Quarter IT Hiring
  • IBM Cuts Deals To Get IBM i, AIX Shops Back On Maintenance
  • IBM Honors Its Top Technologists With Fellow Status
  • Companies Still Bullish On Business Intelligence Spending
  • JDA To Restate Financials From 2008 Through 2011

Content archive

  • The Four Hundred
  • Four Hundred Stuff
  • Four Hundred Guru

Recent Posts

  • What You Will Find In IBM i 7.6 TR1 and IBM i 7.5 TR7
  • Three Things For IBM i Shops To Consider About DevSecOps
  • Big Blue Converges IBM i RPG And System Z COBOL Code Assistants Into “Project Bob”
  • As I See It: Retirement Challenges
  • IBM i PTF Guide, Volume 27, Number 41
  • Stacking Up Power11 Entry Server Performance To Older Iron
  • Big Blue Boosts IBM i Support In Instana, Adds Tracing
  • It Is Time To Tell Us What You Are Thinking And Doing
  • IBM i PTF Guide, Volume 27, Number 40
  • The GenAI Boom Is Only Slightly Louder Than The Dot Com Boom

Subscribe

To get news from IT Jungle sent to your inbox every week, subscribe to our newsletter.

Pages

  • About Us
  • Contact
  • Contributors
  • Four Hundred Monitor
  • IBM i PTF Guide
  • Media Kit
  • Subscribe

Search

Copyright © 2025 IT Jungle