• The Four Hundred
  • Subscribe
  • Media Kit
  • Contributors
  • About Us
  • Contact
Menu
  • The Four Hundred
  • Subscribe
  • Media Kit
  • Contributors
  • About Us
  • Contact
  • IBM Inks In End Of Support For Power6 And Power7 Iron

    September 25, 2017 Timothy Prickett Morgan

    In case you didn’t notice it, IBM is getting ready to embark on a new generation of systems, based on its “Nimbus” and “Cumulus” Power9 chips.

    When new gear is entering the product catalog, IBM has a few tools to help encourage customers to move ahead rather than sitting tight. First, it tends to withdraw the older stuff – in this case systems using Power6, Power6+, Power 7, and Power7+ processors – from marketing. That sends the signal that customers won’t be able to get new processor cards, memory cards, and other peripherals for these machines. Then, IBM can raise maintenance fees on older iron, making it prohibitively expensive for those customers who do engage IBM with technical support contracts with its Software Maintenance, or SWMA, services, which have for many years bundled together hardware and base software support. Third, IBM can just stop providing maintenance services entirely from older gear, which adds to the move ahead signal.

    This latter move is not always used, at least from my own recollection. I can remember vintage equipment like B, C, and D series machines being on maintenance services for something crazy like ten or fifteen years after they came to the market. (Perhaps my memory exaggerates.) The Power6 machines date from 2007, the Power6+ came in 2008, Power7 was launched in 2010, and Power7+ debuted in 2012. (IBM tends to do announcements in April or October, just like OpenStack and Ubuntu Linux releases. It is a coincidence, sort of. Like seasons. There are exceptions to this rule, of course.)

    On September 19, in announcement letter 917-163, Big Blue told customers of various vintage Power iron that it was going to be cutting standard hardware maintenance on their machine. For once, the IBM announcement letter actually didn’t just give a list of product numbers but the product names by which most of us talk about these machines.

    The following Power6 and Power6+ machines will have an end of support, or EOS, date of March 31, 2019:

    The following Power7 and Power7+ machines will have support for six months longer, until September 30, 2019:

    IBM adds that for “select machine types” it will offer “limited hardware maintenance service available without lapse,” but specifically what machines among these shown and the precise nature of these limitation support services was not detailed.

    The message, in case you have not gotten it, is that you should move to Power8 iron now or start getting ready for Power9. It probably makes sense to start building a case for Power9 gear and a modern IBM i release, which should put you in good stead for many years to come. It is a bit risky to wait to see what the Power9 machines might hold, and how they might be priced. But you might also end up overpaying for Power8 iron if you move now. It is hard to say without more data.

    RELATED STORIES

    Sundry Withdrawals For Power7 And Power7+ Gear

    Clearing The Decks Ahead Of The Power9 Launch

    Say Sayonara To IBM i 7.1 Next Spring

    Some Power Systems Tweaks And Sales Withdrawals

    Sundry Power Systems Withdrawals, New I/O Tweaks

    The Chatter About Future Power9 Servers

    Why Not Overclock Power Chips For IBM i?

    The Power Neine Conundrum

    IBM Commits To Power9 Upgrades For Big Power Systems Shops

    The Cognitive Systems/500 2018 Edition

    IBM i And AIX Won’t Get Power9 Until 2018

    The Supercomputer At The Heart Of The Power Systems Revival

    IBM Puts Future Power Chip Stakes In The Ground

    Power9 Gets Ready To Roll In Systems In 2017

    The Prospects For A Power9 Revolution

    Share this:

    • Reddit
    • Facebook
    • LinkedIn
    • Twitter
    • Email

    Tags: Tags: IBM i, Power 7, Power6, Power7, Power9, SWMA

    Sponsored by
    ARCAD Software

    DevSecOps & Peer Review – The Power of Automation

    In today’s fast-paced development environments, security can no longer be an afterthought. This session will explore how DevSecOps brings security into every phase of the DevOps lifecycle—early, consistently, and effectively.

    In this session, you’ll discover:

    • What DevSecOps is and why it matters?
    • Learn how to formalize your security concerns into a repeatable process
    • Discover the power of automation through pull requests, approval workflows, segregation of duties, peer review, and more—ensuring your data and production environments are protected without slowing down delivery.

    Whether you’re just getting started or looking to enhance your practices, this session will provide actionable insights to strengthen your security posture through automation and team alignment to bring consistency to the process.

    Watch Now!

    Share this:

    • Reddit
    • Facebook
    • LinkedIn
    • Twitter
    • Email

    Cloud Provides A Third HA Option Watson In The Real World

    Leave a Reply Cancel reply

TFH Volume: 27 Issue: 61

This Issue Sponsored By

  • New Generation Software
  • HiT Software, Inc. a BackOffice Associates Company
  • ASNA
  • Computer Keyes
  • WorksRight Software

Table of Contents

  • The Necessity Of A Power Systems 911
  • Evaluating Your IBM i Encryption Options
  • Guru: IBM i, .Net, and XMLSERVICE Program and Subprocedure Calls
  • Watson In The Real World
  • IBM Inks In End Of Support For Power6 And Power7 Iron

Content archive

  • The Four Hundred
  • Four Hundred Stuff
  • Four Hundred Guru

Recent Posts

  • Power Systems Grows Nicely In Q3, Looks To Grow For All 2025, Too
  • Beta Of MCP Server Opens Up IBM i For Agentic AI
  • Sundry IBM i And Power Stack Announcements For Your Consideration
  • Please Take The IBM i Marketplace Survey
  • IBM i PTF Guide, Volume 27, Number 43
  • IBM Pulls The Curtain Back A Smidge On Project Bob
  • IBM Just Killed Merlin. Here’s Why
  • Guru: Playing Sounds From An RPG Program
  • A Bit More Insight Into IBM’s “Spyre” AI Accelerator For Power
  • IBM i PTF Guide, Volume 27, Number 42

Subscribe

To get news from IT Jungle sent to your inbox every week, subscribe to our newsletter.

Pages

  • About Us
  • Contact
  • Contributors
  • Four Hundred Monitor
  • IBM i PTF Guide
  • Media Kit
  • Subscribe

Search

Copyright © 2025 IT Jungle