• The Four Hundred
  • Subscribe
  • Media Kit
  • Contributors
  • About Us
  • Contact
Menu
  • The Four Hundred
  • Subscribe
  • Media Kit
  • Contributors
  • About Us
  • Contact
  • IBM Sunsets Big Iron Power8 Engines As Power9 Engines Loom

    July 23, 2018 Timothy Prickett Morgan

    Big Blue must be getting an itchy launch finger for the high end of the Power Systems lineup, and you can usually tell the company is ready to launch the new thing when it starts warning customers they better get their checkbooks out to buy the old thing while it is still available.

    In announcement letter A18-0567, which came out on July 17, the warning was a bit shorter than usual, and we are not sure why. Perhaps IBM meant to give a warning and didn’t realize it was running out of certain Power8 processors aimed at Power E880 and Power E8880C enterprise-class processors. We don’t know. But what we can tell you is that effective that day, IBM stopped selling the 48-core processor complex for those two high end machines, which are among the most powerful ones that IBM sells in the Power Systems line. To be specific, the four card, 48-core processor features running at 4.02 GHz for these systems are no longer available for the plain vanilla servers or their Capacity BackUp (CBU) high availability mirror or SAP HANA (using the Integrated Facility for Linux) variants. These processors are not available for new system orders or for field upgrades from prior generations of Power7 and Power7+ machines alike.

    IBM is suggesting that customers who are doing new orders of Power E880C machines should consider taking a 40-core Power8 complex running at 4.19 GHz or a 32-core Power8 complex running at 4.35 GHz. Our advice has always been to go with more clocks and the fewest cores possible because of the core-based software pricing for IBM i and third party applications, so this seems reasonable to us.

    That said, it is probably more reasonable to see what IBM has in store for the “Zeppelin” Power E950 (one node, four socket) and “Fleetwood” Power E980 (two or four nodes, with eight or 16 sockets) servers that are expected sometime in the third quarter. That means any day now, more or less. With the Power9 chips offering considerably more performance per core – somewhere between 40 percent and 50 percent, depending on the clock speeds – than the Power8 chips they will replace, it makes sense to wait if you can and cut back on the number of cores even further. IBM has promised to offer upgrades from Power E870 and Power E880 to Power E970 and Power E980 machines. I had been guessing, way back in October 2017, that IBM would have this big Power9 iron out by this May. The one from two months ago. But that was just a hunch. The plan was good as of February, but it could have changed for all I know.

    RELATED STORIES

    At Long Last, IBM i Finally Gets Power9

    IBM Readies Mainstream Power9 Iron For Launch

    Power9 Big Iron “Fleetwood/Mack” Rumors

    IBM Commits To Power9 Upgrades For Big Power Systems Shops

    Share this:

    • Share on Reddit (Opens in new window) Reddit
    • Share on Facebook (Opens in new window) Facebook
    • Share on LinkedIn (Opens in new window) LinkedIn
    • Share on X (Opens in new window) X
    • Email a link to a friend (Opens in new window) Email

    Tags: Tags: Fleetwood, IBM i, Power E870, Power E880, Power E950, Power E970, Power E980, Power8, Power9, Zeppelin

    Sponsored by
    Maxava

    Migrate IBM i with Confidence

    Maxava Migrate LiveTM minimizes disruption with seamless transitions. Upgrading to Power11, or cloud hosted system, Maxava has you covered!

    MIGRATE NOW

    Share this:

    • Share on Reddit (Opens in new window) Reddit
    • Share on Facebook (Opens in new window) Facebook
    • Share on LinkedIn (Opens in new window) LinkedIn
    • Share on X (Opens in new window) X
    • Email a link to a friend (Opens in new window) Email

    RPM And Yum Are A Big Deal For IBM i. Here’s Why The Frustration Of Not Knowing How We Are Doing

    Leave a ReplyCancel reply

TFH Volume: 28 Issue: 48

This Issue Sponsored By

  • Fresche Solutions
  • ARCAD Software
  • RPG & DB2 Summit
  • Computer Keyes
  • WorksRight Software

Table of Contents

  • Db2 For i Innovation: Expect The Unexpected
  • Outsourcing Comes Back Home
  • Guru: Serve Web Pages Safely Using A Reverse Proxy
  • The Frustration Of Not Knowing How We Are Doing
  • IBM Sunsets Big Iron Power8 Engines As Power9 Engines Loom

Content archive

  • The Four Hundred
  • Four Hundred Stuff
  • Four Hundred Guru

Recent Posts

  • Power Systems Turns In Another Great Quarter
  • Big Blue Is Right On Schedule With Fall 2026 IBM i Tech Refreshes
  • Guru: Environment Variables – Global Variables Wearing Hiking Boots
  • A New IBM i Entity Takes Shape: Power By Fortra
  • IBM i PTF Guide, Volume 28, Number 38
  • Critical PHP2Shell Security Vulns Evoke ‘Black October’
  • Why Fortra Partnered with FalconStor to Launch Continuity Care: A Validated Recovery Service for IBM i
  • Guru: Analyzing User Session Statistics, Part 2
  • Fresche Launches OpsIQ, a Free AI-Based Operation Assistant for IBM i
  • IBM i PTF Guide, Volume 28, Number 37

Subscribe

To get news from IT Jungle sent to your inbox every week, subscribe to our newsletter.

Pages

  • About Us
  • Contact
  • Contributors
  • Four Hundred Monitor
  • IBM i PTF Guide
  • Media Kit
  • Subscribe

Search

Copyright © 2025 IT Jungle