• The Four Hundred
  • Subscribe
  • Media Kit
  • Contributors
  • About Us
  • Contact
Menu
  • The Four Hundred
  • Subscribe
  • Media Kit
  • Contributors
  • About Us
  • Contact
  • A Slew Of Power Systems Features Are Being Sunsetted

    July 17, 2023 Timothy Prickett Morgan

    Big Blue has long since stopped selling Power8 machinery and has been winding down sales of Power9-based systems as its Power10 machines, which made their debut in late 2021 and early 2022, are ascending. So, it is natural that features for Power8 and Power9 machinery are being withdrawn. But even some features with the newer Power10 machines are also being withdrawn, in some cases because supplies are running out and in other cases because better features have been introduced.

    You have to keep up with these things so you can get what you need before IBM stops selling whatever that …

    Read more

Content archive

  • The Four Hundred
  • Four Hundred Stuff
  • Four Hundred Guru

Recent Posts

  • What You Will Find In IBM i 7.6 TR1 and IBM i 7.5 TR7
  • Three Things For IBM i Shops To Consider About DevSecOps
  • Big Blue Converges IBM i RPG And System Z COBOL Code Assistants Into “Project Bob”
  • As I See It: Retirement Challenges
  • IBM i PTF Guide, Volume 27, Number 41
  • Stacking Up Power11 Entry Server Performance To Older Iron
  • Big Blue Boosts IBM i Support In Instana, Adds Tracing
  • It Is Time To Tell Us What You Are Thinking And Doing
  • IBM i PTF Guide, Volume 27, Number 40
  • The GenAI Boom Is Only Slightly Louder Than The Dot Com Boom

Subscribe

To get news from IT Jungle sent to your inbox every week, subscribe to our newsletter.

Pages

  • About Us
  • Contact
  • Contributors
  • Four Hundred Monitor
  • IBM i PTF Guide
  • Media Kit
  • Subscribe

Search

Copyright © 2025 IT Jungle