• The Four Hundred
  • Subscribe
  • Media Kit
  • Contributors
  • About Us
  • Contact
Menu
  • The Four Hundred
  • Subscribe
  • Media Kit
  • Contributors
  • About Us
  • Contact
  • IBM i 7.2 End Dates Revealed as Power7 Shutdown Looms

    September 18, 2019 Alex Woodie

    IBM surprised nobody last week when it announced that it will stop selling IBM i 7.2 next April and cease supporting the operating system a year later. The lead time should give IBM i shops plenty of runway to prepare their upgrade strategies and transition to newer versions of the operating system. A potentially more impactful deadline for those not paying close attention is the end of hardware support for Power7 boxes in less than two weeks.

    Last week’s announcement of end of sales and support for IBM i 7.2 and related software products was not unexpected. That’s because IBM …

    Read more

Content archive

  • The Four Hundred
  • Four Hundred Stuff
  • Four Hundred Guru

Recent Posts

  • What You Will Find In IBM i 7.6 TR1 and IBM i 7.5 TR7
  • Three Things For IBM i Shops To Consider About DevSecOps
  • Big Blue Converges IBM i RPG And System Z COBOL Code Assistants Into “Project Bob”
  • As I See It: Retirement Challenges
  • IBM i PTF Guide, Volume 27, Number 41
  • Stacking Up Power11 Entry Server Performance To Older Iron
  • Big Blue Boosts IBM i Support In Instana, Adds Tracing
  • It Is Time To Tell Us What You Are Thinking And Doing
  • IBM i PTF Guide, Volume 27, Number 40
  • The GenAI Boom Is Only Slightly Louder Than The Dot Com Boom

Subscribe

To get news from IT Jungle sent to your inbox every week, subscribe to our newsletter.

Pages

  • About Us
  • Contact
  • Contributors
  • Four Hundred Monitor
  • IBM i PTF Guide
  • Media Kit
  • Subscribe

Search

Copyright © 2025 IT Jungle