• The Four Hundred
  • Subscribe
  • Media Kit
  • Contributors
  • About Us
  • Contact
Menu
  • The Four Hundred
  • Subscribe
  • Media Kit
  • Contributors
  • About Us
  • Contact
  • Parris Named Power Systems GM, Rosamilia Moves Up

    May 7, 2012 Timothy Prickett Morgan

    There are more executive changes at IBM and some familiar faces in the IBM i community have been promoted to new positions within Big Blue.

    When IBM launched the new X86-priced PowerLinux systems two weeks ago, I didn’t see it at first, but way at the bottom of the press release there’s a quote from Colin Parris, who is referred to as general manager of Power Systems at IBM.

    Tom Rosamilia, who ran the System z mainframe business for a stint, took over the combined Power Systems and System z business back in August 2010, appointing Parris the VP and business line manager for the Power Systems side and Greg Lotko has been named VP and business line manager for the System z servers. Rosamilia, who started out at IBM as an MVS developer in 1983, was appointed to head up System/390 software development in 1996; he brought Linux to the mainframe two years later, and then was made general manager of various software products within Software Group, including DB2, IMS, and Informix data management tools and then WebSphere products. He eventually became general manager of the vast WebSphere portfolio, which include middleware, transaction processing, e-commerce, and other stuff.

    Now, Rosamilia is vice president of corporate strategy and general manager of enterprise initiatives, and according to his bio will be “responsible for the strategic direction of IBM’s future, as well as developing the path that IBM will take as we move forward in this new era of computing.” Which sounds like the best possible job at the IBM Company, really. Anyway, keep your eye on Rosamilia. He is young enough to be the next CEO at IBM, and has done the classic turns through hardware and software to rise to the top some day.

    When Rosamilia was tapped to move up to his new position, IBM broke the System z and Power Systems lines back into two different divisions. Parris takes over as general manager of Power Systems, and Doug Balog, who has run development for IBM’s System x and BladeCenter machines and for IBM’s TotalStorage disk arrays before that, is now the general manager for the System z line. Like Rosamilia, Balog joined IBM in 1983 and has his System/390 chops, working on the development of the CMOS-based System/390s in the 1990s and being put in charge of OS/390 software development in the late 1990s.

    Parris was vice president in charge of the systems software development labs for Systems and Technology Group before taking over his Power Systems roles. Prior to this, Parris was vice president of digital convergence in IBM Research, dealing with virtual reality, among other things (remember Second Life?), and was also vice president of industry solutions and emerging business before that. Parris got his BS in electrical engineering from Howard University, an MS in management from Stanford University, and a PhD in electrical engineering from the University of California at Berkeley. He worked at AT&T Bell Laboratories on switching systems after college, and joined IBM Research in 1994, working on distributed systems, integrated services networks, and something called nomadic systems.

    I want to hear some more about nomadic systems, personally. Maybe he will talk about it a bit at the COMMON midrange trade show, which is being held this week.

    RELATED STORIES

    Rometty Kicks Off 2012 With Leadership Team Changes

    Palmisano Hands The IBM Reins To Rometty

    IBM Taps Software Exec For Power Systems Marketing

    IBM i 7.1 Leads OS Shipments, Pushes Entry Sales

    I, Cloud-i-us

    Q&A With Power Systems Top Brass, Part Two

    Q&A With Power Systems Top Brass, Part One

    IBM Puts Power Systems and System z Server Under One Manager

    IBM Reorganization Tucks Systems Under Software



                         Post this story to del.icio.us
                   Post this story to Digg
        Post this story to Slashdot

    Share this:

    • Reddit
    • Facebook
    • LinkedIn
    • Twitter
    • Email

    Tags:

    Sponsored by
    ARCAD Software

    Are you ready for AI on the IBM i? Optimization and guardrails. . .

    what you need to know today

    with Jeff Tickner

    As organizations assess the role and impact of AI, they must make informed choices, particularly around implementing guardrails to ensure secure and controlled usage.

    In this Lunch & Learn session, Jeff Tickner, CTO North America of ARCAD Software, and Alan Ashley, Sr. Solution Architect, will explore how to effectively prepare for the adoption of AI in IBM i environments.

    This session will cover key AI considerations, including:

    • Preparing source
    • Defining security rules and ensuring data privacy
    • Leveraging MCP Servers for optimization

    A deeper dive will also address:

    • The use of MCP Servers with BOB and other AI assistants
    • ARCAD’s approach to integrating AI into DevOps processes through MCP

    Register Now!

    By registering for this session, I acknowledge that my contact information will be shared with the sponsor, ARCAD.

    Share this:

    • Reddit
    • Facebook
    • LinkedIn
    • Twitter
    • Email

    Two Ask TPM Questions: Real IBM i Clouds And Apple Buying IBM i Infinite’s Migration Plan Targets IBM i ISVs

    Leave a Reply Cancel reply

Volume 21, Number 18 -- May 7, 2012
THIS ISSUE SPONSORED BY:

Bug Busters Software Engineering
Maxava
looksoftware
Computer Keyes
IntelliChief

Table of Contents

  • Apps And IBM i Evangelism
  • Abacus Solutions Puffs Up An IBM i Cloud
  • ‘New’ Infor’s Cloudy IPO Picture
  • Mad Dog 21/21: Gun-bae, Google, And Thanks For All The Tuna
  • Software Change Management Migrations Are Not Impossible
  • Two Ask TPM Questions: Real IBM i Clouds And Apple Buying IBM i
  • Parris Named Power Systems GM, Rosamilia Moves Up
  • Infinite’s Migration Plan Targets IBM i ISVs
  • Oracle Wants To Send SAP A $776.7 Million TomorrowNow Bill
  • Get IBM i Work Management And Security Skills In Under A Week

Content archive

  • The Four Hundred
  • Four Hundred Stuff
  • Four Hundred Guru

Recent Posts

  • Power Systems Still Waiting For The GenAI Bump
  • The IBM i and the Hybrid Cloud World: Things To Keep In Mind
  • CData Adds Db2 for i Support to CDC Tool
  • As I See It: The Cost of Having Ethics
  • Brace Yourself: Another Power Systems Price Hike Coming May 1
  • Updates Announced for IBM i BRMS And SMTP Email Client
  • AI Will Be Front And Center At POWERUp 2026 Next Week
  • IBM i PTF Guide, Volume 28, Number 16
  • Spring IBM i Tech Refreshes Will Come A Bit Later This Year
  • You Are Much More Than Power Systems, And So Are We

Subscribe

To get news from IT Jungle sent to your inbox every week, subscribe to our newsletter.

Pages

  • About Us
  • Contact
  • Contributors
  • Four Hundred Monitor
  • IBM i PTF Guide
  • Media Kit
  • Subscribe

Search

Copyright © 2025 IT Jungle