• The Four Hundred
  • Subscribe
  • Media Kit
  • Contributors
  • About Us
  • Contact
Menu
  • The Four Hundred
  • Subscribe
  • Media Kit
  • Contributors
  • About Us
  • Contact
  • Big Blue And ITG Build Case For IBM i Resiliency

    December 8, 2014 Dan Burger

    Business resiliency and business continuity are terms that are mistakenly used as synonyms with disaster recovery. A disaster is the worst type of disruption to business continuity. It is also the most infrequent. Like death from a thousand paper cuts, a variety of little things can play havoc with business resiliency. How much havoc is related to the value a company attaches to any aspect of the business that does not run at peak performance.

    Downtime is the enemy of business continuity. Every year the tolerance for downtime edges closer to zero. For some shops zero tolerance has been in effect for years. The financial loss is too extreme regardless of duration. For the most part, these are large businesses running big iron and they live in fear of losing their business continuity. They work to minimize it and understand the lack of continuity extends beyond localized systems to effect enterprise-wide systems and in many instances no customers and partners go unscathed.

    To demonstrate the importance of resilient systems, IBM hired the research and analytics firm ITG. IBM pitted its IBM i 7.2 operating system on Power 7+ hardware with PowerHA SystemMirror for i clusters compared to one system running MicrosoftWindows 2012 servers with SQL Server 2014 AlwaysOn clusters on Intel E5- and E7-based hardware and another system consisting of Windows 2012 servers running Oracle Exadata X3-8 and X4-2 systems with Real Application Clusters (RAC) and Data Guard.

    The focus on this comparison (the fairness of the comparison can be argued separately), comes down to two important issues: cost of downtime and risk exposure.

    The three-year costs of downtime by platform shows Microsoft Windows Server (green bar) to be the most costly and the IBM i/Power Systems (blue bar) to be the least costly in the financial services category.

    This report is based on large enterprise customers in two groups: financial services companies and supply chain companies. The financial services companies included a bank, an insurance company, and a services company. The supply chain companies included a manufacturer, a retail chain, and an industrial distributor. Revenues at these companies varied between $1 billion and $12 billion. Employee counts were between 2,000 and 50,000.

    In the supply chain category the IBM i/Power Systems combo (blue bar) is far less expensive than the Microsoft Windows Server (green bar) and Oracle Exadata (orange bar) systems.

    The cost of downtime for the supply chain companies was steepest for the manufacturer. That expense was $1,305 per hour. Downtime costs for the retail chain was $833 per hour and the distributor was losing $685 per hour when down. The factors affecting these numbers were supply chain disruption, lost sales, and customer penalties and remedial costs.

    Downtime costs for the financial services companies were highest for the bank. It was figured at $320 per hour. The insurance company downtime costs were figured at $164 per hour and the services company downtime was pegged at $149 per hour. The totals were attributed to customer attrition, lost fee income, and other costs.

    According to ITG, business costs attributable to outages were 8.3 times higher for the Windows/SQL Server system and 3.4 times higher for the Oracle Exadata system when compared to the IBM i system. The calculation took into account outages of less than three hours duration.

    Although the direct application of this comparison may apply to only a few large IBM i shops, everyone in the IBM i community should be aware of this study because it represents one of the few times IBM puts some effort into extolling the virtues of the platform. Business continuity is important for the small business, too.

    RELATED STORIES

    IBM i Total Cost Of Ownership Report Updated

    ITG Report: Resiliency Floats The IBM i Boat

    New ITG Report Is Reinforcement For The IBM i Advocate

    Arming The IBM i Nation

    ITG Says IBM i + DB2 for i Still Offers Lowest TCO

    IBM Touts System i TCO in ITG Report



                         Post this story to del.icio.us
                   Post this story to Digg
        Post this story to Slashdot

    Share this:

    • Reddit
    • Facebook
    • LinkedIn
    • Twitter
    • Email

    Tags:

    Sponsored by
    ARCAD Software

    Embrace VS Code for IBM i Development

    The IBM i development landscape is evolving with modern tools that enhance efficiency and collaboration. Ready to make the move to VS Code for IBM i?

    Join us for this webinar where we’ll showcase how VS Code can serve as a powerful editor for native IBM i code and explore the essential extensions that make it possible.

    In this session, you’ll discover:

    • How ARCAD’s integration with VS Code provides deep metadata insights, allowing developers to assess the impact of their changes upfront.
    • The role of Git in enabling seamless collaboration between developers using tools like SEU, RDi, and VS Code.
    • Powerful extensions for code quality, security, impact analysis, smart build, and automated RPG conversion to Free Form.
    • How non-IBM i developers can now contribute to IBM i projects without prior knowledge of its specifics, while ensuring full control over their changes.

    The future of IBM i development is here. Let ARCAD be your guide!

    Register now!

    Share this:

    • Reddit
    • Facebook
    • LinkedIn
    • Twitter
    • Email

    UPDATED: Content Manager OnDemand for i Lives On! IBM Issues More POODLE Patches, Warns Not to Use SSLv3

    Leave a Reply Cancel reply

Volume 24, Number 41 -- December 8, 2014
THIS ISSUE SPONSORED BY:

Focal Point Solutions Group
ARCAD Software
Cilasoft
Manta Technologies
WorksRight Software

Table of Contents

  • Entry Power8 Systems Get Express Pricing, Fat Memory
  • 2014: The IBM i Year That Was
  • Critical Times, Critical Skills
  • Mad Dog 21/21: It’s The Apps, Stupid
  • As I See It: The Path Forward
  • Happy Holidays From All Of Us
  • Changes Ahead For IT Jungle In 2015
  • Big Blue And ITG Build Case For IBM i Resiliency
  • How Does Three Percent Sound?
  • IBM Pulls The Plug On Old Peripherals

Content archive

  • The Four Hundred
  • Four Hundred Stuff
  • Four Hundred Guru

Recent Posts

  • IBM Unveils Manzan, A New Open Source Event Monitor For IBM i
  • Say Goodbye To Downtime: Update Your Database Without Taking Your Business Offline
  • i-Rays Brings Observability To IBM i Performance Problems
  • Another Non-TR “Technology Refresh” Happens With IBM i TR6
  • IBM i PTF Guide, Volume 27, Number 18
  • Will The Turbulent Economy Downdraft IBM Systems Or Lift It?
  • How IBM Improved The Database With IBM i 7.6
  • Rocket Celebrates 35th Anniversary As Private Equity Owner Ponders Sale
  • 50 Acres And A Humanoid Robot With An AI Avatar
  • IBM i PTF Guide, Volume 27, Number 17

Subscribe

To get news from IT Jungle sent to your inbox every week, subscribe to our newsletter.

Pages

  • About Us
  • Contact
  • Contributors
  • Four Hundred Monitor
  • IBM i PTF Guide
  • Media Kit
  • Subscribe

Search

Copyright © 2025 IT Jungle