• The Four Hundred
  • Subscribe
  • Media Kit
  • Contributors
  • About Us
  • Contact
Menu
  • The Four Hundred
  • Subscribe
  • Media Kit
  • Contributors
  • About Us
  • Contact
  • IBM RackSwitch 10 GE Switch Does Cheaper Copper Wiring

    February 13, 2012 Timothy Prickett Morgan

    The first 10 Gigabit Ethernet switches came out in 2002, and for many years they were just the high-speed backbones that service providers and network operators installed as trunk lines between gear. But here we are a decade later, and 2012 is expected to be a transition year for 10 GE networking, where ports first start appearing on system boards and switches get cheap enough for 10 GE gear to go mainstream.

    The only problem, however, is that even as switches and server ports get cheaper, and the benefits of running converged server and storage traffic over a 10 GE backbone becomes apparent to everyone, the SFP+ and QSFP+ cables required for 10 GE and faster switches are cumbersome and expensive. They aren’t like the relatively–and I said relatively here–cheap copper cables we have strung around the office. But this year, that will be changing with the advent of 10GBASE-T ports, which support standard Category 6 and 5 cables used for Gigabit Ethernet. So now, if your LAN cables were reasonably well made, you can crank up your switch speed by a factor of 10 and not have to rewire your shop.

    If you feel the need for speed, then IBM, which has been in the networking business for real for more than a year now, has a rack switch for you. The RackSwitch G8264T, to be precise. This is a variant of the existing G8264 series of rack switches, which offer 1.28 Tbit/sec of non-blocking switch throughput and that can handle 960 million packets per second. And like the other G8264 switches, this one has 48 ports running at 10 GE speeds and four more ports (usually reserved for uplinks, but not always) running at 40 GE speeds. However, the new RackSwitch G8264T has 10GBase-T ports for those 48 10 GE ports instead of the SFP+ ports in the prior G8264 machines; the four 40 GE uplinks remain with the same QSFP+ ports and have the same four-way splitter cables that can convert each port to four 10 GE SFP+ ports if you want to push the box to 64 ports.

    The G8264T will be available on April 23. Pricing has not yet been divulged.

    RELATED STORIES

    IBM Launches 40 Gigabit Ethernet Rack Switch

    IBM Wheels And Deals On 10 Gigabit BNT Switches

    IBM Cuts BNT Switch Tags, Adds Fibre Channel SAN Switches

    IBM Has A Fire Sale on BNT Rack Switches

    IBM Buys Blade Network to Control Ethernet Switches

    IBM Cuts Deals on Selected Network Switches



                         Post this story to del.icio.us
                   Post this story to Digg
        Post this story to Slashdot

    Share this:

    • Reddit
    • Facebook
    • LinkedIn
    • Twitter
    • Email

    Tags:

    Sponsored by
    VISUAL LANSA 16 WEBINAR

    Trying to balance stability and agility in your IBM i environment?

    Join this webinar and explore Visual LANSA 16 – our enhanced professional low-code platform designed to help organizations running on IBM i evolve seamlessly for what’s next.

    🎙️VISUAL LANSA 16 WEBINAR

    Break Monolithic IBM i Applications and Unlock New Value

    Explore modernization without rewriting. Decouple monolithic applications and extend their value through integration with modern services, web frameworks, and cloud technologies.

    🗓️ July 10, 2025

    ⏰ 9 AM – 10 AM CDT (4 PM to 5 PM CEST)

    See the webinar schedule in your time zone

    Register to join the webinar now

    What to Expect

    • Get to know Visual LANSA 16, its core features, latest enhancements, and use cases
    • Understand how you can transition to a MACH-aligned architecture to enable faster innovation
    • Discover native REST APIs, WebView2 support, cloud-ready Azure licensing, and more to help transform and scale your IBM i applications

    Read more about V16 here.

    Share this:

    • Reddit
    • Facebook
    • LinkedIn
    • Twitter
    • Email

    Admin Alert: QSECOFR Security Problems I Have Known Surround Tech Plays Matchmaker, Hooks Up .NET Screens with IBM i Apps

    Leave a Reply Cancel reply

Volume 21, Number 6 -- February 13, 2012
THIS ISSUE SPONSORED BY:

ASNA
New Generation Software
Abacus Solutions
Linoma Software
WorksRight Software

Table of Contents

  • Big Blue To Bring Live Migration To IBM i 7.1
  • IBM Sunsets i5/OS V5R4 Again–For Real This Time
  • The Storage Cocktail Is Blended, Not Shaken
  • Mad Dog 21/21: The Codd Piece
  • Oracle Rejects Damages from SAP, Opts For TomorrowNow Retrial
  • Paul Schlieben: Founder, SoftLanding Systems, 1945-2012
  • Tech Spending Up 9 Percent In 2011, But Slowing In 2012
  • IBM Tweaks Power Systems Rebate Deals Once Again
  • IBM RackSwitch 10 GE Switch Does Cheaper Copper Wiring
  • Peripherals I Want For IBM i Boxes: Cheap SATA SSDs

Content archive

  • The Four Hundred
  • Four Hundred Stuff
  • Four Hundred Guru

Recent Posts

  • Liam Allan Shares What’s Coming Next With Code For IBM i
  • From Stable To Scalable: Visual LANSA 16 Powers IBM i Growth – Launching July 8
  • VS Code Will Be The Heart Of The Modern IBM i Platform
  • The AS/400: A 37-Year-Old Dog That Loves To Learn New Tricks
  • IBM i PTF Guide, Volume 27, Number 25
  • Meet The Next Gen Of IBMers Helping To Build IBM i
  • Looks Like IBM Is Building A Linux-Like PASE For IBM i After All
  • Will Independent IBM i Clouds Survive PowerVS?
  • Now, IBM Is Jacking Up Hardware Maintenance Prices
  • IBM i PTF Guide, Volume 27, Number 24

Subscribe

To get news from IT Jungle sent to your inbox every week, subscribe to our newsletter.

Pages

  • About Us
  • Contact
  • Contributors
  • Four Hundred Monitor
  • IBM i PTF Guide
  • Media Kit
  • Subscribe

Search

Copyright © 2025 IT Jungle