• The Four Hundred
  • Subscribe
  • Media Kit
  • Contributors
  • About Us
  • Contact
Menu
  • The Four Hundred
  • Subscribe
  • Media Kit
  • Contributors
  • About Us
  • Contact
  • Reader Feedback On Those 720+ and 740+ Boxes Are Gonna Cost Ya

    March 11, 2013 Hey, TPM

    The thing about the four-core processors in the 710+ and 720+ is that they are P05 software group machines. To keep them “small” IBM has fixed them so that they don’t support ANY external disk apart from SAN-attach and no external I/O towers either. This is clearly deliberate because–as we both know–most customers with a traditional IBM i workload don’t need more than four cores but they surely do need more disk space than you can squeeze into a single system chassis and more performance, too. Unless you go to SSDs, of course. 🙂

    And there’s another kick in the teeth. There’s no hot-swap I/O in the 7XX system chassis. They have a power interlock on the lid so you can’t pull a card without downtime (although you might be able to change a fan). That isn’t going to be acceptable to most customers, so they will want an external I/O tower just for that feature. That pushes them into the P10 band straight away.

    We’ve been here before, of course, and at least this time IBM is seeing the threat from the Intel boxes and pricing its “smallest” servers to compete directly. Sadly they are competing with systems that do expand to some extent (especially System x servers) and possibly have more memory, too.

    But I am seeing successful systems being sold now with SAN storage just because they stay in the P05 tier and, with software licensing costs on ERP packages the way they are, that justifies quite a lot of pain in terms of restricted I/O in other areas. The resilience has to come through PowerHA or some other HA software, though.

    Keep up the good work!

    –Richard

    Hey, TPM:

    Referencing the recent article, you forget one important aspect:

    Use of external storage, that is Storwize V3700, to a P05 system. A Power 720 can have maximum of 64 GB, but a Power 710 can have 256 GB of memory. This is ideal for partitioning, except that on a Power7+ machine where we can have 256 GB, IBM gives a partner just 9 percent in base discount, and on the old Power7, where we can have maximum of 128 GB, there we get the normal 38 percent in base discount. P05 systems are ideal for external storage because of then we don’t have the limit of eight internal disks, and price of IBM i is 20 percent of the cost on a P10 system.

    –Frank

    Thanks for the insight, gentlemen, and you ladies pipe up, too. Keep the input coming and we can help each other sort out the best bang for the buck in the new Power7+ lineup.

    –TPM

    RELATED STORY

    Entry Power7+ Servers: Those 720+ and 740+ Boxes Are Gonna Cost Ya



                         Post this story to del.icio.us
                   Post this story to Digg
        Post this story to Slashdot

    Share this:

    • Share on Reddit (Opens in new window) Reddit
    • Share on Facebook (Opens in new window) Facebook
    • Share on LinkedIn (Opens in new window) LinkedIn
    • Share on X (Opens in new window) X
    • Email a link to a friend (Opens in new window) Email

    Tags:

    Sponsored by
    Lightedge

    Your IBM Power Cloud Strategy Should Start With “Why?”

    Moving IBM i to the cloud isn’t just an infrastructure decision.

    A hardware refresh, data center exit, IBM i skills gap, disaster recovery requirement, or broader cloud initiative can each lead to a very different architecture.

    At Lightedge, we start by understanding what you’re trying to accomplish. Then we look at the workload, application dependencies, resiliency requirements, operating model, and long-term strategy to determine where that workload belongs.

    Managed IBM Power cloud? IBM Power Virtual Server? DR in the cloud? A hybrid architecture connecting IBM Power with AWS or Azure?

    There isn’t one right answer for every IBM i environment.

    Start with the business requirement. Understand the workload. Then decide where it belongs.

    Explore IBM Power cloud, managed services, and hybrid solutions from Lightedge.

    Share this:

    • Share on Reddit (Opens in new window) Reddit
    • Share on Facebook (Opens in new window) Facebook
    • Share on LinkedIn (Opens in new window) LinkedIn
    • Share on X (Opens in new window) X
    • Email a link to a friend (Opens in new window) Email

    H-1B Visas Are No Solution To IT Skills Shortage Oracle Revamps Its Database Appliance Server For Midrange Shops

    Leave a ReplyCancel reply

Volume 23, Number 10 -- March 11, 2013
THIS ISSUE SPONSORED BY:

Bug Busters Software Engineering
BCD
ASNA
Computer Keyes
RJS Software Systems

Table of Contents

  • Entry Power7+ Servers: Counting The Costs Of CPUs, IBM i, And SWMA
  • If COBOL Is Too ‘Un-Cool’ For School, What’s That Make RPG?
  • Server Manufacturing Moved Out Of Rochester, Minnesota
  • As I See It: Darwin vs. Zuckerberg
  • H-1B Visas Are No Solution To IT Skills Shortage
  • Reader Feedback On Those 720+ and 740+ Boxes Are Gonna Cost Ya
  • Oracle Revamps Its Database Appliance Server For Midrange Shops
  • Northeast User Groups Add iBelieve To Conference Format
  • IBM Picks OpenStack To Control Future SmartClouds
  • Enterprise IT Spending In The States To Improve In The Second Half

Content archive

  • The Four Hundred
  • Four Hundred Stuff
  • Four Hundred Guru

Recent Posts

  • Will Power Chips Get A Converged Arm Instruction Set Like Z Mainframe CPUs?
  • Thinking About Moving IBM i To The Cloud? Don’t Start With The Quote
  • Precisely To Add Ransomware Protection In MIMIX 11
  • It’s D-Day For Cybersecurity, AI Firms Warn
  • IBM i PTF Guide, Volume 28, Number 30
  • Oracle Dips A Toe Into IBM’s EBCDIC World
  • When Your Small IBM i Team Is Really A Team Of One
  • Guru: Putting Failure Handling In Its Place
  • Inside The Security Enhancements In ACS
  • IBM i PTF Guide, Volume 28, Number 28: A Crazy Number of Security Vulnerability Patches

Subscribe

To get news from IT Jungle sent to your inbox every week, subscribe to our newsletter.

Pages

  • About Us
  • Contact
  • Contributors
  • Four Hundred Monitor
  • IBM i PTF Guide
  • Media Kit
  • Subscribe

Search

Copyright © 2025 IT Jungle