• The Four Hundred
  • Subscribe
  • Media Kit
  • Contributors
  • About Us
  • Contact
Menu
  • The Four Hundred
  • Subscribe
  • Media Kit
  • Contributors
  • About Us
  • Contact
  • Reader Feedback On Those 720+ and 740+ Boxes Are Gonna Cost Ya

    March 11, 2013 Hey, TPM

    The thing about the four-core processors in the 710+ and 720+ is that they are P05 software group machines. To keep them “small” IBM has fixed them so that they don’t support ANY external disk apart from SAN-attach and no external I/O towers either. This is clearly deliberate because–as we both know–most customers with a traditional IBM i workload don’t need more than four cores but they surely do need more disk space than you can squeeze into a single system chassis and more performance, too. Unless you go to SSDs, of course. 🙂

    And there’s another kick in the teeth. There’s no hot-swap I/O in the 7XX system chassis. They have a power interlock on the lid so you can’t pull a card without downtime (although you might be able to change a fan). That isn’t going to be acceptable to most customers, so they will want an external I/O tower just for that feature. That pushes them into the P10 band straight away.

    We’ve been here before, of course, and at least this time IBM is seeing the threat from the Intel boxes and pricing its “smallest” servers to compete directly. Sadly they are competing with systems that do expand to some extent (especially System x servers) and possibly have more memory, too.

    But I am seeing successful systems being sold now with SAN storage just because they stay in the P05 tier and, with software licensing costs on ERP packages the way they are, that justifies quite a lot of pain in terms of restricted I/O in other areas. The resilience has to come through PowerHA or some other HA software, though.

    Keep up the good work!

    –Richard

    Hey, TPM:

    Referencing the recent article, you forget one important aspect:

    Use of external storage, that is Storwize V3700, to a P05 system. A Power 720 can have maximum of 64 GB, but a Power 710 can have 256 GB of memory. This is ideal for partitioning, except that on a Power7+ machine where we can have 256 GB, IBM gives a partner just 9 percent in base discount, and on the old Power7, where we can have maximum of 128 GB, there we get the normal 38 percent in base discount. P05 systems are ideal for external storage because of then we don’t have the limit of eight internal disks, and price of IBM i is 20 percent of the cost on a P10 system.

    –Frank

    Thanks for the insight, gentlemen, and you ladies pipe up, too. Keep the input coming and we can help each other sort out the best bang for the buck in the new Power7+ lineup.

    –TPM

    RELATED STORY

    Entry Power7+ Servers: Those 720+ and 740+ Boxes Are Gonna Cost Ya



                         Post this story to del.icio.us
                   Post this story to Digg
        Post this story to Slashdot

    Share this:

    • Reddit
    • Facebook
    • LinkedIn
    • Twitter
    • Email

    Tags:

    Sponsored by
    Raz-Lee Security

    iSecurity Multi Factor Authentication (MFA) helps organizations meet compliance standards and improve the existing security environment on IBM i. It requires a user to verify his identity with two or more credentials.

    Key Features:

    • iSecurity provides Multi Factor Authentication as part of the user’s initial program
    • Works with every Authenticator App available in the Market.

    Contact us at https://www.razlee.com/isecurity-multi-factor-authentication/

    Share this:

    • Reddit
    • Facebook
    • LinkedIn
    • Twitter
    • Email

    Admin Alert: A Checklist For Moving Power i Partitions To A Different Location ABL Takes a Fresh Approach to Modernization with RolePlay

    Leave a Reply Cancel reply

Volume 23, Number 10 -- March 11, 2013
THIS ISSUE SPONSORED BY:

Bug Busters Software Engineering
BCD
ASNA
Computer Keyes
RJS Software Systems

Table of Contents

  • Entry Power7+ Servers: Counting The Costs Of CPUs, IBM i, And SWMA
  • If COBOL Is Too ‘Un-Cool’ For School, What’s That Make RPG?
  • Server Manufacturing Moved Out Of Rochester, Minnesota
  • As I See It: Darwin vs. Zuckerberg
  • H-1B Visas Are No Solution To IT Skills Shortage
  • Reader Feedback On Those 720+ and 740+ Boxes Are Gonna Cost Ya
  • Oracle Revamps Its Database Appliance Server For Midrange Shops
  • Northeast User Groups Add iBelieve To Conference Format
  • IBM Picks OpenStack To Control Future SmartClouds
  • Enterprise IT Spending In The States To Improve In The Second Half

Content archive

  • The Four Hundred
  • Four Hundred Stuff
  • Four Hundred Guru

Recent Posts

  • Fortra Issues 20th State of IBM i Security Report
  • FNTS Launches Managed Services for Power Servers in IBM Cloud
  • Total LTO Shipped Capacity Up Slightly in 2022
  • Four Hundred Monitor, May 24
  • Update On Critical Security Vulnerability In PowerVM
  • Critical Security Vulnerability In PowerVM Hypervisor
  • IBM Power: Hosted On-Premises Or In The Cloud?
  • Guru: Watch Out For This Pitfall When Working With Integer Columns
  • As I See It: Bob-the-Bot
  • IBM i PTF Guide, Volume 25, Number 21

Subscribe

To get news from IT Jungle sent to your inbox every week, subscribe to our newsletter.

Pages

  • About Us
  • Contact
  • Contributors
  • Four Hundred Monitor
  • IBM i PTF Guide
  • Media Kit
  • Subscribe

Search

Copyright © 2023 IT Jungle