• The Four Hundred
  • Subscribe
  • Media Kit
  • Contributors
  • About Us
  • Contact
Menu
  • The Four Hundred
  • Subscribe
  • Media Kit
  • Contributors
  • About Us
  • Contact
  • Admin Alert: Major And Minor IBM i Power System Upgrades

    July 10, 2013 Joe Hertvik

    When upgrading your current IBM i hardware, you may have more choices than you think. With the incredible capacity built into late model System i and Power systems, you may be able to perform a minor upgrade on existing hardware, rather than moving to the latest Power 7+ machines. Here are some tips on how you might be able to stretch your existing hardware rather than buying a new machine.

    What Can You Do?

    If you sized your current machine correctly, you may have more than enough excess capacity to stay with the existing hardware for a few more years. I have one client who bought an eight-core Power 7 720 machine in 2011 and only purchased five IBM i operating system licenses. They have three leftover cores that aren’t being used for production processing. Their lease runs out in 2014, but they may easily find that they don’t need to upgrade to a Power 7+ machine. In 2014, they can purchase one to three additional IBM i operating system licenses for their unused cores, which would significantly increase their CPW, possibly eliminating the need for a Power 7+ upgrade.

    This option could also be available for you.

    With the tremendous CPW included in IBM‘s Power hardware, you may be able to break the upgrade cycle by activating the unused capabilities on your existing machines. You may find that performing a minor upgrade on an existing machine is cheaper than upgrading your entire system or replacing your box with a forklift upgrade (box swap).

    What’s Involved In A Minor Upgrade?

    If you want to perform a minor upgrade by adding IBM i operating system licenses to unused cores instead of upgrading to new hardware, here are some items you need to think about.

    • Do you have unused processors that you can purchase IBM i operating system licenses for? This option is only available if you have unused processor capacity on your system.

    • How much will adding an IBM i operating system license cost? It’s cheaper to add operating system licenses to low-end machines such as P-10 Power 720 boxes, than it is to add OS licenses to high-end machines such as P-30 Power 770 boxes. For P-10 boxes, you can probably get an IBM i license for less than $20K with one year of maintenance. For P-30 boxes, that same IBM i license can cost you somewhere above $50K with one year of maintenance. Your hardware configuration matters.

    • Will you need to pay a processor activation fee in addition to the operating system license? On some of the mid-market machines such as the Power 7+ 720, all the processors are activated when the machine is shipped (although you have to buy operating system licenses to use them for IBM i processing). On the higher end machines, such as the Power 7+ 770s, all the processors may not be activated when they are shipped, and you may have to pay a fee to activate a processor before you can attach an IBM i operating system license to that processor. Again, size matters in how much you’ll pay.

    • How much additional disk space will you need? Depending on your disk usage, you may need to add more disk capacity if you’re planning on keeping the machine for a longer period of time.

    • Will you need more memory? You’ll want to run some performance analysis on your box to determine if you need to add more memory with your processor. That could be a sticking point for a minor upgrade, if your machine is already maxed out on memory and you need more. Also be aware that there may be pricing considerations in adding memory to larger Power systems such as the 770, than there are for smaller systems. Talk to your business partner to see the actual cost of adding memory.

    • How much will hardware and software maintenance cost you? This is the biggest sticking point for performing a minor upgrade for increasing machine longevity. Depending on how old your machine is and what P-group it belongs to, it could be fairly expensive to purchase additional hardware and software maintenance for your box. If you need additional maintenance, the key is to pay your maintenance on a quarterly basis so you don’t have to put out a lot of money up front for one to two years of maintenance and you can easily cancel your maintenance without having to ask for a refund. Check out this article for additional tips on contracting with IBM for getting extended maintenance on your Power i machine.

    • How much processing growth will occur over your expected life cycle? If you upgrade your existing machine, will it be enough to handle targeted growth for the next few years? If possible, get business growth projections to make sure you’ll have enough capacity when expected business spikes occur.

    Given these considerations, here’s how I’d approach deciding between replacing/upgrading your existing hardware to the latest Power systems and performing a minor upgrade on your existing machine.

    1. Determine your needs in terms of additional processing power (CPW), disk, memory, additional hardware features, and all the same items you would normally evaluate for any upgrade. This will be your target capacity. Use the list presented above as a guide, and add to the list, as needed.

    2. As best you can, determine the life cycle you want to operate your upgraded machine over. The life cycle is often limited by your expected lease term, which is usually less than 45 months. Once you get to the end of the lease, you have to make a decision on what to do with the machine (an artificially bounded life cycle). If you’re paying cash for your machine, you’ll be able to keep the machine for as long as it’s running and it can satisfy your processing needs (an unbounded life cycle). Also make sure to work with management to get realistic business growth assumptions over the target life cycle.

    3. Get a quote from your business partner on what it would take to upgrade your existing machine to the latest Power system hardware or to perform a box swap to migrate to new hardware. Size the new machine so that it will satisfy your processing needs over your anticipated life cycle.

    Be aware that with the increased capabilities of the new Power systems, you may even be able to downgrade your Power system from its current P-group (P10, P20, P30) to a lower P-group machine that provides the same amount of CPW as your existing box. This is especially true when you’re upgrading from a Power 6 or Power 6+ machine to a Power 7+ machine. You may find, for example, that a Power 7+ 720 machine with three processors offers more CPW than your current Power 6+ 550 machine with four processors. Your business partner may try to sell you on staying on the same machine level with the same number of processors, but don’t be afraid to think smaller. You may be able to get more CPW for less, and save money in the process.

    4. Get a second quote from your business partner on what it would take to add your target capacity to your existing Power system hardware. Determine what it will cost in terms of processor activations (if necessary), OS licenses, additional disk, additional memory, extended maintenance, etc. This may or may not be a feasible option, depending on your processing and life cycle needs and the age of your existing hardware. The key is to generate a second option that may be able to save you money. Even if you don’t perform a minor upgrade on your existing hardware, it’s valuable to understand why you need to move to the newest Power system machines.

    5. Analyze the two quotes and determine which one best meets your needs over your anticipated life cycle. Make your best decision based on business needs.

    What’s Your Technique?

    These are just a few ideas for how you can reduce your acquisition costs when upgrading your existing Power hardware. There are several other techniques that can also be explored. Feel free to email me at joe@joehertvik.com with any other ideas you may have for lowering your upgrade costs. I’m passionately interested in the IBM i and Power systems upgrade process and would love to compare notes.

    Follow Me On My Blog, On Twitter, And On LinkedIn

    Check out my blog at joehertvik.com, where I focus on computer administration and news (especially IBM i); vendor, marketing, and tech writing news and materials; and whatever else I come across.

    You can also follow me on Twitter @JoeHertvik and on LinkedIn.

    Joe Hertvik is the owner of Hertvik Business Services, a service company that provides written marketing content and presentation services for the computer industry, including white papers, case studies, and other marketing material. Email Joe for a free quote for any upcoming projects. He also runs a data center for two companies outside Chicago. Joe is a contributing editor for IT Jungle and has written the Admin Alert column since 2002.

    RELATED STORIES

    Getting Short-Term Maintenance For Your Power i Machine

    Admin Alert: Some Simple Ideas for Getting the Best System i Lease



                         Post this story to del.icio.us
                   Post this story to Digg
        Post this story to Slashdot

    Share this:

    • Reddit
    • Facebook
    • LinkedIn
    • Twitter
    • Email

    Tags:

    Sponsored by
    VISUAL LANSA 16 WEBINAR

    Trying to balance stability and agility in your IBM i environment?

    Join this webinar and explore Visual LANSA 16 – our enhanced professional low-code platform designed to help organizations running on IBM i evolve seamlessly for what’s next.

    🎙️VISUAL LANSA 16 WEBINAR

    Break Monolithic IBM i Applications and Unlock New Value

    Explore modernization without rewriting. Decouple monolithic applications and extend their value through integration with modern services, web frameworks, and cloud technologies.

    🗓️ July 10, 2025

    ⏰ 9 AM – 10 AM CDT (4 PM to 5 PM CEST)

    See the webinar schedule in your time zone

    Register to join the webinar now

    What to Expect

    • Get to know Visual LANSA 16, its core features, latest enhancements, and use cases
    • Understand how you can transition to a MACH-aligned architecture to enable faster innovation
    • Discover native REST APIs, WebView2 support, cloud-ready Azure licensing, and more to help transform and scale your IBM i applications

    Read more about V16 here.

    Share this:

    • Reddit
    • Facebook
    • LinkedIn
    • Twitter
    • Email

    Sponsored Links

    Linoma Software:  FREE Webinar: Conquer Compliance Requirements. July 18.
    Cybernetics:  Ditch the tape backup? Up to 4.3 TB/hr! Start saving now!
    Abacus Solutions:  Qualified IBM i users eligible for free pair of running shoes

    More IT Jungle Resources:

    System i PTF Guide: Weekly PTF Updates
    IBM i Events Calendar: National Conferences, Local Events, and Webinars
    Breaking News: News Hot Off The Press
    TPM @ The Reg: More News From ITJ EIC Timothy Prickett Morgan

    Enterprise App Store Approach to Spread for Mobile Apps, Study Says What Is IBM Going To Do With Its Systems Business?

    Leave a Reply Cancel reply

Volume 13, Number 13 -- July 10, 2013
THIS ISSUE SPONSORED BY:

WorksRight Software
PowerTech
American Top Tools

Table of Contents

  • Presenting Vertical Data Horizontally
  • First Normal Form On The Fly
  • Admin Alert: Major And Minor IBM i Power System Upgrades

Content archive

  • The Four Hundred
  • Four Hundred Stuff
  • Four Hundred Guru

Recent Posts

  • With Power11, Power Systems “Go To Eleven”
  • With Subscription Price, IBM i P20 And P30 Tiers Get Bigger Bundles
  • Izzi Buys CNX, Eyes Valence Port To System Z
  • IBM i Shops “Attacking” Security Concerns, Study Shows
  • IBM i PTF Guide, Volume 27, Number 26
  • Liam Allan Shares What’s Coming Next With Code For IBM i
  • From Stable To Scalable: Visual LANSA 16 Powers IBM i Growth – Launching July 8
  • VS Code Will Be The Heart Of The Modern IBM i Platform
  • The AS/400: A 37-Year-Old Dog That Loves To Learn New Tricks
  • IBM i PTF Guide, Volume 27, Number 25

Subscribe

To get news from IT Jungle sent to your inbox every week, subscribe to our newsletter.

Pages

  • About Us
  • Contact
  • Contributors
  • Four Hundred Monitor
  • IBM i PTF Guide
  • Media Kit
  • Subscribe

Search

Copyright © 2025 IT Jungle