• The Four Hundred
  • Subscribe
  • Media Kit
  • Contributors
  • About Us
  • Contact
Menu
  • The Four Hundred
  • Subscribe
  • Media Kit
  • Contributors
  • About Us
  • Contact
  • The Power8 Era Is Drawing To A Close

    October 15, 2018 Timothy Prickett Morgan

    They have had a good, long run, perhaps longer than anyone would have thought except that with Moore’s Law losing steam, the gap between processor generations is stretching out further and further. The entry Power8-based Power Systems machines – the ones that are most commonly used by IBM i shops – made their debut in April 2014. And now they are getting reading to make their exit.

    Big Blue likes to give customers a warning when things are ripped out of the product catalog, to its great credit, giving its channel partners and end users a chance to adjust – and also to nudge those customers who might be sitting on the fence waiting to do a deal. So in announcement letter 918-162 last week, IBM let the word out of the impending withdrawal of the entry Power8 machines that have been the workhorses of the line for nearly five years now.

    Here’s the deal. On February 28, 2019, the Power Systems S822, S822L, S824, and S824L two-socket machines will be withdrawn from marketing. On May 31, 2019, the Power Systems S812, S812L, and S814 single-socket machines will join them in the choir eternal. At the end of May, the RISC-to-RISC data migration feature, which allows companies to easily move data from their existing machines to these Power8 systems, will also be discontinued, and so will the IBM i Express Edition bundles for these machines for systems with 1, 4, or 6 cores activated. The Express Edition bundles give a modest discount off the system price and toss in a few extra goodies to sweeten the deal.

    IBM is obviously going to try to encourage customers to move to Power9 equivalents, but is giving those customers who, perhaps on older operating system releases that cannot easily move to Power9 with IBM i 7.2 or 7.3, a chance to get the older iron before it is no longer available directly from Big Blue. The Power8 machines will, of course, be available through the reseller channel, provided dealers decide to keep any inventory, and will also be available in the second-hand market (such as it is) as Power9 migrations let Power8 iron out into the wild. But it is definitely a sign that Power8 is winding down, and for good, and customers should think long and hard about where they want to be in the next couple of years – particularly those with Power5, Power5+, Power6, Power6+, and Power7 iron that is getting very long in the tooth indeed. The people we talk to say there isn’t a lot of Power6 and Power6+ machinery out there, at least not compared to Power5 and Power7 gear, and that the Power5+ and Power7+ machinery was also not as popular.

    If IBM wants to really move customers ahead, it would use some carrots as well as this stick. With so much old equipment out there, a sweet hardware deal with partners that can do lots of migrations might be in order to jump start the Power Systems business. IBM focuses too much on trying to build its HPC and AI cred with Power Systems and sometimes forgets that maybe two-thirds of the 120,000-strong IBM i base could be convinced to move ahead if the move was not so expensive and difficult. It is ten times easier to keep a customer than it is to get a new one. We are not saying IBM should not chase the HPC and AI business with Power9 and Power10 iron, but rather it needs to remember it has other ways to get Power Systems sales. Keeping IBM i and AIX customers happy and getting them current, we think, should be a top priority.

    RELATED STORIES

    The NUMA NUMA [Song] Tax

    Counting The Cost Of IBM i On Power9 Entry Systems

    Bang For The Buck On Power9 Entry Hardware

    The Performance Impact Of Spectre And Meltdown

    The Deal On Power9 Memory For Entry Servers

    Inside IBM’s Power S924 Power9 Entry System

    Drilling Down Into The New Power9 Entry Servers

    At Long Last, IBM i Finally Gets Power9

    IBM Preps Power9 “ZZ” Systems For Imminent Launch

    IBM Readies Mainstream Power9 Iron For Launch

    The AS/400 Lessons Come Back Around With Power9 Systems

    IBM Deal Prices Current Power8 Compute Like Future Power9

    Advice For The Power Systems Shop That Has To Buy Now

    Power9 Big Iron “Fleetwood/Mack” Rumors

    Talking Power9 With IBM Fellow Brad McCredie

    The Power Neine Conundrum

    IBM i And AIX Won’t Get Power9 Until 2018

    Share this:

    • Reddit
    • Facebook
    • LinkedIn
    • Twitter
    • Email

    Tags: Tags: AIX, IBM i, Power Systems, Power10, Power5, Power6, Power7, Power8, Power9

    Sponsored by
    OCEAN User Group

    OCEAN TechCon25 Online

    It’s an Exciting Time for IBM i !

    July 16 & 17, 2025 – ONLINE

    Two virtual days of learning, presented by an outstanding group of IBM’ers and IBM Champions, featuring leading-edge topics.

    FREE for OCEAN members!

    Register NOW!

    Annual (12-month) Individual OCEAN Memberships are $80 and a Corporate Membership is $250. A Corporate Membership would allow your entire company to have full access to the OCEAN website & video library and to attend OCEAN events at member rates. Act now because rates are increasing on August 1, 2025.

    Share this:

    • Reddit
    • Facebook
    • LinkedIn
    • Twitter
    • Email

    Infor Elaborates on Coleman, IBM i Strategy No Room For Cloudy Thinking When Moving To The Cloud

    Leave a Reply Cancel reply

TFH Volume: 28 Issue: 69

This Issue Sponsored By

  • ARCAD Software
  • Profound Logic Software
  • SEA
  • Manta Technologies
  • UCG Technologies

Table of Contents

  • New Open Source ERP Suite Written In ILE RPG
  • Sundry Power Systems Enhancements Round Out The Year
  • Guru: A More Efficient Way To Merge With SQL
  • No Room For Cloudy Thinking When Moving To The Cloud
  • The Power8 Era Is Drawing To A Close

Content archive

  • The Four Hundred
  • Four Hundred Stuff
  • Four Hundred Guru

Recent Posts

  • With Power11, Power Systems “Go To Eleven”
  • With Subscription Price, IBM i P20 And P30 Tiers Get Bigger Bundles
  • Izzi Buys CNX, Eyes Valence Port To System Z
  • IBM i Shops “Attacking” Security Concerns, Study Shows
  • IBM i PTF Guide, Volume 27, Number 26
  • Liam Allan Shares What’s Coming Next With Code For IBM i
  • From Stable To Scalable: Visual LANSA 16 Powers IBM i Growth – Launching July 8
  • VS Code Will Be The Heart Of The Modern IBM i Platform
  • The AS/400: A 37-Year-Old Dog That Loves To Learn New Tricks
  • IBM i PTF Guide, Volume 27, Number 25

Subscribe

To get news from IT Jungle sent to your inbox every week, subscribe to our newsletter.

Pages

  • About Us
  • Contact
  • Contributors
  • Four Hundred Monitor
  • IBM i PTF Guide
  • Media Kit
  • Subscribe

Search

Copyright © 2025 IT Jungle