• The Four Hundred
  • Subscribe
  • Media Kit
  • Contributors
  • About Us
  • Contact
Menu
  • The Four Hundred
  • Subscribe
  • Media Kit
  • Contributors
  • About Us
  • Contact
  • IBM i PTF Guide, Volume 23, Number 17

    April 28, 2021 Doug Bidwell

    You may recall last week, when we were in PTF Guide Download Heaven. As wonderful as it was to have so much to report to all of you, we do owe an apology for the typo on the Cume release levels. With so much happening in one week, it was a case of a little too much excitement and not enough attention to detail. Please accept our sincere regret for the error. Let’s solider ahead with this week with some security bulletins, as well as the regular rundown of PTF Groups by IBM i release level.

    Security Bulletin: OpenSSL for IBM i is affected by CVE-2021-3449 and CVE-2021-3450

    The issues can be fixed by applying a PTF to IBM i.

    • Release 7.1 – SI75994
    • Release 7.2, 7.3, & 7.4 – SI75995

    Security Bulletin: SMTP for IBM i is affected by CVE-2021-20501

    The issues can be fixed by applying a PTF to IBM i.

    • Release 7.4 – SI76106
    • Release 7.3 – SI75859
    • Release 7.2 – SI76105
    • Release 7.1 – SI76114

    Here is the rundown of PTF Groups by IBM i release level:

    PTF Groups 7.4

    • HIPER’s (High Impact/Pervasive)
    • Security
    • Backup Recovery Solutions
    • IBM HTTP Server for i
    • Content Manager OnDemand for i

    PTF Groups 7.3

    • HIPER’s (High Impact/Pervasive)
    • Security
    • Backup Recovery Solutions
    • IBM HTTP Server for i
    • Content Manager OnDemand for i

    PTF Groups 7.2

    • HIPER’s (High Impact/Pervasive)
    • Security
    • Backup Recovery Solutions
    • IBM HTTP Server for i
    • Content Manager OnDemand for i

    PTF Groups 7.1

    • HIPER’s (High Impact/Pervasive)
    • Security

    Also, we have a new (or updated) links this week:

    • NODEJS How to maintain multiple Node.js installation (versions) on the IBM i

    The Guide at a glance: There are no new defectives this week (04/24/21). Here is the defective PTF rundown, which is the last defective for each release:

                    Defect                    Defective               APAR     Fixing
    
                    Date                       PTF                                         PTF
    
                    --------     --------     -------       -------
    
    7.4          01/25/21 MF67843                              MA48860             MF67843              (when available)
    
                   
    
    7.3          01/25/21 MF67844                              MA48860             MF68319              (when available)
    
                                                    MF67591
    
    

    Be sure to access the link in the Guide for further details.

    Below is the usual archive of the IBM i PTF Guide to help you work through the PTFs in chronological order:

    April 24, 2021: Volume 23, Number 17

    April 17, 2021: Volume 23, Number 16

    April 10, 2021: Volume 23, Number 15

    April 3, 2021: Volume 23, Number 14

    March 27, 2021: Volume 23, Number 13

    March 20, 2021: Volume 23, Number 12

    March 13, 2021: Volume 23, Number 11

    March 6, 2021: Volume 23, Number 10

    February 27, 2021: Volume 23, Number 9

    February 20, 2021: Volume 23, Number 8

    February 13, 2021: Volume 23, Number 7

    February 6, 2021: Volume 23, Number 6

    January 31, 2021: Volume 23, Number 5

    January 23, 2021: Volume 23, Number 4

    January 16, 2021: Volume 23, Number 3

    January 9, 2021: Volume 23, Number 2

    January 2, 2021: Volume 23, Number 1

    December 26, 2020: Volume 22, Number 52

    December 19, 2020: Volume 22, Number 51

    December 12, 2020: Volume 22, Number 50

    December 5, 2020: Volume 22, Number 49

    November 28, 2020: Volume 22, Number 48

    November 20, 2020: Volume 22, Number 47

    November 14, 2020: Volume 22, Number 46

    November 7, 2020: Volume 22, Number 45

    October 31, 2020: Volume 22, Number 44

    October 24, 2020: Volume 22, Number 43

    October 17, 2020: Volume 22, Number 42

    October 10, 2020: Volume 22, Number 41

    October 3, 2020: Volume 22, Number 40

    September 26, 2020: Volume 22, Number 39

    September 19, 2020: Volume 22, Number 38

    September 12, 2020: Volume 22, Number 37

    September 5, 2020: Volume 22, Number 36

    August 29, 2020: Volume 22, Number 35

    August 22, 2020: Volume 22, Number 34

    August 15, 2020: Volume 22, Number 33

    August 9, 2020: Volume 22, Number 32

    August 1, 2020: Volume 22, Number 31

    July 25, 2020: Volume 22, Number 30

    July 18, 2020: Volume 22, Number 29

    July 11, 2020: Volume 22, Number 28

    July 4, 2020: Volume 22, Number 27

    June 27, 2020: Volume 22, Number 26

    June 20, 2020: Volume 22, Number 25

    June 13, 2020: Volume 22, Number 24

    June 6, 2020: Volume 22, Number 23

    May 30, 2020: Volume 22, Number 22

    May 23, 2020: Volume 22, Number 21

    May 16, 2020: Volume 22, Number 20

    May 9, 2020: Volume 22, Number 19

    May 2, 2020: Volume 22, Number 18

    April 25, 2020: Volume 22, Number 17

    April 18, 2020: Volume 22, Number 16

    April 11, 2020: Volume 22, Number 15

    April 4, 2020: Volume 22, Number 14

    March 30, 2020: Volume 22, Number 13

    March 23, 2020: Volume 22, Number 12

    March 14, 2020: Volume 22, Number 11

    March 7, 2020: Volume 22, Number 10

    February 29, 2020: Volume 22, Number 9

    February 22, 2020: Volume 22, Number 8

    February 15, 2020: Volume 22, Number 7

    February 8, 2020: Volume 22, Number 6

    February 2, 2020: Volume 22, Number 5

    January 25, 2020: Volume 22, Number 4

    January 18, 2020: Volume 22, Number 3

    January 11, 2020: Volume 22, Number 2

    January 4, 2020: Volume 22, Number 1

    December 28, 2019: Volume 21, Number 52

    December 21, 2019: Volume 21, Number 51

    December 14, 2019: Volume 21, Number 50

    December 7, 2019: Volume 21, Number 49

    November 30, 2019: Volume 21, Number 48

    November 23, 2019: Volume 21, Number 47

    November 16, 2019: Volume 21, Number 46

    November 10, 2019: Volume 21, Number 45

    November 2, 2019: Volume 21, Number 44

    October 26, 2019: Volume 21, Number 43

    October 19, 2019: Volume 21, Number 42

    October 12, 2019: Volume 21, Number 41

    October 5, 2019: Volume 21, Number 40

    September 28, 2019: Volume 21, Number 39

    September 21, 2019: Volume 21, Number 38

    September 14, 2019: Volume 21, Number 37

    September 7, 2019: Volume 21, Number 36

    August 31, 2019: Volume 21, Number 35

    August 24, 2019: Volume 21, Number 34

    August 19, 2019: Volume 21, Number 33

    August 10, 2019: Volume 21, Number 32

    August 3, 2019: Volume 21, Number 31

    July 27, 2019: Volume 21, Number 30

    July 20, 2019: Volume 21, Number 29

    July 13, 2019: Volume 21, Number 28

    June 29, 2019: Volume 21, Number 26

    June 22, 2019: Volume 21, Number 25

    June 15, 2019: Volume 21, Number 24

    June 8, 2019: Volume 21, Number 23

    June 1, 2019: Volume 21, Number 22

    May 25, 2019: Volume 21, Number 21

    May 18, 2019: Volume 21, Number 20

    May 11, 2019: Volume 21, Number 19

    May 4, 2019: Volume 21, Number 18

    April 27, 2019: Volume 21, Number 17

    April 20, 2019: Volume 21, Number 16

    Share this:

    • Reddit
    • Facebook
    • LinkedIn
    • Twitter
    • Email

    Tags:

    Sponsored by
    Maxava

    Migrate IBM i with Confidence

    Tired of costly and risky migrations? Maxava Migrate Live minimizes disruption with seamless transitions. Upgrading to Power10 or cloud hosted system, Maxava has you covered!

    Learn More

    Share this:

    • Reddit
    • Facebook
    • LinkedIn
    • Twitter
    • Email

    IBM Grows, Power Systems Slows Four Hundred Monitor, April 28

    Leave a Reply Cancel reply

TFH Volume: 31 Issue: 32

This Issue Sponsored By

  • Maxava
  • UCG Technologies
  • RPG & DB2 Summit
  • Profound Logic Software
  • IBM

Table of Contents

  • ILEditor2: Satisfying The Need For Development Speed
  • What’s New With BRMS, PowerHA, And Db2 Mirror
  • On Your iRadar: Super Smart Chatbots
  • Four Hundred Monitor, April 28
  • IBM i PTF Guide, Volume 23, Number 17

Content archive

  • The Four Hundred
  • Four Hundred Stuff
  • Four Hundred Guru

Recent Posts

  • POWERUp 2025 –Your Source For IBM i 7.6 Information
  • Maxava Consulting Services Does More Than HA/DR Project Management – A Lot More
  • Guru: Creating An SQL Stored Procedure That Returns A Result Set
  • As I See It: At Any Cost
  • IBM i PTF Guide, Volume 27, Number 19
  • IBM Unveils Manzan, A New Open Source Event Monitor For IBM i
  • Say Goodbye To Downtime: Update Your Database Without Taking Your Business Offline
  • i-Rays Brings Observability To IBM i Performance Problems
  • Another Non-TR “Technology Refresh” Happens With IBM i TR6
  • IBM i PTF Guide, Volume 27, Number 18

Subscribe

To get news from IT Jungle sent to your inbox every week, subscribe to our newsletter.

Pages

  • About Us
  • Contact
  • Contributors
  • Four Hundred Monitor
  • IBM i PTF Guide
  • Media Kit
  • Subscribe

Search

Copyright © 2025 IT Jungle