IBM Mainframes Jump, Power Systems Drop Ahead Of Power7+ Rollout
January 28, 2013 Timothy Prickett Morgan
If IBM could control the situation its way, it would probably never launch new Power Systems and System z mainframe systems anywhere even close to on the same cycle because keeping them spaced would allow its Systems and Technology Group to operate more like a multi-cylinder engine, running smoothly, rather than a pile driver, sometimes up and sometimes down. But managing chip designs and system rollouts is complex–being late is normal and being on time is unusual–and companies still think on annual cycles. I continue to believe that IBM intended to ship the Power7+ chips back in October 2011, which |