• The Four Hundred
  • Subscribe
  • Media Kit
  • Contributors
  • About Us
  • Contact
Menu
  • The Four Hundred
  • Subscribe
  • Media Kit
  • Contributors
  • About Us
  • Contact
  • Systems Software Stack Tweaked For Power Systems

    October 14, 2019 Timothy Prickett Morgan

    As part of the October Power Systems announcements, IBM has made some minor tweaks to the systems software stack that runs underneath IBM i, AIX, and Linux on its Power-based systems.

    In announcement letter 219-451, IBM reveals enhancements to its PowerVM server virtualization hypervisor, the PowerVC implementation of the OpenStack cloud controller (which presumably has a pretty short life now that IBM owns Red Hat), and its Virtual HMC (vHMC) hardware management console for Power iron.

    The details are a bit thin, but IBM has made improvements with PowerVM V3.1.1 so Live Partition Mobility live migration of logical partitions …

    Read more
  • IBM i 7.3 And 7.4 Get Their Autumn Tech Refreshes

    October 9, 2019 Timothy Prickett Morgan

    Big Blue is hosting its IBM Systems Technical University this week, and used the occasion to quietly launch the Technology Refreshes, or TRs as they are known, for IBM i releases 7.3 and 7.4. If you were running around the Venetian Hotel, you could probably stitch together the extent of the updates to the platform, and to be honest, we are still trying to get all of the details, which were not available as we went to press.

    We will tell you what we know now, and then circle back and drill down into the details as appropriate.

    First of …

    Read more
  • Power9 Prime Previews Future Power10 Memory Boost

    September 30, 2019 Timothy Prickett Morgan

    Customers who are deploying Linux on Power Systems iron from Big Blue are about to get a very substantial boost in memory bandwidth as IBM is getting ready to launch the Power9’ (that’s a prime symbol, not an apostrophe or a typo, after the 9) processor. As we previewed back in March 2018, the Power9’ chip will feature a substantially upgraded memory subsystem that has a new, faster SERDES signaling technology, normally used for various kinds of system and accelerator interconnect, that has been tweaked to support memory buffers and therefore DDR4 and future memories.

    There is no technical …

    Read more
  • VAI Keeps Rolling with ERP Update, Cloud and SaaS Sales

    September 25, 2019 Alex Woodie

    “Scintillating growth” may not be the best words to describe the market for IBM i-based ERP software these days. But don’t tell that to the folks at VAI, who continue to develop compelling ERP software and grow its installed base, particularly on the cloud and software as a service (SaaS).

    For decades, VAI has been one of the go-to ERP providers for midsize firms in manufacturing, distribution, retail, and services. Its IBM i-based suite of software, S2K Enterprise, is trusted by hundreds of companies around North America. While many of its competitors on the platform have folded or been snapped …

    Read more
  • You’ve Still Got Friends In High Places

    September 23, 2019 Timothy Prickett Morgan

    For the past 25 years, and across a total of 78 meetings over that time, the Large User Group, or LUG as it is known, has been helping Big Blue keep the AS/400 and IBM i platform on the right track for the very large enterprises that have the system as their platform for running the mission critical applications that are at the heart of the business. The LUG has put forward thousands of requirements to IBM – both things that the organization wants IBM to do and other things that it wants IBM to stop doing – and …

    Read more
  • Third Party Maintenance An Option As Power7 Goes EOL

    September 23, 2019 Alex Woodie

    Time is running out for IBM i shops with hardware support contracts for Power7 and Power7+ servers, which officially reach end of life (EOL) a week from today. For organizations that aren’t ready to migrate to newer Power8 or Power9 machines, there are third-party maintenance options that will let them keep running Power7 machines without abandoning the safety net.

    The September 30 EOL for Power7 hardware support not come as a surprise, as IBM has been talking about the event for two years. Big Blue has given its Power Systems customers plenty of time to upgrade from older systems, …

    Read more
  • IBM i 7.2 End Dates Revealed as Power7 Shutdown Looms

    September 18, 2019 Alex Woodie

    IBM surprised nobody last week when it announced that it will stop selling IBM i 7.2 next April and cease supporting the operating system a year later. The lead time should give IBM i shops plenty of runway to prepare their upgrade strategies and transition to newer versions of the operating system. A potentially more impactful deadline for those not paying close attention is the end of hardware support for Power7 boxes in less than two weeks.

    Last week’s announcement of end of sales and support for IBM i 7.2 and related software products was not unexpected. That’s because IBM …

    Read more
  • New System z15 Mainframe Takes The Heat Off Power Systems

    September 16, 2019 Timothy Prickett Morgan

    I don’t know if many of you work this way, but sometimes I have to say things out loud and follow that train of thought before I decide it is a good, bad, or neutral idea – or any of the different gradations in there and beyond these from absolutely wonderful on one end to improbable or worse yet impossible on the other end. It is a kind of branch prediction, and like modern processors for the past two decades, it is subject to Meltdown speculative execution vulnerabilities.

    (That right there was a nerd joke. I think. Maybe. . …

    Read more
  • Maxava Hits Multiple Targets With The Same HA Arrow

    September 16, 2019 Timothy Prickett Morgan

    Downtime is never a good thing for any business, except maybe for those who sell high availability clustering and disaster recovery software for a living. And to be honest, these companies explicitly want to keep the downtime and the recovery time to the smallest period as possible. The fear of downtime should be enough to motivate us all to replicate out systems.

    But sometimes, just having two systems in a high availability cluster is not enough. Some companies need belts with their suspenders, and maybe even a bunch of different belts because they really can’t be down. To that end, …

    Read more
  • What Open Sourcing Power’s ISA Means For IBM i Shops

    August 26, 2019 Timothy Prickett Morgan

    Due to a conflict with a prior engagement at the Hot Chips conference, where IBM unveiled some of the aspects of the impending Power9′ processor that will prototype some ideas about memory subsystems that will appear in the future Power10 chips, we were not able to attend the OpenPower Foundation’s developer summit in San Diego last week. But IBM kept us in the loop, and we were intrigued to learn that Big Blue was open sourcing the instruction set architecture, or ISA, of the Power processors.

    This step is perhaps an inevitable one, given Big Blue’s desire to make the …

    Read more

Previous Articles Next Articles

Content archive

  • The Four Hundred
  • Four Hundred Stuff
  • Four Hundred Guru

Recent Posts

  • With Power11, Power Systems “Go To Eleven”
  • With Subscription Price, IBM i P20 And P30 Tiers Get Bigger Bundles
  • Izzi Buys CNX, Eyes Valence Port To System Z
  • IBM i Shops “Attacking” Security Concerns, Study Shows
  • IBM i PTF Guide, Volume 27, Number 26
  • Liam Allan Shares What’s Coming Next With Code For IBM i
  • From Stable To Scalable: Visual LANSA 16 Powers IBM i Growth – Launching July 8
  • VS Code Will Be The Heart Of The Modern IBM i Platform
  • The AS/400: A 37-Year-Old Dog That Loves To Learn New Tricks
  • IBM i PTF Guide, Volume 27, Number 25

Subscribe

To get news from IT Jungle sent to your inbox every week, subscribe to our newsletter.

Pages

  • About Us
  • Contact
  • Contributors
  • Four Hundred Monitor
  • IBM i PTF Guide
  • Media Kit
  • Subscribe

Search

Copyright © 2025 IT Jungle