• The Four Hundred
  • Subscribe
  • Media Kit
  • Contributors
  • About Us
  • Contact
Menu
  • The Four Hundred
  • Subscribe
  • Media Kit
  • Contributors
  • About Us
  • Contact
  • Power Systems: The Feeds and Speeds

    May 5, 2008 Timothy Prickett Morgan

    This week, IBM begins shipping the new Power6-based Power 570 and Power 595 servers that support the i, AIX, and Linux operating systems. And Big Blue is in the process of ramping up sales of the entry Power 520, which started selling in AIX and Linux edition in late January and which started shipping in i Editions on April 18, and midrange Power 550 servers, which also shipped earlier this year in an AIX and Linux Edition and which will hit the streets in an i Edition on May 23.

    Of course, IBM is also shipping the JS12 and JS22 Power6-based blade servers, which can support the new i 6.1 operating system, formerly known as i5/OS V5R5 for a while and then i5/OS V6R1 when it was announced in January for shipment on March 21. The JS12 and JS22 blade servers require the Virtual I/O server to support i 6.1, and this requires a lot of steps according to the business partners I have talked to–steps that AS/400, iSeries, and System i shops are not used to. The Power6 blades do not support i5/OS V5R4, which came out with Power5+ iron, or even the tweaked version, V5R4M5, which was launched last year so IBM could get a Power6 570 machine out the door that could support RPG and COBOL workloads and run i5/OS and DB2 for i5/OS.

    The trouble is, not all of the information about these machines is in one place, despite the Power Systems merger. And I can tell you right now, not all the data is yet available to many end users, even if it is available to Arrow Electronics and Avnet, IBM’s two master server resellers, and is making its way into the hands of myriad downstream resellers who push OS/400, i5/OS, and now i platforms. This makes comparison shopping difficult, of course, and that is why you keep me around. I gather up and compile data because I think it is fun, but I also know what it is like to try to figure out if a server is a good deal or not and I know what it is like to try to run an IT organization–albeit one a heck of a lot smaller than yours–on a tight budget.

    To that end, I have been collecting all the information I can get my hands on about the Power Systems servers, and I have created a salient characteristics table for the new machines. I will be compiling more data to make comparisons to the prior several generations of OS/400 and i5/OS servers, and then I will go the extra few miles to compare the new i 6.1 operating system on the Power Systems machines to Windows, Unix, Linux, and mainframe alternatives.

    In the table showing the Power Systems iron, items shown in red italics are estimates made by myself in the absence of data. I will update this table as more information becomes available. For instance, Commercial Performance Workload (CPW) relative performance ratings are not available on the Power 595 box, but then again, with i 6.1 not being supported on this machine until September (very likely because IBM is still tuning the operating system and maybe still adding support for features such as Live Application Mobility and Live Partition Mobility, which work with AIX), I don’t expect to see CPW ratings officially until late in the summer when IBM can feel comfortable about saying how much performance this box has running RPG applications against the DB2 for i database.

    Because we are now all part of one, happy Power Systems family, I have included IBM’s Relative Performance (rPerf) benchmark ratings for AIX workloads in the table, too, and any other relevant benchmarks I can find that might help you make your plans to upgrade to a Power Systems box or stay in the prior System i line. My guess is that an awful lot of customers will be trying to stick with i5/OS V5R4M5 wherever possible to avoid the application conversion issues associated with i 6.1. With one exception, of course: customers who want to move to blade servers. These customers have no choice but to go to i 6.1, and because life doesn’t have enough irony already, the small and midrange customers who would be most eager to go to the blade form factor because it runs on 120-volt power in the BladeCenter S chassis are the ones who are least happy about making the jump from i5/OS V5R4 to i 6.1.

    A few things to bear in mind. First, the i Edition of the Power 520 and 550 machines max out at two and four Power6 cores, respectively, compared to a maximum of four or eight cores for the AIX and Linux Edition of these same machines. None of the boxes have any L3 cache memory on them, which just seems stupid, but IBM is clearly making use of Power6 chips with dud cache memories on in these boxes–and for sound economic reasons in terms of its chip business. Also, the 570-class machine starts out at two cores for the i Edition, but starts out at four cores for the AIX and Linux Edition.

    Finally, for customers who are considering the JS12 and JS22 blades, look very carefully at the memory-to-processor and I/O subsystem bandwidth of the raw iron. The blades have substantially less I/O and memory bandwidth than the equivalent i Edition of the Power 520 and Power 550 machines. And those bandwidth numbers are maximum theoretical bandwidth, not actual bandwidth once you throw the Virtual I/O Server on the blade in a partition and have i 6.1 talking to this I/O software translation and virtualization layer instead of directly to the I/O devices through i5/OS microcode. Be very cognizant of the relationship between CPW ratings and your own workloads and how I/O plays into those workloads. You have to be very careful to make sure if you move to the blade servers that you do not end up I/O bound.

    RELATED STORIES

    IBM Expands VIP to All Systems for Precision Sales

    It’s Official: Now We’re Power Systems and i for Business

    The 64-Core Power6-Based Power 595 Starts to Roll in May

    And Then There Was One: The New and Improved Power 570

    Power6 Chips Get i Support in New Entry and Blade Machines

    Entry System p Servers Get Power6 Chips, System i Boxes Await

    IBM Aims for Server Expansion in 2008, Including System i Reincarnation

    A New Year, A New IBM Systems and Technology Group

    IBM Creates New Power, SMB Server Divisions



                         Post this story to del.icio.us
                   Post this story to Digg
        Post this story to Slashdot

    Share this:

    • Reddit
    • Facebook
    • LinkedIn
    • Twitter
    • Email

    Tags: Tags: mtfh_rc, Volume 17, Number 18 -- May 5, 2008

    Sponsored by
    ARCAD Software

    Embrace VS Code for IBM i Development

    The IBM i development landscape is evolving with modern tools that enhance efficiency and collaboration. Ready to make the move to VS Code for IBM i?

    Join us for this webinar where we’ll showcase how VS Code can serve as a powerful editor for native IBM i code and explore the essential extensions that make it possible.

    In this session, you’ll discover:

    • How ARCAD’s integration with VS Code provides deep metadata insights, allowing developers to assess the impact of their changes upfront.
    • The role of Git in enabling seamless collaboration between developers using tools like SEU, RDi, and VS Code.
    • Powerful extensions for code quality, security, impact analysis, smart build, and automated RPG conversion to Free Form.
    • How non-IBM i developers can now contribute to IBM i projects without prior knowledge of its specifics, while ensuring full control over their changes.

    The future of IBM i development is here. Let ARCAD be your guide!

    Watch Now

    Share this:

    • Reddit
    • Facebook
    • LinkedIn
    • Twitter
    • Email

    PowerVM: The i Hypervisor Is Not Hidden Anymore GDCM Seeks to ‘Defrag’ the Data Center for Higher Efficiency

    Leave a Reply Cancel reply

TFH Volume: 17 Issue: 18

This Issue Sponsored By

    Table of Contents

    • IBM Previews “Blue Business” SMB System Sales Approach
    • Micro Focus to Acquire NetManage for $73.3 Million in Cash
    • Power Systems: The Feeds and Speeds
    • There’s No i in Future, But Is There a Future in i?
    • IBM Cuts CPU Prices on Power5 and Power5+ Servers
    • IT Managers Are Under Pressure to Cut Costs, Says IDC
    • Power 570 and 595 Servers to Get Hot Add and Repair for CPUs
    • SafeData Praises Vaulting with Recovery Services
    • SAP Profits Take a Whack as Business ByDesign Ramp Slowed
    • JDA Software Has Its Best First Quarter Ever

    Content archive

    • The Four Hundred
    • Four Hundred Stuff
    • Four Hundred Guru

    Recent Posts

    • Liam Allan Shares What’s Coming Next With Code For IBM i
    • From Stable To Scalable: Visual LANSA 16 Powers IBM i Growth – Launching July 8
    • VS Code Will Be The Heart Of The Modern IBM i Platform
    • The AS/400: A 37-Year-Old Dog That Loves To Learn New Tricks
    • IBM i PTF Guide, Volume 27, Number 25
    • Meet The Next Gen Of IBMers Helping To Build IBM i
    • Looks Like IBM Is Building A Linux-Like PASE For IBM i After All
    • Will Independent IBM i Clouds Survive PowerVS?
    • Now, IBM Is Jacking Up Hardware Maintenance Prices
    • IBM i PTF Guide, Volume 27, Number 24

    Subscribe

    To get news from IT Jungle sent to your inbox every week, subscribe to our newsletter.

    Pages

    • About Us
    • Contact
    • Contributors
    • Four Hundred Monitor
    • IBM i PTF Guide
    • Media Kit
    • Subscribe

    Search

    Copyright © 2025 IT Jungle