fhs
Volume 7, Number 14 -- April 10, 2007

Aldon Tackles Parallel Development Problems with LMi 7.5

Published: April 10, 2007

by Alex Woodie

It can be difficult to coordinate among teams of i5/OS developers working in parallel. Who has code segments checked out? How will their work be merged? What if there are conflicts? These are some of the issues that Aldon is addressing with the latest release of its i5/OS change management offering, Aldon Lifecycle Manager (System i Edition), or LMi version 7.5, which features a new graphical compare and merge utility, new automated conflict resolution capabilities, and better integration into Aldon's workflow tool.

In many cases, change management products such as Aldon's LMi are used so programming moves forward in an orderly fashion. By preventing one developer from checking out and starting work on a piece of code that another developer has already checked out and started to work on, change management tools can help insure that development progresses in a linear manner, and toes don't get unduly stepped on.

But not every shop has the luxury of linear development. When time is in short supply, development shops will sometimes put all available hands to work on a given project to get it done as fast as possible, says Daniel Magid, president of Aldon.

"Normally, you don't ever want two people to have the same thing at the same time. But in other situations, companies have to allow for that," he says. "For example, during a large development project, say changes to program X cause it to break in production. You have to do a fix. You can't wait."

Parallel development may also be required by i5/OS shops that make modifications to their packaged applications, Magid says. Programmers may need access to the same sets of objects as they're adding their modifications to a new release of their vendor's software package, while simultaneously performing required maintenance on the old version.

These situations can make for messy code and potentially lost work if they're not handled cleanly and objects get overwritten. For a long time, Aldon's LMi package included a green-screen compare and merge utility to help OS/400 and i5/OS shops keep a grip on parallel development projects. The utility would generate a lengthy report that included annotations in the margin to help the developers locate the lines that were inserted, changed, or deleted. Users could tab from one changed area to the next if they entered a search string, or just print out the changed portions.

But this technique was far from ideal. Aldon has improved upon it with the new graphical compare and merge facility with LMi version 7.5, the first new release of the product since 2005.

Aldon added the graphical interactive compare and merge utility so developers who are working in parallel development can see what's different between programs, Magid says. "They can now bring this up in a graphical interface with the two changes side by side, and if doing a merge, they can see them on another screen on the bottom."

Aldon previously offered the graphical compare and merge facility for the multi-platform version of Aldon Lifecycle Manager, and decided to offer it for its bread-and-butter System i product. "We had this for C++ and Java. Now we have the graphical capability for RPG and COBOL."

Aldon's new graphical compare and merge tool gives developers a clear view of the differences between two pieces of code, and how they can best be merged.

Despite the availability of graphical i5/OS development tools like WebSphere Development Studio Client (WDSc), Magid notes that most Aldon customers are still using the old green-screen interfaces, and he's not inclined to push them away from the green screen. "But when you want to do a compare and merge, that's actually a good place to have a graphical interface," Magid says. "Obviously the green-screen version is still available. You don't have to go completely over to graphical interface. But it allows you to use a graphical interface" where it makes sense, he says.

Also aiding parallel development in LMi 7.5 is the new conflict resolution facility, which is now available through the standard green-screen interface. With this feature, administrators and developers can quickly sort and identify version conflicts using status tags, such as active, pending, or cleared, speeding up parallel development.

"It's a whole new system for managing the parallel development process. This really is in response to developers saying 'how do you deal with multiple people working on the same thing at the same time?'" Magid says.

In previous releases of LMi, the software would inform the developer how many conflicts remained in the work, but not much else. "It would tell you there are 10 conflicts, but you wouldn't know if you're already looked at them. There was no way to keep track of them. 'Have I actually looked at it or I have done maintenance or finished with maintenance?'"

The feature is similar to the Table View feature in WDSc that allows developers to view outstanding conditions and clear conflicts, Magid says. "Now you can also see that same information from the green screen," he says. "You can see all that information from whichever interface you like better. We want to make this so the developer is as productive as possible."

The final major feature in LMi 7.5 is better integration with the Windows-based Aldon Community Manager software, which is used by administrators and IT managers to track incidents and by end-users to submit change requests and requirements.

In previous releases, managers could create tasks in Community Manager for programmers to complete, but there was no interface from LMi back to Community Manager. With LMi 7.5, Aldon has added a hyperlink to LMi's green-screen interface that automatically opens Aldon Community Manager in a Web browser, where programmers can update the status of their tasks.

LMi 7.5 is still in beta tests and should becomes generally available by the end of June. Pricing starts at $2,000 per user. For more information, see www.aldon.com.

RELATED STORIES

Aldon Gives Community Manager SLA Teeth

Aldon Adds Support for WDSc Lite

Aldon Introduces Database Change Management Solution

Aldon Supports iASPs with Change Management System



                     Post this story to del.icio.us
               Post this story to Digg
    Post this story to Slashdot


Sponsored By
PRODATA COMPUTER SERVICES

DBU - Burning Love!

DBU, the "original" database utility, inspires burning love!
With over 20,000 installs of DBU in 31 countries,
it is the leading database utility.

Being without DBU has been compared to
being naked in a crowd...you don't know
what to do or which way to go!

Enter the DBU Challenge for
your chance to win $1,000!

ProData Computer Services
800.228.6318
www.DoDBU.com


Editor: Alex Woodie
Contributing Editors: Dan Burger, Joe Hertvik,
Shannon O'Donnell, Timothy Prickett Morgan
Publisher and Advertising Director: Jenny Thomas
Advertising Sales Representative: Kim Reed
Contact the Editors: To contact anyone on the IT Jungle Team
Go to our contacts page and send us a message.

Sponsored Links

COMMON:  Join us at the 2007 conference, April 29 – May 3, in Anaheim, California
Vision Solutions:  The first new HA release from the newly merged Vision and iTera companies
LASERTEC USA:  Fully integrate MICR check printing with your existing application


IT Jungle Store Top Book Picks

The System i Pocket RPG & RPG IV Guide: List Price, $69.95
The iSeries Pocket Database Guide: List Price, $59.00
The iSeries Pocket Developers' Guide: List Price, $59.00
The iSeries Pocket SQL Guide: List Price, $59.00
The iSeries Pocket Query Guide: List Price, $49.00
The iSeries Pocket WebFacing Primer: List Price, $39.00
Migrating to WebSphere Express for iSeries: List Price, $49.00
iSeries Express Web Implementer's Guide: List Price, $59.00
Getting Started with WebSphere Development Studio for iSeries: List Price, $79.95
Getting Started With WebSphere Development Studio Client for iSeries: List Price, $89.00
Getting Started with WebSphere Express for iSeries: List Price, $49.00
WebFacing Application Design and Development Guide: List Price, $55.00
Can the AS/400 Survive IBM?: List Price, $49.00
The All-Everything Machine: List Price, $29.95
Chip Wars: List Price, $29.95

 

The Four Hundred
Hello, New York? Buy IBM

Security Still an Issue in 2007 for System i5 Shops

A Trained IT Staff Is A Happy and Competitive One

As I See It: The Legacy

The Linux Beacon
Intel Shows Off Future Penryn and Nehalem Chip Designs

Cornerstones Laid for the Linux Foundation

Gartner Says It Was "All Over" the Virtualization Effect

Revenue Up, But Profits Take a Hit at Red Hat in Q4

Big Iron
IBM Replies To Platform: No More Compatibles

Top Mainframe Stories From Around the Web

Chats, Webinars, Seminars, Shows, and Other Happenings

Four Hundred Guru
FTP Means 'First Try Pinging'

Improving Upon WDSC's Table View

Admin Alert: Graphically Moving i5/OS Objects with OpsNav

System i PTF Guide
March 31, 2007: Volume 9, Number 13

March 24, 2007: Volume 9, Number 12

March 17, 2007: Volume 9, Number 11

March 10, 2007: Volume 9, Number 10

March 3, 2007: Volume 9, Number 9

February 24, 2007: Volume 9, Number 8

The Windows Observer
Microsoft Loosens the Licensing Screws for Vista Virtualization

Microsoft Patches Animated Cursor Flaw in Windows

XenSource Extends and Improves Windows Support with 3.2 Release

Intel Shows Off Future Penryn and Nehalem Chip Designs

The Unix Guardian
Sun Boosts Performance of UltraSparc-IV+ Chips

Intel Shows Off Future Penryn and Nehalem Chip Designs

IBM Offers Rebates on System p5 and ISV Software Bundles

The X Factor: Virtualization Belongs in the System, Not in the Software

Four Hundred Monitor
Four Hundred Monitor's
Full iSeries Events Calendar

THIS ISSUE SPONSORED BY:

ProData Computer Services
Aldon
Maximum Availability
COMMON
Affirmative Computer



TABLE OF CONTENTS
Aldon Tackles Parallel Development Problems with LMi 7.5

Ricoh in Deal for AFP/IPDS Emulation

S4i Web Interfaces to Document Management Offering

CA Tweaks Job Schedulers, Positions Them as Workload Automation

News Briefs and Product Shorts:


No Run on BI Vendors, Info Builder's CEO Says . . . Jim Herring and Ian Jarman in 'Fireside Chat' Thursday . . . Kronos Unveils i5/OS-Based HR Solution for Casinos . . . LANSA Gains Entry into IBM SOA Program . . . ASNA Signs New European Reseller . . . Computer Makers Tout Ways to Reduce Carbon Dioxide Emissions, Save Money . . .

Four Hundred Stuff

BACK ISSUES





 
Subscription Information:
You can unsubscribe, change your email address, or sign up for any of IT Jungle's free e-newsletters through our Web site at http://www.itjungle.com/sub/subscribe.html.

Copyright © 1996-2008 Guild Companies, Inc. All Rights Reserved.
Guild Companies, Inc., 50 Park Terrace East, Suite 8F, New York, NY 10034

Privacy Statement