tfh
Volume 19, Number 6 -- February 8, 2010

The i/OS Roadmap Revealed--Sort Of

Published: February 8, 2010

by Timothy Prickett Morgan

There is an understandable amount of cynicism among the AS/400 faithful that IBM has neglected the OS/400 operating system, stealing all the best goodies from OS/400 and weaving them into AIX and then not adding some nifty features, such as live partition mobility for PowerVM, to i/OS, the modern instantiation of OS/400. Moreover, i/OS releases are anything but regular and Big Blue doesn't roll up dot releases like other operating system makers do.

On the former, I cannot report, I am sad to say, that much has changed. But I can tell you, based on internal IBM roadmaps that I have been able to get my hands on (thanks to the kindness of strangers, as always) that the latter is going to change. As best I can figure, IBM is going to put the i/OS operating system on a marched pace of innovation. Check out this roadmap, which I think dates from last November:

I think this roadmap was put together for key customers and business parts at about the same time that IBM tacked on an additional year of marketing and support to i5/OS V5R4. (See The i 7.1s Have It; i5/OS V5R4 Extended for more on that extension.) Basically, the move from i/OS V5RX to i 6.1 is too big of a jump for many shops, and IBM blinked. In doing so, support for all of IBM's then-current and future operating systems was pushed out another dozen months, as you can see here:

As you can see from the roadmap above, the Power 6.1.1 interim release, which I told you all about in this story last October, was characterized in the roadmap as a "Power7 Enablement" platform. As usual, the interim release was designed to run on the then-future hardware platform, just like i5/OS V5R4M1 was designed to run on Power6-based machines before they launched. This is IBM Rochester's way of doing a controlled beta test.

The i Next Release, as IBM has been calling it since last fall, is actually going to be called i 7.1, as I told you it would be last fall when Big Blue extended support for i5/OS V5R4 and i 6.1. And as you can see, this will be the operating system designed to fully exploit Power7 iron, just like i 6.1 fully exploited Power6 and Power6+ iron. The Power7-based machines announced today and shipping in February or March, depending on the model, will only support the interim i 6.1.1 release; however, the AIX 6.1 and the earlier AIX 5.3 release, which is roughly analogous with i5/OS V5R4 in terms of vintage, are both supported on the Power7 machinery. (Yes, IBM is trying to nudge i5/OS V5 shops forward, and yes, it has to be careful not to alienate AIX shops and hence the support for the older AIX 5.3. That's the difference between proprietary systems with one vendor and open systems with many competitors, people.)

The interesting bit about the updated i/OS roadmap is that IBM has four dot releases in store for the i 7.1 operating system, and spaced at regular, predictable intervals. I have never seen that before, and quite frankly, it is about time. Presumably IBM will be aggregating PTF patches and other system program updates for the i/OS software stack twice a year for customers who don't want to make a weekly habit out of applying PTFs, excepting security patches and bug fixes, of course. It would be good to have a dot release twice a year just to keep the word out there in the IT space that this operating system exists, that it is being updated, and that it runs on some of the best hardware ever designed.

While the roadmap may have lots of dots in it that connect into a pretty line, there was no information whatsoever about what features would be in those future dot releases. You can see the brief feature list for i 7.1 here.

The other key bit you can see from the i/OS roadmaps is that IBM has plans i 7.2 in early 2012, which I would guess is sometime around when the COMMON midrange trade show will be held. And I would guess that when Power8 processors come out sometime in 2013 or so, there will be an i 8.1 release then, too.

As far as I know, as I said two weeks ago, i 7.1 will be available in the third week of April, just ahead of this year's COMMON event in Orlando. This being software, and i 7.1 not being required to use the new Power7-based systems, that date could slip around a bit. The people I have spoken to who are familiar with IBM's plans did not know when IBM planned to announce i 7.1, only when it would be available.


RELATED STORIES

Looks Like i 7.1 Is Coming In April

Power Systems i: The Word From On High

Power Systems i: The Windows Conundrum

The i 7.1s Have It; i5/OS V5R4 Extended

IBM Rolls Up an i 6.1.1 Dot Release

The Curtain Rises a Bit on the Next i OS, Due in 2010

Start Planning for Power7 Iron Now

Power 7: Lots of Cores, Lots of Threads

i Roadmaps: Here Be Dragons

One Less Headache: IBM Preconfigures i 6.1 and VIOS on Blades

Look for an Interim i Release Next Year, and i 6.2 in Early 2010

The i Platform Roadmap Is a Work in Progress

So Where Is PureXML for DB2/400?



                     Post this story to del.icio.us
               Post this story to Digg
    Post this story to Slashdot


Sponsored By
POWERTECH

Did you know that a large percentage of systems are not
configured correctly for proper security? Is yours one of them?
Would you pass an compliance audit?

                      For the past six years, PowerTech has compiled audit data trends
                      from over 1,500 servers into the annual "State of System i Security" study.
                      Findings include:

                      · 73% of libraries have the Default Create Authority set to *CHANGE,
                      giving the average user change rights to newly created files.
                      · Half of all systems have more than 16 users with default passwords
                      that can be easily determined by any attacker.
                      · 27% of systems do not set an expiration time for passwords
                      --meaning that users are never forced to change their password.

Find out where you stand and how to close the gaps.

Get your FREE System i Compliance Assessment today!


Editor: Timothy Prickett Morgan
Contributing Editors: Dan Burger, Joe Hertvik, Brian Kelly, Shannon O'Donnell,
Mary Lou Roberts, Victor Rozek, Kevin Vandever, Hesh Wiener, Alex Woodie
Publisher and Advertising Director: Jenny Thomas
Advertising Sales Representative: Kim Reed
Contact the Editors: To contact anyone on the IT Jungle Team
Go to our contacts page and send us a message.

Sponsored Links

SEQUEL Software:  SEQUEL is fast, efficient & cost-effective data analysis
DRV Technologies:  SpoolFlex automatically converts reports to user friendly PC formats - FREE trial!
COMMON:  Join us at the annual 2010 conference, May 3 - 6, in Orlando, Florida

 

 

IT Jungle Store Top Book Picks

Easy Steps to Internet Programming for AS/400, iSeries, and System i: List Price, $49.95
The iSeries Express Web Implementer's Guide: List Price, $49.95
The System i RPG & RPG IV Tutorial and Lab Exercises: List Price, $59.95
The System i Pocket RPG & RPG IV Guide: List Price, $69.95
The iSeries Pocket Database Guide: List Price, $59.00
The iSeries Pocket SQL Guide: List Price, $59.00
The iSeries Pocket Query Guide: List Price, $49.00
The iSeries Pocket WebFacing Primer: List Price, $39.00
Migrating to WebSphere Express for iSeries: List Price, $49.00
Getting Started With WebSphere Development Studio Client for iSeries: List Price, $89.00
Getting Started with WebSphere Express for iSeries: List Price, $49.00
Can the AS/400 Survive IBM?: List Price, $49.00
Chip Wars: List Price, $29.95


 
Four Hundred Stuff
Island Pacific Rediscovers i/OS Roots with Retail Apps

From Passwords to MFT, Cyber-Ark Has a Vault for That

Utilities Department Gains Workflow Efficiencies from S4i Systems

m-Power Gets New Interactive Reporting Templates

VAI Shows Confidence in 2010 with New Hires

Four Hundred Guru
What a Lifelong DB2 Fanatic Sees in MySQL

Read a Save File

Admin Alert: Did You Lose ECS on February 1?

Four Hundred Monitor
Four Hundred Monitor's
Full iSeries Events Calendar

System i PTF Guide
January 30, 2010: Volume 12, Number 05

January 23, 2010: Volume 12, Number 04

January 16, 2010: Volume 12, Number 03

January 9, 2010: Volume 12, Number 02

January 2, 2010: Volume 12, Number 01

December 26, 2009: Volume 11, Number 52

TPM at The Register
Reg HPC CommunityEuropean Commission pays IDC to take a hard look at HPC

US economy sheds 20,000 jobs in January

Cisco's California sales on the double

Big iron bolsters Q4 at Unisys

TPC adds power suckage to benchmarks

Intel sneak peeks Westmere EP server silicon

Unisys lands $187m Pentagon mainframe deal

Makara's do-it-yourself platform cloud

SGI biz still kinda lumpy

Intel set for server chip blitz

Super Micro grows like crazy in fiscal Q3

HP trots out 0% financing (again)

THIS ISSUE SPONSORED BY:

ProData Computer Services
PowerTech
RevSoft
DRV Technologies
WorksRight Software


Printer Friendly Version


TABLE OF CONTENTS
The Power7 Rollout Begins In The Middle

The i/OS Roadmap Revealed--Sort Of

The System iWant, 2010 Edition: Blade and Cookie Sheet Boxes

As I See It: Blurred Vision

IBM Goes Live with 'Software Value Plus' Program for Partners

But Wait, There's More:

Star-Studded Northeast User Conference Set for April . . . Social Networking and Business: A Rocky Relationship . . . Brace Yourself For A Bevy Of Server Chip Announcements . . . OS/400: Is It IBM i, i OS, i 6.X, i/OS, Or What? . . . TPC Benchmarks Track Energy Usage Now, Too . . .

The Four Hundred

BACK ISSUES




 
Subscription Information:
You can unsubscribe, change your email address, or sign up for any of IT Jungle's free e-newsletters through our Web site at http://www.itjungle.com/sub/subscribe.html.

Copyright © 1996-2010 Guild Companies, Inc. All Rights Reserved.
Guild Companies, Inc., 50 Park Terrace East, Suite 8F, New York, NY 10034

Privacy Statement