tfh
Volume 17, Number 34 -- September 8, 2008

Expanded Power Systems i Boxes on the Horizon?

Published: September 8, 2008

by Timothy Prickett Morgan

It has been a quiet summer in Lake Woebegone, er, rather Rochester, Minnesota, and its Silver Lake. The run from late June through September is traditionally a quiet one, with a few nips and tucks here and there in the Power Systems lineup. But as we all know from reading The Four Hundred, IBM still has a little unfinished Power Systems business for 2008. And the word on the street is that some tweaked gear might be coming down the pike any day now.

Heaven only knows if what I am hearing is true, because Big Blue doesn't usually confirm or deny such rumors. But what I am hearing--and also what I expect in addition to what I am hearing--certainly sounds plausible.

First, the rumors. I am hearing from sources who are hearing from their resellers and their sources within IBM that the Power 550 midrange box and the Power 570 enterprise-class box are set to be expanded with more processing capacity. Specifically, I hear that IBM is going to double up the processor core count on the Power 550 to eight Power6 cores and double up the Power 570 to 32 cores.

It is unclear if IBM might use twice as many processor sockets to accomplish this expansion, or if it is moving to dual-chip modules that would package two dual-core Power6 chips in a single package and have them share a single socket. IBM has put two dual-core chips inside Power5 and Power5+ machines for its supercomputing customers, where sometimes thermal issues and core counts matter more than the peak processing capacity of a single core. Such dual-chip modules usually mean stepping the clock speed back a bit--perhaps down to 3 GHz in the Power6 family of processors from the 5 GHz top-end speed--but the resulting reduction in speed and the doubling of cores results in a net increase in processing capacity within the same thermal envelope or lower. This approach allows IBM to pack more cores into a smaller space, and this has certainly been important in the supercomputing space. In the past, when IBM was doing this for supercomputers and as well as to make its AIX-based System p boxes competitive with dual-core X64 boxes running any kind of workloads, the System i top brass told me that this doubling up of chips in a socket did not work well for System i workloads because of L2 cache and L3 cache issues. (IBM sometimes cut back on the cache to make these chip modules.) Whether or not this could still be the case with Power6 chips is unclear.

The question you really have to ask is why IBM might do this at all? It may be that customers putting in lots of cores in the Power 570 class don't want to have multiple chasses to get those cores, so they want IBM to deliver a beefier Power 550 box. The same would hold true for customers who might want the processing capacity of an entry Power 595 box, but they don't want to change to the larger rack style of the Power 595 or pay a premium for the 64-core expansion in the high-end box. And, of course, it always comes back to software tiers. Customers might be pressuring IBM to get more oomph into these software tiers.

I said might. The information I have right now is pretty thin. So don't bet your budget on this. But do call IBM if you are acquiring a Power 550 or Power 570 and get them to spill. (And then, you can send me an email if you are feeling generous to your fellow readers.)

What I do know for sure, which I already told you about earlier this year, is that IBM is expected to really converge the Power Systems lineup in the September or October timeframe, eliminating the i Edition and AIX and Linux Edition distinctions that have prevailed since the spring, when the i platform moved to Power6 iron. IBM's plans, of course, change.

What I also know is that Power 520 machines are restricted to two cores now in the i Editions, while the AIX and Linux Editions have four cores, and the Power 550 i Edition is restricted to four cores while the AIX and Linux Editions have eight. I think you can see where this is going. IBM is probably just going to have a new set of integrated product numbers and feature codes for Power Systems, with no edition, and turn all the cores on for the i5/OS V5R4 and i 6.1 operating systems. Which, if you will recall, I suggested IBM do last spring. But, had Big Blue done that, it might have put a crimp in Power 570 sales, particularly when you consider that the Power 550 is in the P20 software tier and an eight-core Power 570 is in the P30 tier and that some prior generations of Power5 and Power5+ 570-class machines are in the P40 and P50 tiers. IBM would have seen a whole lot of push-pull system replacements in the past six months it if had made the AIX and i boxes the same in core count. IBM really needed that i platform revenue in the past six months to help make up for a slowing AIX business. Hence, this two-step strategy toward real convergence.

I don't have high confidence that the Power 570 will see its processor core count doubled, but if IBM does it, this will be an interesting development.


RELATED STORIES

Various System i and Power Systems i Nips and Tucks

Power Systems Memory Prices Slashed to Promote Virtualization

Virtualization Adoption Skyrockets on Power Systems Iron

Sundry July Power Systems Announcements

IBM Rejiggers Development Tools on Entry Power 520 i Editions

IBM Offers Modest Discounts on i 525 and M25 Entry Boxes

More Power Transitions Are on the Way

Power Systems: The Feeds and Speeds

PowerVM: The i Hypervisor Is Not Hidden Anymore

The 64-Core Power6-Based Power 595 Starts to Roll in May

And Then There Was One: The New and Improved Power 570

Power6 Chips Get i Support in New Entry and Blade Machines

Entry System p Servers Get Power6 Chips, System i Boxes Await



                     Post this story to del.icio.us
               Post this story to Digg
    Post this story to Slashdot


Sponsored By
BYTWARE

Strike Back Against Security Risks

Sometimes security breaches come from
where you least expect them; and in the
latest MoshiMoshi, System i manager
Harold Stanley finds himself faced with an
unexpected security challenge.

Find out how he solves the problem and
how you can close the gaps in your security.
Plus, you can take Mr. Ono's Security Quiz
to win a free license of Bytware's
StandGuard Network Security
!

Enjoy the hit animated series today!
Learn about security and win great prizes!


Editor: Timothy Prickett Morgan
Contributing Editors: Dan Burger, Joe Hertvik, Brian Kelly, Shannon O'Donnell,
Mary Lou Roberts, Victor Rozek, Kevin Vandever, Hesh Wiener, Alex Woodie
Publisher and Advertising Director: Jenny Thomas
Advertising Sales Representative: Kim Reed
Contact the Editors: To contact anyone on the IT Jungle Team
Go to our contacts page and send us a message.

Sponsored Links

ProData Computer Services:  Access remote databases from RPG, Webinar, Sept. 17, 2 p.m. CDT
MoshiMoshi:  Episode Three now showing! Watch and Win!
COMMON:  Join us at the Focus 2008 workshop conference, October 5 - 8, in San Francisco, California

 

 

IT Jungle Store Top Book Picks

Easy Steps to Internet Programming for AS/400, iSeries, and System i: List Price, $49.95
Getting Started with PHP for i5/OS: List Price, $59.95
The System i RPG & RPG IV Tutorial and Lab Exercises: List Price, $59.95
The System i Pocket RPG & RPG IV Guide: List Price, $69.95
The iSeries Pocket Database Guide: List Price, $59.00
The iSeries Pocket Developers' Guide: List Price, $59.00
The iSeries Pocket SQL Guide: List Price, $59.00
The iSeries Pocket Query Guide: List Price, $49.00
The iSeries Pocket WebFacing Primer: List Price, $39.00
Migrating to WebSphere Express for iSeries: List Price, $49.00
iSeries Express Web Implementer's Guide: List Price, $59.00
Getting Started with WebSphere Development Studio for iSeries: List Price, $79.95
Getting Started With WebSphere Development Studio Client for iSeries: List Price, $89.00
Getting Started with WebSphere Express for iSeries: List Price, $49.00
WebFacing Application Design and Development Guide: List Price, $55.00
Can the AS/400 Survive IBM?: List Price, $49.00
The All-Everything Machine: List Price, $29.95
Chip Wars: List Price, $29.95


 
The Linux Beacon
Why Blade Servers Still Don't Cut It, and How They Might

Intel Keeps Both Arms Swinging with Xeons, Jabs with Itanium

Microsoft Ponies Up Another $100 Million for Novell Linux

Mad Dog 21/21: Newtonian Economics

Two More Xeon-Based Galaxy Servers from Sun

Four Hundred Stuff
A Bumblebee for BI--Now That's Just 'Smart'

Curbstone Gains PCI Compliance for i OS Payment System

Life is Easy for iPhone Apps on the Morph Labs Cloud

WebClient for CA Plex 1.4 Now Available

Avnet to Resell VDoc Content Management Suite in U.S.

Big Iron
For Some Customers, the Mainframe Is Green

Top Mainframe Stories From Around the Web

Chats, Webinars, Seminars, Shows, and Other Happenings

Four Hundred Guru
Automatic or Static Storage?

Jetty: An Efficient, Easy to Manage Alternative to WebSphere

Admin Alert: Giving Auditors What They Want

System i PTF Guide
August 23, 2008: Volume 10, Number 34

August 16, 2008: Volume 10, Number 33

August 9, 2008: Volume 10, Number 32

August 2, 2008: Volume 10, Number 31

July 26, 2008: Volume 10, Number 30

July 19, 2008: Volume 10, Number 29

The Windows Observer
Citrix Addresses Performance with XenApp 5

Server Buyers Shop Like It's 1999 in the Second Quarter

Intel Keeps Both Arms Swinging with Xeons, Jabs with Itanium

Mad Dog 21/21: Newtonian Economics

Microsoft Does Something About Those SQL Injection Attacks

The Unix Guardian
What the Heck Is the Midrange, Anyway?

Overseas and Notebook Sales Offset Printer Declines for HP in Q3

Two More Xeon-Based Galaxy Servers from Sun

Mad Dog 21/21: Newtonian Economics

Intel's Nehalems to Star at IDF, AMD Pitches Shanghai

Four Hundred Monitor
Four Hundred Monitor's
Full iSeries Events Calendar

THIS ISSUE SPONSORED BY:

Bytware
Vision Solutions
BCD
Computer Keyes
WorksRight Software


Printer Friendly Version


TABLE OF CONTENTS
Expanded Power Systems i Boxes on the Horizon?

Entry Power System i Boxes Compete Well with Windows Boxes

X64 Servers See Pricing Pressure in Q2, Big Box Sales Grow

The Law of Attraction

Arrow Says Midrange Shops More Worried About Security than Money

But Wait, There's More:

CIOs in the States Say IT Hiring Still Happening in Q4 . . . IBM Hosts Power Systems Tech Conferences This Week . . . CA and IBM Pull Together for CMDB Interoperability . . . VAI Partners with BFC Associates to Go After the Food Market . . . LTO Tapes: Over 100 Million Served . . .

The Four Hundred

BACK ISSUES





 
Subscription Information:
You can unsubscribe, change your email address, or sign up for any of IT Jungle's free e-newsletters through our Web site at http://www.itjungle.com/sub/subscribe.html.

Copyright © 1996-2008 Guild Companies, Inc. All Rights Reserved.
Guild Companies, Inc., 50 Park Terrace East, Suite 8F, New York, NY 10034

Privacy Statement