• The Four Hundred
  • Subscribe
  • Media Kit
  • Contributors
  • About Us
  • Contact
Menu
  • The Four Hundred
  • Subscribe
  • Media Kit
  • Contributors
  • About Us
  • Contact
  • Power-BladeCenter Combo Gets Tweaks for i Shops

    May 11, 2009 Timothy Prickett Morgan

    As part of the recent batch of Power Systems announcements on April 28, IBM made some important changes to the hardware and software relating to Power-based blade servers and the BladeCenter chassis that makes that subset of the product line usable by the i shops.

    First and most importantly, the Virtual I/O Server that runs inside of a PowerVM logical partition and acts as a virtualized interface to disk and tape controllers and their media for the Power-based JS12, JS22, JS23, and JS43 blade servers can now support virtual tape. What this means, in something akin to plain English, is that an i 6.1 partition can invoke native SAVE/RESTORE commands or use Backup Restore Media Services (BRMS) commands and talk through VIOS to the actual iron. Up until now, doing an archive on an i-based Power blade required customers to back the blade up to disk first and then do a tape backup off the disks. IBM is also allowing LTO-4 drives attached to Power blades and their VIOS to read backup tapes from LTO-2, LTO-3, and LTO-4 drives, which greatly helps with migrating from rack and tower Power servers to the blades. The TS2240 and 7214 Model 1U2 LTO-4 tape drives are the only drives that have this virtual tape support, however. Customers need to be on i 6.1 with all the applicable patches, VIOS 2.1.1, and PowerVM’s hypervisor microcode (which is known internally as eFW) at the 3.4.2 level.

    The BladeCenter chassis has had a RAID 5 feature for integrated SAS disk modules and their switch for a while, but apparently i 6.1 did not support the RAID 5 parts of the controller and could only do RAID 1 mirroring. Anyway, now RAID 5 is enabled on this SAS switch for i 6.1. The TS2240 tape drive mentioned above physically links to the BladeCenter through this SAS switch, by the way. A BladeCenter chassis can support up to a dozen SAS drives across two six-drive modules and users must create RAID sets for i 6.1 that are separate from Windows partitions used for X64-based blade servers that i shops will want to consolidate onto BladeCenter S office and BladeCenter H data center chasses. The RAID 5 functionality for the SAS switch requires VIOS 2.1.0 or higher and the latest PowerVM firmware (which I presume is also eFW 3.4.2, but IBM didn’t say).

    The BladeCenter S i Edition was also tweaked as part of the announcements, with IBM boosting the main memory on the single-core JS12 blade from 2 GB to 4 GB. The setup also includes a new copper pass-though module (which costs $1,299) and i 6.1 and VIOS preinstalled and ready to rock with virtual tape setup. The DS3200 array is also supported on this JS12 entry setup if customers need more storage capacity than the integrated SAS modules offer. The base BladeCenter S i Edition has a JS12 with two 3.8 GHz Power6 cores, 4 GB of memory, two 146 GB SAS disks on the blade, two more in the SAS module with its switch, and a BladeCenter S chassis with all the gadgets needed to link this together, complete with i 6.1 and PowerVM Standard Edition, plus a year of Software Maintenance, for $13,244.

    RELATED STORIES

    Sundry Spring Power Systems Storage Enhancements

    Power Systems Finally Get Solid State Disks

    New Power6+ Iron: The Feeds and Speeds

    IBM Launches Power6+ Servers–Again

    IBM Adds New SAS, SSD Disks to Servers

    Sundry October Power Systems Announcements

    IBM Doubles the Cores on Midrange Power Systems

    Various System i and Power Systems i Nips and Tucks

    Power Systems Memory Prices Slashed to Promote Virtualization

    Sundry July Power Systems Announcements



                         Post this story to del.icio.us
                   Post this story to Digg
        Post this story to Slashdot

    Share this:

    • Share on Reddit (Opens in new window) Reddit
    • Share on Facebook (Opens in new window) Facebook
    • Share on LinkedIn (Opens in new window) LinkedIn
    • Share on X (Opens in new window) X
    • Email a link to a friend (Opens in new window) Email

    Tags: Tags: mtfh_rc, Volume 18, Number 18 -- May 11, 2009

    Sponsored by
    ARCAD Software

    AI is opening new possibilities for IBM i modernization, but for business-critical applications, performance alone is not enough: managing risks remains essential.

    How do BOB, Claude, and ARCAD Transformer RPG compare in converting RPG code to free-form RPG?

    Join Alan Ashley, Sr. Solutions Architect, as he presents a hands-on benchmark comparing these three solutions.

    Beyond conversion performance, discover how to minimize modernization risks through automated regression testing, validating application behavior and detecting unintended changes before they impact business operations.

    During this session, you’ll discover:

    • Compare code conversion performance: BOB vs. Claude vs. ARCAD Transformer RPG
    • Understand the role of deterministic automation alongside AI in a comprehensive IBM i modernization strategy
    • Accelerate RPG code transformation with predictable, rule-based processes
    • Reduce business risks through automated regression testing with ARCAD Verifier
    • Build a controlled, auditable modernization process that protects business-critical applications

    Register now for this webinar to discover how ARCAD Software’s deterministic modernization solutions complement AI initiatives, providing a structured, repeatable, and controlled approach to application transformation.

    Share this:

    • Share on Reddit (Opens in new window) Reddit
    • Share on Facebook (Opens in new window) Facebook
    • Share on LinkedIn (Opens in new window) LinkedIn
    • Share on X (Opens in new window) X
    • Email a link to a friend (Opens in new window) Email

    Middleware Sales Are Slipping, But Could Rebound First Data Integration Specialist XAware Acquired by Sparxent

    Leave a ReplyCancel reply

TFH Volume: 18 Issue: 18

This Issue Sponsored By

    Table of Contents

    • Sundry Spring Power Systems Storage Enhancements
    • IBM Wheels and Deals on Power 570s and 595s in Q2
    • Micro Focus to Buy Borland, Compuware Unit for Testing Tools
    • As I See It: Ah, Vacation!
    • Middleware Sales Are Slipping, But Could Rebound First
    • Power-BladeCenter Combo Gets Tweaks for i Shops
    • Data Integration Specialist XAware Acquired by Sparxent
    • Economic Meltdown Puts Pressure on Jack Henry
    • Performance Tuning and Automation Form a Potent Pair
    • SAP Boots Business ByDesign SaaS Apps to 2010?

    Content archive

    • The Four Hundred
    • Four Hundred Stuff
    • Four Hundred Guru

    Recent Posts

    • Bob Code Assistant Gets Better Understanding Of IBM i Applications
    • IBM i In The Cloud And The Case For Reversing Replication
    • Guru: From Hiking Boots To Long-Term Memory
    • Inside IBM’s New PowerHA Cloud Offering, Full System Manager
    • IBM i PTF Guide, Volume 28, Number 39
    • Power Systems Turns In Another Great Quarter
    • Big Blue Is Right On Schedule With Fall 2026 IBM i Tech Refreshes
    • Guru: Environment Variables – Global Variables Wearing Hiking Boots
    • A New IBM i Entity Takes Shape: Power By Fortra
    • IBM i PTF Guide, Volume 28, Number 38

    Subscribe

    To get news from IT Jungle sent to your inbox every week, subscribe to our newsletter.

    Pages

    • About Us
    • Contact
    • Contributors
    • Four Hundred Monitor
    • IBM i PTF Guide
    • Media Kit
    • Subscribe

    Search

    Copyright © 2025 IT Jungle