• The Four Hundred
  • Subscribe
  • Media Kit
  • Contributors
  • About Us
  • Contact
Menu
  • The Four Hundred
  • Subscribe
  • Media Kit
  • Contributors
  • About Us
  • Contact
  • IBM Has A Fire Sale on BNT Rack Switches

    July 25, 2011 Timothy Prickett Morgan

    I guess that IBM has a bunch of Gigabit Ethernet switches sitting in the barn and it wants to get rid of them real bad before the end of the year without having to make any sales calls to get the job done.

    Last week, in announcement letter 311-101, Big Blue, which is now a network equipment maker thanks to last year’s acquisition of Blade Network Technologies for an estimated $400 million, slashed the price on one of its top-of-rack switches. Specifically, IBM chopped the price on the RackSwitch G8052, a 1U rack-based switch with 48 Gigabit Ethernet ports and four SFP+ ports running at 10 Gigabit Ethernet speeds. IBM list price for this switch is $8,949, but if you buy one from IBM’s online store between now and December 31, then IBM will chop 38.5 percent off the list price.

    At that price, the RackSwitch G8052, which has 176Gb/sec of switching bandwidth and latencies as low as 1.7 microseconds, has a lower price than the similar RackSwitch 8000, which has the same bandwidth but a slower latency of 4.6 microseconds hopping from port to port. The RackSwitch 8000 also costs $6,999 when you buy it through IBM’s Web site. So obviously, if you are shopping for Gigabit Ethernet switches with 10GE uplinks, buy the faster switch, not the slower one.

    IBM is not capping the number of RackSwitch G8052 units that you can buy under this deal, which probably is an indication of how many Big Blue has sitting around as well as the intense competition among switch providers these days. Cisco Systems, Mellanox Technologies, Force10 Networks (just bought by Dell last week), Juniper Networks, and a slew of others are all grinding against each other to get a slice of the $6 billion data center networking racket.

    RELATED STORIES

    IBM Buys Blade Network to Control Ethernet Switches

    IBM Cuts Deals on Selected Network Switches

    Intelliden Snapped Up by IBM for Network Management

    Hewlett-Packard Eats 3Com for $2.7 Billion

    Cisco to Make Nexus Converged Switches for Blades

    IBM Bundles RAID into BladeCenter S i Edition, Adds Lots of Networking

    The Data Center Is the Computer



                         Post this story to del.icio.us
                   Post this story to Digg
        Post this story to Slashdot

    Share this:

    • Share on Reddit (Opens in new window) Reddit
    • Share on Facebook (Opens in new window) Facebook
    • Share on LinkedIn (Opens in new window) LinkedIn
    • Share on X (Opens in new window) X
    • Email a link to a friend (Opens in new window) Email

    Tags:

    Sponsored by
    Lightedge

    Your IBM Power Cloud Strategy Should Start With “Why?”

    Moving IBM i to the cloud isn’t just an infrastructure decision.

    A hardware refresh, data center exit, IBM i skills gap, disaster recovery requirement, or broader cloud initiative can each lead to a very different architecture.

    At Lightedge, we start by understanding what you’re trying to accomplish. Then we look at the workload, application dependencies, resiliency requirements, operating model, and long-term strategy to determine where that workload belongs.

    Managed IBM Power cloud? IBM Power Virtual Server? DR in the cloud? A hybrid architecture connecting IBM Power with AWS or Azure?

    There isn’t one right answer for every IBM i environment.

    Start with the business requirement. Understand the workload. Then decide where it belongs.

    Explore IBM Power cloud, managed services, and hybrid solutions from Lightedge.

    Share this:

    • Share on Reddit (Opens in new window) Reddit
    • Share on Facebook (Opens in new window) Facebook
    • Share on LinkedIn (Opens in new window) LinkedIn
    • Share on X (Opens in new window) X
    • Email a link to a friend (Opens in new window) Email

    IBM i 7.1 Leads OS Shipments, Pushes Entry Sales Database Revenues on the Rise, So Sayeth the Tracker

    Leave a ReplyCancel reply

Volume 20, Number 26 -- July 25, 2011
THIS ISSUE SPONSORED BY:

Data Storage Corporation
New Generation Software
SkyView Partners
Cosyn
VAULT400

Table of Contents

  • XIV Clustered Disk Arrays Get More Oomph And Capacity
  • Top Concern for i Shops: Making Users Happy
  • IBM Powers Through The Second Quarter
  • RPG Open Access Suffering from Inaccessibility
  • As I See It: Barry, Barry Bad
  • Infor Shares Development Plans for Lawson M3
  • IBM i 7.1 Leads OS Shipments, Pushes Entry Sales
  • IBM Has A Fire Sale on BNT Rack Switches
  • Database Revenues on the Rise, So Sayeth the Tracker
  • Big Blue Doesn’t Compete Against i Cloud Backup Vendors

Content archive

  • The Four Hundred
  • Four Hundred Stuff
  • Four Hundred Guru

Recent Posts

  • PHP’s Evolution On The IBM i Platform Continues
  • Protecting IBM i Data For The AI Revolution
  • Guru: Two More Small But Handy RPG Enhancements: LIKE(*EXT) And %LOOKUPNE
  • IBM i Integration Gives Costco Shoppers Real-Time Inventory
  • IBM i PTF Guide, Volume 28, Number 33
  • IBM “Price Harmonization” Increases For Power Systems Coming In The New Year
  • Code For i Continues To Grow. Here Is What’s New
  • PowerSC: Your One-Stop Shop For Security On IBM i – And Beyond
  • As I See It: You’ve Been Flocked
  • IBM i PTF Guide, Volume 28, Number 32

Subscribe

To get news from IT Jungle sent to your inbox every week, subscribe to our newsletter.

Pages

  • About Us
  • Contact
  • Contributors
  • Four Hundred Monitor
  • IBM i PTF Guide
  • Media Kit
  • Subscribe

Search

Copyright © 2025 IT Jungle