• The Four Hundred
  • Subscribe
  • Media Kit
  • Contributors
  • About Us
  • Contact
Menu
  • The Four Hundred
  • Subscribe
  • Media Kit
  • Contributors
  • About Us
  • Contact
  • IBM Launches 40 Gigabit Ethernet Rack Switch

    October 31, 2011 Timothy Prickett Morgan

    IBM has been wheeling and dealing to try to peddle its Gigabit and 10 Gigabit Ethernet switches from its Blade Network RackSwitch lineup for the past several months, and now it has the launched a new 40 Gigabit Ethernet switch if your network backbones are getting a bit skinny for the traffic load.

    The RackSwitch G8316 is a 1U top-of-racker that has 16 40GE ports using QSFP+ cabling. The switch has a chip that can handle 1.28 Tb/sec of switching bandwidth, and it can handle 960 million packets per second of message passing. The switch ports have under one microsecond of latency on a hop from one 40GE port to another one in the same switch, which is pretty low. It can also be equipped with special SFP+ splitter cables that turn each 40GE port into four 10GE ports, making it effectively a 64-port 10GE switch. So you can start using it as a 10GE switch now and consolidate it down to 40GE switch at some future date. It supports all the modern converged enhanced Ethernet (allowing Fibre Channel traffic over the switch) and data center bridging goodies that most 10GE switches have these days.

    The G8316 will be available on December 28; it costs $35,999. That’s not much of a premium over the $29,999 that IBM is charging for the G8264 switch, which has 48 10GE ports and four 40GE uplinks that can be split four ways, making the same 64 total 10GE ports.

    RELATED STORIES

    IBM Wheels And Deals On 10 Gigabit BNT Switches

    IBM Cuts BNT Switch Tags, Adds Fibre Channel SAN Switches

    IBM Has A Fire Sale on BNT Rack Switches

    IBM Buys Blade Network to Control Ethernet Switches

    IBM Cuts Deals on Selected Network Switches

    Intelliden Snapped Up by IBM for Network Management

    Hewlett-Packard Eats 3Com for $2.7 Billion

    Cisco to Make Nexus Converged Switches for Blades

    IBM Bundles RAID into BladeCenter S i Edition, Adds Lots of Networking

    The Data Center Is the Computer



                         Post this story to del.icio.us
                   Post this story to Digg
        Post this story to Slashdot

    Share this:

    • Reddit
    • Facebook
    • LinkedIn
    • Twitter
    • Email

    Tags:

    Sponsored by
    FOCAL POINT SOLUTIONS GROUP

    IntellaFLASH™

    FPSG is the only hosting provider that offers IntellaFLASH™.  IntellaFLASH was created by FPSG and is an exclusive FPSG solution that provides the following:

    • No User downtime for production backups
    • Supports BRMS and Tivoli Storage Manager
    • Provides near Continuous Data Protection (CDP)
    • Create point-in-time copies of your entire environment within minutes
    • Easy and quickly repeatable
    • Processes are tied into Job Schedulers
    • No user downtime for planned outages
    • No disruption to the send and receive process production, and DR stays in sync during the Switch test
    • Supports heterogeneous environments
    • Create test/development environments on the fly
      ⇒ Simplify operating system/application upgrade testing efforts
      ⇒ Improve quality assurance testing

     

    Watch our IntellaFLASH™ Video to learn more

    Let’s Discuss Your Custom Solution Needs

    ContactUs@FocalPointSg.com

    Follow us on LinkedIn

    focalpointsg.com | 813.513.7402

    Share this:

    • Reddit
    • Facebook
    • LinkedIn
    • Twitter
    • Email

    Limiting How Much Memory a Storage Pool Can Allocate Help/Systems Streamlines IFS Backups with Robot/SAVE 12

    Leave a Reply Cancel reply

Volume 20, Number 37 -- October 31, 2011
THIS ISSUE SPONSORED BY:

BCD
PowerTech
Maxava
Cosyn
VAULT400

Table of Contents

  • Bang For The Buck on Power7 Gen 2 Servers
  • Palmisano Hands The IBM Reins To Rometty
  • IBM To Unchain RPG Open Access?
  • European Slowdown Puts The Profit Squeeze On Avnet
  • Best i Blog Bets: A Top 10 List
  • Disk Drive Shortage Coming Due To Thailand Flooding?
  • 100,000 And Counting in IBM i Grassroots Campaign
  • IBM Launches 40 Gigabit Ethernet Rack Switch
  • Q3 Financial Report Bumps Manhattan Associates Stock
  • What Could IBM Do Instead Of Spending $12.2 Billion On Shares?

Content archive

  • The Four Hundred
  • Four Hundred Stuff
  • Four Hundred Guru

Recent Posts

  • COMMON Set for First Annual Conference in Three Years
  • API Operations Management for Safe, Powerful, and High Performance APIs
  • What’s New in IBM i Services and Networking
  • Four Hundred Monitor, May 18
  • IBM i PTF Guide, Volume 24, Number 20
  • IBM i 7.3 TR12: The Non-TR Tech Refresh
  • IBM i Integration Elevates Operational Query and Analytics
  • Simplified IBM i Stack Bundling Ahead Of Subscription Pricing
  • More Price Hikes From IBM, Now For High End Storage
  • Big Blue Readies Power10 And IBM i 7.5 Training for Partners

Subscribe

To get news from IT Jungle sent to your inbox every week, subscribe to our newsletter.

Pages

  • About Us
  • Contact
  • Contributors
  • Four Hundred Monitor
  • IBM i PTF Guide
  • Media Kit
  • Subscribe

Search

Copyright © 2022 IT Jungle

loading Cancel
Post was not sent - check your email addresses!
Email check failed, please try again
Sorry, your blog cannot share posts by email.