• The Four Hundred
  • Subscribe
  • Media Kit
  • Contributors
  • About Us
  • Contact
Menu
  • The Four Hundred
  • Subscribe
  • Media Kit
  • Contributors
  • About Us
  • Contact
  • IBM Gives Temporary Reprieve For Power8 Core And Memory Activations

    November 14, 2022 Timothy Prickett Morgan

    Big Blue is pretty generous when it comes to having features for past generations of machines available for purchase, even when they are two generations back from whatever it is currently selling. But sooner or later, IBM wants to sell the new machines and it stops selling the old stuff. Even if it is only processor and memory activations on machines that are already in the field, which is the easiest sale in the world because IBM doesn’t really have to do much.

    This may be the most profitable kind of sale that Big Blue does, but sooner or later, the company wants to sell new stuff for a revenue stream more than it wants to have higher profits against a revenue trickle. And it wants to get old stuff out of the field, too.

    Back on September 13, in announcement letter 922-098, IBM withdrew a whole bunch of Power Systems features, some of them effective that say and some of them effective on December 30. Among the many features that were immediately withdrawn from marketing were Power8 core activations and Power8 memory capacity activations on vintage Power8 machines. Now, in announcement letter 122-128, dated October 25, IBM has changed its mind and it is now going to be selling those Power8 core and memory activations until December 31. So, if you have a Power8 machine and you want to stretch it for the next couple of years, you have six weeks to order your CPU and memory upgrades and get them turned on.

    There are a few more withdrawals you need to be aware of.

    In announcement letter 922-114, which came pout on October 25, IBM announced the withdrawal of the factor deconfiguration of a single core on the Power S1022 (which is model 9105-22A) and the Power S1024 (which is model 9105-42A). The withdrawal of a factory deconfiguration is a double negative and a funny thing to boot. In the same announcement, IBM say it will on April 30, 2023 withdraw the specification of AIX and Linux as the primary operating systems and on the partitions of this machine as well as PowerVM Enterprise Edition and IFL memory activations on the Power E850 (8408-E8E) and Power E850E (model 8408-44E) servers. These machines did not run IBM i, which has annoyed us from the beginning.

    And finally, On November 8, in announcement letter 922-125, the ability to not install a pair of SAS RAID feature #EJ0l PCI-Express adapter cards for Power9 and Power10 machines has been withdrawn from marketing effective that day. That’s another double negative!

    Language is weird, isn’t it?

    RELATED STORIES

    Withdrawal Symptoms: A Bunch Of IBM Services Tweaks, Storage Deleted

    The Inevitable Wave Of Power9 Withdrawals Begins

    A Shot Across The Bow For Power8 Upgrades

    Some Power9 Tweaks And Withdrawals

    Some More Power Systems Stuff Swept Into The Dustbin

    More Vintage Power Systems Feature Withdrawals

    More Vintage Power Systems Stuff Gets The Plug Pulled

    IBM Pulls The Plug On First Pass Power9 Entry Machines

    Power7 And Power7+ Will Truly Be Dead At The End Of 2020

    The Power S812 Gets Yet Another Stay Of Execution

    Tweaking Systems And Withdrawal Symptoms

    More Withdrawals For Vintage Power Gear

    More Power7 And Power8 Features To Bite The Rust

    IBM Sunsets Big Iron Power8 Engines As Power9 Engines Loom

    IBM Inks In End Of Support For Power6 And Power7 Iron

    Sundry Withdrawals For Power7 And Power7+ Gear

    Clearing The Decks Ahead Of The Power9 Launch

    Say Sayonara To IBM i 7.1 Next Spring

    Some Power Systems Tweaks And Sales Withdrawals

    Sundry Power Systems Withdrawals, New I/O Tweaks

    Share this:

    • Reddit
    • Facebook
    • LinkedIn
    • Twitter
    • Email

    Tags: Tags: AIX, IBM i, Linux, Power E850, Power E850E, Power S1024, Power Systems, Power8, PowerVM Enterprise Edition, SAS RAID

    Sponsored by
    New Generation Software

    FREE Webinar:

    Creating Great Data for Enterprise AI

    Enterprise AI relies on many data sources and types, but every AI project needs a data quality, governance, and security plan.

    Wherever and however you want to analyze your data, adopting modern ETL and BI software like NGS-IQ is a great way to support your effort.

    Webinar: June 26, 2025

    RSVP today.

    www.ngsi.com – 800-824-1220

    Share this:

    • Reddit
    • Facebook
    • LinkedIn
    • Twitter
    • Email

    IBM i PTF Guide, Volume 24, Number 46 A Few More Power Systems Updates Before 2022 Ends

    Leave a Reply Cancel reply

TFH Volume: 32 Issue: 77

This Issue Sponsored By

  • Fresche Solutions
  • DRV Technologies
  • WorksRight Software
  • ARCAD Software
  • TL Ashford

Table of Contents

  • Data Is Streaming Into The Cloud, Including From IBM i
  • Court Throws Out Lawsuit From Chinese Power Systems Partner Against Big Blue
  • A Few More Power Systems Updates Before 2022 Ends
  • IBM Gives Temporary Reprieve For Power8 Core And Memory Activations
  • IBM i PTF Guide, Volume 24, Number 46

Content archive

  • The Four Hundred
  • Four Hundred Stuff
  • Four Hundred Guru

Recent Posts

  • FAX/400 And CICS For i Are Dead. What Will IBM Kill Next?
  • Fresche Overhauls X-Analysis With Web UI, AI Smarts
  • Is It Time To Add The Rust Programming Language To IBM i?
  • Is IBM Going To Raise Prices On Power10 Expert Care?
  • IBM i PTF Guide, Volume 27, Number 20
  • POWERUp 2025 –Your Source For IBM i 7.6 Information
  • Maxava Consulting Services Does More Than HA/DR Project Management – A Lot More
  • Guru: Creating An SQL Stored Procedure That Returns A Result Set
  • As I See It: At Any Cost
  • IBM i PTF Guide, Volume 27, Number 19

Subscribe

To get news from IT Jungle sent to your inbox every week, subscribe to our newsletter.

Pages

  • About Us
  • Contact
  • Contributors
  • Four Hundred Monitor
  • IBM i PTF Guide
  • Media Kit
  • Subscribe

Search

Copyright © 2025 IT Jungle